05-13-1997CITY OF R10HRELD ftnnnn; commission nawfl May 13, 1997 SPECIAL PLANNING COMMISSION STUDY SESSION 7:00 p.m. XX............... ........ 1. . .............. .... 11 ITEM #1 PC Letter #14 Review the 1998 Capital Improvement Budget and make a recommendation on the 1999 -2003 Capital Improvement Program ITEM #2 76th Street (East of I -35V) Corridor Study presented by Tom Foley, Transportation Engineer Auxiliary aids for individuals with disabilities are available upon request. Requests must be made, at least 96 hours in advance to the Administrative Service's Director at 861- 9702." Planning Commission Letter May 13, 1997 Agenda Section: Old Business Item #: 1 Letter #: 14 Case #: Type of Request: Applicant /Owner: Location: Zoning: Existing Land Use: Proposed Land Use: Comp. Plan: References: Zoning Code City Code: GENERAL INFORMATION Review the 1998 Capital Improvement Budget and 1999-200' ) Capital Improvement Program and make a recommendation on the Capital Improvement Program. N/A N/A N/A N/A N/A N/A See attached) N/A N/A Public Notice: N/A Hearing Examiner: N/A City Council: Planning Commission action is required for the City Council to complete the annual budget process in a timely manner. HRA: N/A ANALYSIS Proposal: Review additional budget information and make a recommendation on the 1999 -2003 Capital Improvement Plan. History: The Planning Commission is required by City Charter to prepare and recommend a Capital Improvement Program for inclusion in the annual budget message of the City Council. On March 25, 1997, the Planning Commission met in joint session with Community Services Commission and reviewed the 1998 Capital Improvement Budget and the 1999 -2003 Capital Improvement Program. The Commission deferred action on the Capital Improvement Program until May 13, 1997, so that questions regarding specific budget items could be addressed. Administrative Services Director, Steve Devich provided the Planning Commission with the information pertaining to those specific budget questions directly. That information however, is also included with this report. Issues: As a point of clarification, the Planning Commission is required to recommend the Capital Improvement Program; not the Capital Improvement Budget. The Capital Improvement Budget is presented to the Commission as an information item for review. The specific action the commission takes is to recommend the five year Capital Improvement Program. ACTION TO BE TAKEN Recommendation: Recommend that the City Council approve the 1999-2003) Capital Improvement Program. Basis: 1. The Capital Improvement Program has been prepared and submitted for the Planning Commission's review and approval. 2. The Planning Commission is required by City Charter to act on the Capital Improvement Program Alternative: Defer action until May 27, 1997. 1999 -2003 Capital Improvement Program (CIP) April 22, 1997 Meeting Follow -up At the April 22, 1997 concurrent meeting between the Community Services Commission and the Planning Commission, two questions regarding proposed projects needed a response with further information. The two issues are: Retaining Wall Replacement - The retaining wall replacement summary indicated that it would be done with the funding split evenly between the City and the County. However after reviewing the project further, Maintenance Services indicates that the retaining walls to be done in 1998 CIB) which total $45,000 would be split evenly by the City and County. The projects in the 2000 CIP would be paid for solely by the City. This results in a slight reduction of Special Revenue funding needed for the project in 1998. The total $40.000 cost in 2000 would be paid out of Special Revenue funds. Traffic Calming - The traffic calming was a project requested by the City Council to address future traffic related issues in the community. It is currently planned to do traffic calming efforts in the two neighborhoods east and west of Penn Avenue, north of 66th Street in 1997. While there are no specific project areas identified for the future at this time, the project funding has been proposed because it seems quite certain that each year will bring new neighborhood traffic problems to the forefront. CITY OF RICHFIELD Memorandum DATE: April 25, 1997 TO: Planning Commission Members FROM: Gretchen Blank, Acting Recreation Services Director SUBJECT: Wood Lake Nature Center HVAC The heating and air conditioning project in the Manager's 1998 CIB involves replaceing two separate furnaces and one airconditioning unit. Because of their placement and age, there is considerable involvement in removeing the old units and there is also freon abatement required. Replacing the units will increase efficiency from 67% to 93 %, which should reduce enrgy costs significantly each year. 10 i. Executive Summary a a i i BACKGROUND i The City of Richfield is undergoing continuous change and one of the more i dramatic recent changes has been the reconstruction and widening of 77`h Street. S The upgrading of 77`' Street to a minor arterial has changed the role of 761 Street east of I -35V) and, therefore, the purpose and future configuration of 761h Street 70 needs to be reevaluated. i The primary reasons for conducting the 761'' Street (East of I -35V) Corridor Study 30 are, i Reduced TraffIC Demand. Traffic volumes on 76`h Street, west of 30 Lyndale Avenue, have dropped from 12,000 vehicles a day in 1992 to under 6,000 vehicles a day in 1996. 3P Complaints. Residents have complained about traffic, noise, and i speeding problems. Opportunities. Since only two traffic lanes are required for 76`h Street, excess right of way could be utilized for some other, better use. Another factor for examining the improvement and enhancement of the 76`h Street corridor is the need for the City of Richfield to improve the image and value of its neighborhoods in order to attract and retain residents and enable the City to compete with developing suburbs. STUDY PROCESS In the Spring of 1996, the City Council appointed the 76`h Street Corridor Study Task Force to prepare a concept plan for future utilization and configuration of 76" Street. The Task Force, composed of six members representing diverse perspectives and interests, conducted an extensive and thorough study of the corridor issues and conducted two Public Meetings /Open Houses to solicit reactions and input from the citizens of Richfield. In addition, an informational brochure, which is included in the Appendix, was produced for distribution prior to the second Public Meeting /Open House. S 76"' Street (East Of 1 -35W) Corridor Study 1 i i a i i S i 1. Executive Summary The Task Force, with the assistance of the City's consultant and City staff. looked at an Inventory/Analysis of the corridor, identified Project Goals, generated 11 Concept Alternatives, conducted an Alternative Evaluation process, and selected a Recommended Corridor Concept and Implementation Program for the 76`h Street Project. Inventory /Analysis The 76`' Street corridor, for most of its length, has a 60 -foot right -of -way, in- cludes a 4 -lane concrete roadway, a sidewalk on the north side of the roadway for the full length of the corridor as well as one on the south side west of Lyndale Avenue, is located through predominantly single- family residential neighbor- hoods, contains some overhead utility lines, and has.no landscaping or other enhancements. It has been designated in the City's Draft Comprehensive Plan as a bike route. Project Coals The Task Force identified 8 Project Goals, which are included at the end of this section. In terms of bikeways, the Task Force decided that the primary emphasis should be placed on providing good services to Group B, Basic Bicyclists, and Group C, Children Bicyclists, since the 761 Street corridor serves primarily residential neighborhoods and City parks. Corridor Alternatