2026-10-13 WS City Council Agenda
Richfield City Council Agenda
October 13, 2026 -- 5:30 PM
Richfield Municipal Center
Bartholomew Conference Room
6700 Portland Avenue South
1. Call to Order
2. Item Discussion
a. Parks Master Plan
b. Wood Lake Nature Center Building Update
3. Adjournment
Auxiliary aids for individuals with disabilities are available upon request. Requests must be made at least 96 hours in advance to the
City Clerk at 612-861-9739.
Includes Materials - Materials relating to these agenda items can be found in the Council Chambers Agenda Packet book located by
the entrance. The complete Council Agenda Packet is available electronically on the City of Richfield website.
Page 1 of 41
City Council Meeting 10/13/2026
Agenda Section: Item Discussion
Agenda Item: 2.a.
Report Prepared By:
Karl Huemiller, Recreation Director
Department Director:
Karl Huemiller, Recreation Director
Item for Consideration:
Parks Master Plan
EXECUTIVE SUMMARY
In spring 2026, the City of Richfield began developing a new Parks Master Plan to guide
the future of the park system over the next 20 years. The plan will establish long-term
priorities for park development and investment. It also includes an analysis of current
programming and operations with recommendations for improvements. The Parks
Master Plan will be integrated into the City's comprehensive plan.
The City is currently wrapping up the first phase of the planning process, Listen + Learn.
This phase focused on understanding existing conditions and hearing directly from the
community about how they use Richfield’s parks, what is working well, and where there
are opportunities for improvement. To this end, the City created an engagement website
last spring to solicit resident feedback for the Parks Master Plan. The website featured a
pinpoint map where comments could be geolocated, visioning questions, activities to
understand preferences, a priorities activity, and an open comment space. Yard signs
with QR codes linking to the website were placed in the parks, Emails encouraging
people to contribute were sent out, and information was included in the Hometown
Guide. In addition to the website, ETC Institute conducted a statistically valid survey,
staff held tabling events at every park, and hosted 4 focus groups. Through these
efforts, hundreds of comments have been received on the current state of the parks and
what residents want to see in the future.
This work session will provide an update on the Parks Master Plan, including the
planning process and project deliverables, and key themes emerging from community
feedback. Mo Convery and Brad Aldrich of Confluence, the City’s project consultant, will
lead the session.
RECOMMENDED ACTION
For discussion only - no action needed.
HISTORICAL CONTEXT
Parks plans were last completed during the comprehensive plan planning processes in
2008 and 2018. This Parks Master Plan is being completed prior to the comprehensive
plan planning process but will be included in the upcoming comprehensive plan.
EQUITABLE OR STRATEGIC CONSIDERATIONS OR IMPACTS
Page 2 of 41
The Parks Master Plan will guide park development across the City over the next 10
years. Through the engagement process, we heard from community members
representing a wide range of neighborhoods, languages, ages, abilities, and cultural
backgrounds, including groups that have historically been underrepresented in City
planning efforts. Incorporating this feedback as we shape the roadmap for Richfield’s
parks over the next 10 and 20 years is essential to ensuring an equitable park system
and programming catalog that reflects the needs of all residents.
POLICIES (RESOLUTIONS, ORDINANCES, REGULATIONS, STATUTES, ETC.)
None
CRITICAL TIMING ISSUES
The Parks Master Plan must be completed before the Comprehensive Plan review
period in June 2028.
FINANCIAL IMPACT
The Parks Master Plan funding was included in the 2026 Capital Improvement Budget.
LEGAL CONSIDERATIONS
None
ALTERNATIVE RECOMMENDATION(S)
None
ATTACHMENTS
1. Parks Master Plan Presentation
Page 3 of 41
RICHFIELD PARK SYSTEM MASTER PLAN IN ASSOCIATION WITH
PROS CONSULTING
IN ASSOCIATION WITH
PROS CONSULTING
RICHFIELD PARK
SYSTEM MASTER PLAN
RICHFIELD, MN
10/13/2026
PHASE 1
PROJECT UPDATE
Page 4 of 41
RICHFIELD PARK SYSTEM MASTER PLAN IN ASSOCIATION WITH
PROS CONSULTING
TONIGHT’S OBJECTIVES
01 Introduce the Parks Master Plan and planning process
02 Share key findings from the first phase of community engagement
03 Hear your perspectives and validate emerging themes
Page 5 of 41
RICHFIELD PARK SYSTEM MASTER PLAN IN ASSOCIATION WITH
PROS CONSULTING
BRAD ALDRICH
CONFLUENCE
PRINCIPAL-IN-CHARGE
RECREATION SERVICES + PUBLIC WORKS
COMMUNITY + NEIGHBORSSTAFF + KEY STAKEHOLDERS
MO CONVERY
CONFLUENCE
PROJECT MANAGER
JANE REASONER
CONFLUENCE
SENIOR PLANNER +
GIS SPECIALIST
PROS CONSULTING
Jayne Miller
Equitable Strategies
and Park O&M
Travis Tranbarger
Senior Project Manager
CONFLUENCE
PROJECT TEAM
program assessment, asset
management, national trends,
O+M review
COMMUNITY SERVICES COMMISSION
Page 6 of 41
RICHFIELD PARK SYSTEM MASTER PLAN IN ASSOCIATION WITH
PROS CONSULTING
A long-range planning document that establishes a clear, community-
driven 25-YEAR VISION for Richfield’s parks and open spaces.
It provides a framework to:
• ESTABLISH PRIORITIES based on community needs and available resources.
• GUIDE INVESTMENT in parks, facilities, and amenities.
• INFORM DECISIONS for future improvements, operations, and maintenance.
WHAT IS A PARK SYSTEM MASTER PLAN?
Page 7 of 41
RICHFIELD PARK SYSTEM MASTER PLAN IN ASSOCIATION WITH
PROS CONSULTING
WHY IS THIS PLAN IMPORTANT?
RICHFIELD’S PARKS ARE ESSENTIAL COMMUNITY ASSETS
Parks support health, recreation, social connections, strong economies,
neighborhood identity, and quality of life.
COMMUNITY NEEDS ARE EVOLVING
New development, changing demographics, evolving recreation trends, and
environmental conditions are reshaping how residents use and experience parks.
EXISTING PARKS REQUIRE ONGOING INVESTMENT
Thoughtful reinvestment is needed to maintain aging infrastructure, improve
accessibility, and respond to emerging needs.
RESOURCES ARE LIMITED — PRIORITIES MATTER
A shared vision helps the City make informed, equitable, and financially responsible
decisions.
Page 8 of 41
RICHFIELD PARK SYSTEM MASTER PLAN IN ASSOCIATION WITH
PROS CONSULTING
WHAT IS THE PLANNING PROCESS?PHASE 1PHASE 2PHASE 3EXISTING CONDITIONS
+ COMMUNITY
ENGAGEMENT
VISIONING +
PRIORITIZATION
VALIDATION +
MASTER PLAN +
DOCUMENTATION
Assess existing parks,
facilities, programs,
and operations. Listen
to the community to
understand needs,
opportunities, and
priorities.
Establish a shared
vision and guiding
principles. Develop
recommendations,
identify improvements,
and prioritize
investments.
Share recommendations
with the community,
refine priorities based on
feedback, and prepare
the final Master Plan.
WHERE WE ARE...
Spring 2026- Summer 2026 Fall 2026 Winter 2026- Spring 2027
Page 9 of 41
RICHFIELD PARK SYSTEM MASTER PLAN IN ASSOCIATION WITH
PROS CONSULTING
DEMOGRAPHICS
• STEADY POPULATION GROWTH: Richfield is projected to experience
continued population and household growth through 2040, increasing
demand for parks and recreational services.
• CHANGING DEMOGRAPHICS: Richfield is becoming increasingly racially
diverse, highlighting the importance of inclusive parks, programming, and
community engagement.
• A BROAD RANGE OF AGES: The population is expected to remain relatively
balanced across age groups, reinforcing the need for multigenerational
recreation opportunities.
• INCREASING HOUSEHOLD INCOME: Median household income is projected
to rise, potentially influencing recreational preferences and demand for
amenities.
• EQUITY AND ACCESSIBILITY: 23% of households include a person with a
disability, and 43.8% of housing units are renter-occupied, emphasizing the
importance of accessible and affordable recreation.
• BARRIERS TO PARTICIPATION: Language, income, transportation, and
accessibility may influence how residents experience and use the park
system.
Page 10 of 41
RICHFIELD PARK SYSTEM MASTER PLAN IN ASSOCIATION WITH
PROS CONSULTING
MADISON
PARK
SHERIDAN PARK
JEFFERSON
PARK
ADAMS HILL
PARK
DONALDSON
PARK
WOOD LAKE
NATURE CENTER
FREMONT
PARK LINCOLN FIELDPARK
ROOSEVELT PARK
AUGBURG PARK
LITTLE BOBSPARK HEREDIA
PARK
CHRISTIAN
PARK
WASHINGTON PARK
VETERANS MEMORIAL PARK TAFT PARK
RICHFIELD
LAKE PARK
APPLE BLOSSOMPARK
PIRATES PLAZA
GARFIELD
PARK
NICOLLETPARK
FAIRWOOD
PARK
MONROE
PARK
DESTINATION PARK
COMMUNITY PARK
NEIGHBORHOOD PARK PLUS
NEIGHBORHOOD PARK
SPECIAL USE/ATHLETIC COMPLEX MINI PARK
REGIONAL TRAIL
OFF-STREET LOCAL TRAIL
ON-STREET LOCAL TRAIL
W 77th Street
E 66th Street
Cedar AvenueLyndale Avenue SPenn Avenue SW 76th Street
W 66th Street
I-35WI-35WI-35W
I-494
SYSTEM FINDINGS
With 23 parks and 461 acres of developed
parkland, approximately 10% of Richfield’s
land is dedicated to parks. (Twin Cities
7-county Metro Region is 9.2%, Minneapolis is
16%, Bloomington is 6.4%, Edina is 15.4%).
• Mini Parks: 1 park | 0.6 acres
• Neighborhood Parks: 5 parks | 4.69 acres
• Neighborhood Plus Parks: 7 parks | 47.9
acres
• Community Parks: 3 parks | 55.6 acres
• Destination Parks*: 3 parks | 282 acres
• Athletic Complexes** / Special Use Parks:
4 parks | 70.6 acres
*60% of the City’s parkland is concentrated
in three destination parks.
** Athletic Complexes also serve as
neighborhood parks
CURRENT SYSTEM
WARD 1 WARD 2 WARD 3
Page 11 of 41
RICHFIELD PARK SYSTEM MASTER PLAN IN ASSOCIATION WITH
PROS CONSULTING
MADISON
PARK
SHERIDAN PARK
JEFFERSON
PARK
ADAMS HILL
PARK
DONALDSON
PARK
WOOD LAKE
NATURE CENTER
FREMONT
PARK LINCOLN FIELDPARK
ROOSEVELT PARK
AUGBURG PARK
LITTLE BOBSPARK HEREDIA
PARK
CHRISTIAN
PARK
WASHINGTON PARK
VETERANS MEMORIAL PARK TAFT PARK
RICHFIELD
LAKE PARK
APPLE BLOSSOMPARK
PIRATES PLAZA
GARFIELD
PARK
NICOLLETPARK
FAIRWOOD
PARK
MONROE
PARK
DESTINATION PARK
COMMUNITY PARK
NEIGHBORHOOD PARK PLUS
NEIGHBORHOOD PARK
SPECIAL USE/ATHLETIC COMPLEX MINI PARK
REGIONAL TRAIL
OFF-STREET LOCAL TRAIL
ON-STREET LOCAL TRAIL
5- MIN WALK
10- MIN WALK
15- MIN WALK
W 77th Street
E 66th Street
Cedar AvenueLyndale Avenue SPenn Avenue SW 76th Street
W 66th Street
I-35WI-35WI-35W
I-494
SYSTEM FINDINGS
Three areas have notable gaps in walkable
park access, defined as residential areas
located more than a 10-minute walk from an
existing park.
Of particular interest is the southeast gap.
Parks adjacent to this area are primarily
special-use or athletic facilities.
Higher concentration of neighborhood and
neighborhood plus parks in the north and
northeast of the City.
Destination Parks are concentrated in the
north and northcentral ares of the city.
CURRENT PARK SERVICE AREAS
GAP 1 GAP 2
GAP 3
STEM ELEMENTARY + RICHFIELD DUAL LANGUAGE
Page 12 of 41
RICHFIELD PARK SYSTEM MASTER PLAN IN ASSOCIATION WITH
PROS CONSULTING
SYSTEM FINDINGS
High Level of Basic Services: Amenities are well
distributed throughout the park system
• Most parks offer the typical suite of recreational amenities, including
walking paths, ball diamond, flexible-use field, courts, gathering
spaces, and playgrounds.
Natural Resource Connections: The majority of parks offer
opportunities to experience nature (ponds, stormwater
features, mature tree canopies, or naturalized landscapes).
Notable gap in the south of the City.
Regional Trail Connectivity: Richfield benefits from strong
connections to the regional trail network, supporting
walking, biking, and recreation. These trails provide
connections within Richfield and to adjacent communities.
Destination Facilities: Larger parks provide amenities
uncommon for a city of Richfield’s size, including a nature
center, indoor ice arena, and outdoor pool. These are
valuable community resources that require significant
ongoing investment.
MADISONPARK
SHERIDAN PARK
JEFFERSON PARK
ADAMS HILLPARK
DONALDSONPARK
WOOD LAKE NATURE CENTER
FREMONT PARK LINCOLN FIELDPARK
ROOSEVELT PARK
AUGBURG PARK
LITTLE BOBSPARK HEREDIA PARK
CHRISTIANPARK
WASHINGTON PARK
VETERANS MEMORIAL PARK TAFT PARK
RICHFIELD LAKE PARK
APPLE BLOSSOMPARK
PIRATES PLAZA
GARFIELDPARK
NICOLLETPARK
FAIRWOOD PARK
MONROE PARK
DESTINATION PARK
COMMUNITY PARK
NEIGHBORHOOD PARK PLUS
NEIGHBORHOOD PARK
SPECIAL USE/ATHLETIC COMPLEX MINI PARK
REGIONAL TRAIL
OFF-STREET LOCAL TRAIL
ON-STREET LOCAL TRAIL
W 77th Street
E 66th Street
Cedar AvenueLyndale Avenue SPenn Avenue SW 76th Street
W 66th Street
I-35WI-35WI-35W
I-494
MADISONPARK
SHERIDAN PARK
JEFFERSON PARK
ADAMS HILLPARK
DONALDSONPARK
WOOD LAKE NATURE CENTER
FREMONT PARK LINCOLN FIELDPARK
ROOSEVELT PARK
AUGBURG PARK
LITTLE BOBSPARK HEREDIA PARK
CHRISTIANPARK
WASHINGTON PARK
VETERANS MEMORIAL PARK TAFT PARK
RICHFIELD LAKE PARK
APPLE BLOSSOMPARK
PIRATES PLAZA
GARFIELDPARK
NICOLLETPARK
FAIRWOOD PARK
MONROE PARK
DESTINATION PARK
COMMUNITY PARK
NEIGHBORHOOD PARK PLUS
NEIGHBORHOOD PARK
SPECIAL USE/ATHLETIC COMPLEX MINI PARK
REGIONAL TRAIL
OFF-STREET LOCAL TRAIL
ON-STREET LOCAL TRAIL
OPEN WATER
FORESTED AREA/ MATURE TREE CANOPY
W 77th Street
E 66th Street
Cedar AvenueLyndale Avenue SPenn Avenue SW 76th Street
W 66th Street
I-35WI-35WI-35W
I-494
PARKS WITH PLAYGROUNDS
PARKS WITH NATURAL FEATURES
Page 13 of 41
RICHFIELD PARK SYSTEM MASTER PLAN IN ASSOCIATION WITH
PROS CONSULTING
This preliminary Level
of Service Analysis
compares Richfield's
existing parkland and
recreational facilities with
national benchmarks
to provide a baseline
understanding of the
park system.
Currently evaluating
local and regional
comparisons and cross-
reference findings with
community engagement
feedback, identified
needs, and resident
priorities to inform future
recommendations and
investments.
MEETS OR EXCEEDS NATIONAL STANDARD
BELOW NATIONAL STANDARD
Page 14 of 41
RICHFIELD PARK SYSTEM MASTER PLAN IN ASSOCIATION WITH
PROS CONSULTING
PARK EQUITY SCORE
The Park Equity Analysis is a data-driven
tool developed to identify areas of Richfield
where residents may face greater barriers
to accessing parks and recreational
opportunities.
After extensive dialogue the City
determined 8 variables to develop the score
• Estimated population change (2026–
2031)
• Median household income
• Population under age 18
• Population age 65+
• BIPOC population
• Households with a person with a
disability
• Households without vehicle access
• Buildings with 3+ residential unit
Equity is not simply about where parks
are located, but whether residents have
meaningful access to the recreational
opportunities they need.
HIGH PRIORITY
LOW PRIORITY
Page 15 of 41
RICHFIELD PARK SYSTEM MASTER PLAN IN ASSOCIATION WITH
PROS CONSULTING
PHASE 1:
ENGAGEMENT
LISTEN + LEARN
The purpose of Phase 1 engagement
is to understand how the community
currently uses and experiences
Richfield’s parks, what is working
well, and where opportunities for
improvement exist.
These findings, combined with the
existing conditions analysis, will
establish a foundation for developing
the vision, recommendations, and
priorities for the Park System Master
Plan.PHASE 1 ENGAGEMENT TOOLSSOCIAL PINPOINT DIGITAL WEBSITE
• COMMENT MAPPING TOOL
• PRIORITIES SELECTION
• CONTINUUM STATEMENTS
FOCUS GROUP CONVERSATIONS
• ACCESSIBILITY WORKING GROUP
• SPORT ASSOCIATIONS
• FAMILIES
• SENIORS
MEET PEOPLE WHERE THEY ARE
• COMMUNITY EVENT TABLING
• COMMUNITY CENTER LOBBY MATERIALS
PARK TABLING
• ALL PARKS HAD A UNIQUE TABLING EVENT (FAIRWOOD,
APPLEBLOSSOM, AND MONROE COMBINED)
STATISTICALLY VALID SURVEY
• 363 SURVEYS FROM A REPRESENTATIVE
SAMPLE OF RICHFIELD RESIDENTS
Page 16 of 41
RICHFIELD PARK SYSTEM MASTER PLAN IN ASSOCIATION WITH
PROS CONSULTING
STATISTICALLY
VALID SURVEY
363 Completed Surveys
(a precision of at least +/- 5.1% at the 95% level of confidence)
MAJOR THEMES
Strong Park Use and Satisfaction: 95% of surveyed households visited
a Richfield park in the past year, with 88% rating park quality as good or
excellent.
Focus on Existing Parks: 92% support improving existing parks, with
strong support for natural area improvements (91%) and walking and
biking trails (88%).
Neighborhood Parks and Nature Are Priorities: Neighborhood parks,
natural areas, and paved trail connections rank among residents' most
important amenities.
Opportunities for Indoor Recreation: Indoor fitness and wellness spaces,
walking tracks, and community gathering spaces emerged as important
needs.
Recreation Programming: Adult fitness, swimming lessons, special
events, and environmental education are among the highest investment
priorities.
Awareness and Participation Barriers: 35% of nonparticipants (very low)
reported not knowing what recreation programs are offered, suggesting
opportunities to improve communication and outreach.
Page 17 of 41
RICHFIELD PARK SYSTEM MASTER PLAN IN ASSOCIATION WITH
PROS CONSULTING
SOCIAL
PINPOINT
MAY 2026- OCTOBER 2026
1731 Visitors
938 Contibutions (337
Contributors)
MAPPING EXERCISE MAJOR THEMES
Strong Appreciation for Existing Parks: Residents value their neighborhood parks,
playgrounds, natural areas, and community gathering spaces, with a desire to
preserve what is already working well.
Natural Areas and Environmental Stewardship: Strong interest in protecting
mature trees, wildlife habitats, and natural areas while expanding native
landscaping, pollinator gardens, and ecological restoration.
Trail Connectivity and Accessibility: Residents value existing walking and biking
trails but identify opportunities for improved maintenance, safer crossings, better
connections, and year-round accessibility.
Maintenance and Reinvestment: Recurring requests for improvements to
trails, sports courts, playgrounds, and park facilities, along with better ongoing
maintenance.
Comfort and Basic Amenities: Desire for more shade, drinking fountains,
permanent restrooms, benches, and gathering spaces to improve everyday park
experiences.
Diverse Recreation Opportunities: Interest in expanded play opportunities, dog
parks, sports facilities, winter recreation, and programming for different ages and
abilities across the system.
Balancing Recreation and Open Space: Residents value flexible green spaces for
informal recreation and emphasize balancing new amenities with the preservation
of natural areas and existing park uses.
Page 18 of 41
RICHFIELD PARK SYSTEM MASTER PLAN IN ASSOCIATION WITH
PROS CONSULTING
PRIORITIES SUMMARYSOCIAL
PINPOINT
MAY 2026- OCTOBER 2026
1731 Visitors
938 Contibutions (337
Contributors)
154 Completed Priorities
Page 19 of 41
RICHFIELD PARK SYSTEM MASTER PLAN IN ASSOCIATION WITH
PROS CONSULTING
SOCIAL
PINPOINT
MAY 2026- OCTOBER 2026
1731 Visitors
938 Contibutions Overall
(337 Contributors)
150 Completed Continuum
Statements
CONTINUUM STATEMENTS
Focus on Existing Parks: Strong preference for improving existing parks
rather than adding new amenities or facilities.
Distributed Investments: Residents favor smaller improvements across
multiple parks over concentrating resources in one or two major projects.
Nature Throughout the System: Strong preference for incorporating natural
features into every park rather than concentrating nature in a few larger
natural areas.
Flexible, Informal Recreation: Residents lean toward open spaces for
informal play, gathering, and exploration rather than organized sports
facilities.
Variety and Unique Experiences: Strong preference for playgrounds and
park amenities that offer different experiences from park to park.
Concentrated Sports Facilities: Preference for grouping athletic fields,
courts, and ball diamonds in fewer parks rather than distributing them
throughout the system.
Evolving Winter Recreation: Interest in focusing winter programming and
amenities in a few locations.
Page 20 of 41
RICHFIELD PARK SYSTEM MASTER PLAN IN ASSOCIATION WITH
PROS CONSULTING
FOCUS GROUP
CONVERSATIONS
• ACCCESSIBILITY WORKING GROUP (5
PARTICIPANTS)
• SPORT ASSOCIATIONS (6 PARTICIPANTS)
• FAMILIES (4 PARTICIPANTS)
• SENIORS (8 PARTICIPANTS)
ATTENDEES PARTICIPATED IN
A GAME VERSION OF A SWOT
ACTIVITY (STRENGTHS, WEAKNESS,
OPPORTUNITIES, THREATS)
ACCESSIBILITY WORKING GROUP
• need for basics : clear and smooth pathways, parking, accessible buildings, and
spaces within buildings
• integrated programming
• strength of the system is the accessible playground at Augsburg
SPORT ASSOCIATIONS (6 PARTICIPANTS)
• outdoor recreation facilities are gems in the region!
• neighborhood parks are an incredible resource
• huge need for indoor space (all season). Need for more fields overall. potential
for more courts
• the changing interests in sports is constant
• desire and need to support both organized sports and community open use of
facilities
FAMILIES (4 PARTICIPANTS)
• small neighborhood parks are gems!
• need for more regular trash and maintenance = improve feelings or pride and
safety
• opportunities for youth volunteer engagement and programming
• Need for more eyes on the park
• love green open spaces
SENIORS (8 PARTICIPANTS)
• there are unique resources that are really loved within the community that
should be protected (community gardens, farmers market, pool, augsburg)
• neighborhood parks are gems!
• need to improve basic accessibility (pathways, parking, shade)
• protect natural resources
Page 21 of 41
RICHFIELD PARK SYSTEM MASTER PLAN IN ASSOCIATION WITH
PROS CONSULTING
QUESTION 1 |
FROM THE INFORMATION SHARED TONIGHT, WHAT
RESONATES WITH YOU?
Page 22 of 41
RICHFIELD PARK SYSTEM MASTER PLAN IN ASSOCIATION WITH
PROS CONSULTING
QUESTION 2 |
DO THESE FINDINGS REFLECT WHAT YOU’RE HEARING
FROM THE COMMUNITY? WHAT’S MISSING?
Page 23 of 41
RICHFIELD PARK SYSTEM MASTER PLAN IN ASSOCIATION WITH
PROS CONSULTING
QUESTION 3 |
ARE THERE ANY TENSIONS OR COMPETING PRIORITIES
IN WHAT WE’VE HEARD FROM THE COMMUNITY THAT
YOU THINK DESERVE FURTHER EXPLORATION?
Page 24 of 41
RICHFIELD PARK SYSTEM MASTER PLAN IN ASSOCIATION WITH
PROS CONSULTING
QUESTION 4 |
BASED ON WHAT WE’VE LEARNED, WHAT IDEAS OR
PRIORITIES STAND OUT AS PARTICULARLY IMPORTANT
TO CARRY FORWARD INTO THE PARK SYSTEM VISION
STATEMENT?
Page 25 of 41
RICHFIELD PARK SYSTEM MASTER PLAN IN ASSOCIATION WITH
PROS CONSULTING
NEXT STEPS
1. Close Out Phase 1
- Finalize community engagement and existing conditions assessments.
- Finalize the equity analysis tool and other assessments.
2. Phase 2: Visioning & Recommendations
- Develop a draft vision, mission, and guiding principles.
- Identify systemwide recommendations and investment priorities.
- Develop conceptual park plans for selected parks.
3. Community and City Council Check-In
- Share the draft vision, guiding principles, and preliminary recommendations.
- Gather Community and Council feedback to inform refinement of the plan.
4. Phase 3: Master Plan Development
- Refine recommendations and establish implementation priorities.
- Develop the draft Park System Master Plan.
- Prepare the final plan for review and adoption.
Page 26 of 41
City Council Meeting 10/13/2026
Agenda Section: Item Discussion
Agenda Item: 2.b.
Report Prepared By:
Karl Huemiller, Recreation Director
Department Director:
Karl Huemiller, Recreation Director
Item for Consideration:
Wood Lake Nature Center Building Update
EXECUTIVE SUMMARY
The Wood Lake Nature Center building project began design in January 2024.
Construction is now nearing completion with an expected move in date for staff of mid-
October 2026, and the building opening to the public in mid to late November 2026. The
project costs are currently covered by the funding sources available. During the work
session, staff will provide an update on the construction progress and budget for the
Wood Lake Nature Center building construction project.
RECOMMENDED ACTION
No Action
HISTORICAL CONTEXT
None
EQUITABLE OR STRATEGIC CONSIDERATIONS OR IMPACTS
None
POLICIES (RESOLUTIONS, ORDINANCES, REGULATIONS, STATUTES, ETC.)
None
CRITICAL TIMING ISSUES
None
FINANCIAL IMPACT
None
LEGAL CONSIDERATIONS
None
ALTERNATIVE RECOMMENDATION(S)
None
ATTACHMENTS
1. WLNC Update Presentation - R1
Page 27 of 41
Page 28 of 41
Wood Lake Nature Center
Building project timeline and budget update
City Council | October 13, 2026
www.richfieldmn.gov
Page 29 of 41
Project Timeline: Funding
Predesign and securing project funding, 2021 –2024
1 Predesign 2021
City and HGA team defined community needs, preliminary design and cost
model used to raise funds
2 State and Federal Funding 2023
$12M State and $3M Federal funding secured
3 Referendum Authorization 2023
Legislature authorized a local sales tax referendum
4 Local Sales Tax Referendum November 2024
Voters approved the local sales tax, providing $11M
Page 30 of 41
Project Timeline: Design
Architect selection through GMP, 2023 –2025
1 Architect Selected December 2023
2 Program Validation January – May 2024
3 Schematic Design May – August 2024
4 Design Development September – November 2024
5 Construction Documents September 2024 – March 2025
6 GMP Signed February 2025
Page 31 of 41
Project Timeline: Construction
September 2025 to a November 17, 2026 opening
1 Construction Start September 2025
Demolition of the existing building
2 Out of the Ground November 2025
Foundations complete; structure rising
3 Last Timber Beam Raised March 2026
Mass timber structure complete
4 Building Enclosed May 2026
Roof and exterior envelope complete
5 Substantial Completion October 2026
6 Staff Move-In October 19, 2026
7 Grand Opening Tuesday, November 17, 2026
Building opens
Page 32 of 41
Funding Sources
Sources totaling $27.32 million
Source Amount
State funding $12,000,000
Local sales tax $11,000,000
Federal funding $3,000,000
Friends of Wood Lake $300,000*
Allocated CIB and donations $520,512
Capital Fund Interest $477,000
Xcel Energy / CenterPoint rebate $17,828
Federal rebates ?
Returned construction contingency ?
Total $27,315,340
* Friends of Wood Lake account balance: $665,455
Page 33 of 41
Construction: GMP and Change Orders
Mortenson (CM at Risk); fifteen owner change orders executed
CO Month Item Amount
Feb 2025 Original GMP $21,378,425
1 May 2025 Bid alternates $75,776
2 Aug 2025 Additional water line replacement $12,393
3 Sep 2025 NEPA delay, builder's risk, WAC/SAC, asbestos $662,454
4 Sep 2025 ASI 3, security cameras, glulam; signage credit $134,120
5 Nov 2025 ASI 1 and 2 telecom changes $67,179
6 Jan 2026 ASI 4, jellyfish groundwater; contingency credit $83,306
7 Feb 2026 ASI 5, fin tube radiation change $12,363
8 Mar 2026 ASI 6, plumbing revisions, ADA dishwasher $27,028
9 Apr 2026 Staff office knee wall heights $1,443
10 May 2026 ASI 7 (incl. key cards), ASI 8 $82,285
11 Jun 2026 Child toilet, Fire Dept. key box $19,337
12 Jul 2026 ASI 9, playground footings, gate; paver credit $43,344
13 Jul 2026 ASI 10, added trim $25,795
14 Aug 2026 ASI 11, playground curb, casework, striping $13,212
15 Sep 2026 Food truck power, multipurpose casework $14,908
Total change orders (+6.0%)$1,274,943
Current GMP $22,653,368
Page 34 of 41
Architectural and Engineering Fees
Only two amendments added to HGA's base fee
Item Amount
Base agreement $1,703,956
HGA base fee (Dec. 2023)$1,685,956
Reimbursable expenses (est.)$18,000
Additional Services $181,500
Am. 1 Signage, exhibit lighting, FF&E, AV design; commissioning $181,500
City-requested add-ons and extenuating circumstances $80,200
Am. 2 Geothermal redesign and alternates $35,800
Am. 3 State predesign report $30,000
Am. 4 Exhibit coordination $14,400
Additions to the base fee $92,384
Am. 5 Extended construction administration $80,884
Am. 6 Additional construction administration $11,500
Total HGA fees $2,058,040
Additions to the base fee: $92,384 (5.5% of base fee)
Page 35 of 41
Non-Construction Costs
Owner costs outside the construction contract: $392,115
$19,400
$89,474
$108,176
$175,064
Demolition and hazardous materials
abatement
Local Option Sales Tax
State and federal grant requirements
Site investigation, testing, contracting, review
and sewer work
Page 36 of 41
FF&E, IT/AV, Signage and Playground
Owner-purchased items: $798,003
$429,659
FF&E
Furniture, common-area furnishings
and window treatments
$81,416
IT and AV costs
Meeting and classroom AV, digital
signage, Vestaboard
$80,075
Building signage
Contracted separately from
construction
$206,853
Playground
Nature-themed play structures
Page 37 of 41
Exhibits: Phase 1
Designed by Science Museum of Minnesota; installed by opening day
$386,463
Exhibit design (SMM)
Complete and paid
$312,500
Fabrication: Blue
Rhino Studio
Underwater sculpture
and ground form,
cattails, two large
murals
$235,327
Fabrication: SMM
Watershed table,
binocular station,
Everyone's a Naturalist,
Wood Lake History
Exhibit, eBird kiosk,
animal graphics, three
murals
Phase 1 fabrication total: $547,827
Installation begins October 19 and is complete before the November 17 opening.
Page 38 of 41
Exhibits: Phase 2
Funded by the Friends of Wood Lake
Component Vendor Amount
Floor map and viewing stations SMM $52,097
Outdoor bronze muskrat sculpture Blue Rhino Studio $57,700
Classroom murals Blue Rhino Studio $49,420
Phase 2 total $159,217
Scope changes
•Canceled: Night and Day Play Space ($39,542); Biome Balance ($33,229)
•On hold: Paludarium cattails ($42,500)
•Installation: October 19 – November 17, with Phase 1
Page 39 of 41
Budget Overview
Available funds compared with current project budget
$27,315,340
Available funds
$27,111,095
Current project budget
$204,245
Remaining
Budget category Amount
Construction (GMP incl. pending changes)$22,769,431
Architectural and engineering fees $2,058,040
Non-construction costs $392,115
FF&E, IT/AV, signage and playground $798,003
Exhibit design $386,463
Exhibit fabrication, Phase 1 $547,827
Exhibit fabrication, Phase 2 $159,217
Current project budget $27,111,095
* Remaining does not include returned contingency or solar and geothermal rebates
Page 40 of 41
Questions
www.richfieldmn.gov
Grand Opening
Tuesday, November 17, 2026 | 4 p.m.
Wood Lake Nature Center | 6710 Lake Shore Drive
Page 41 of 41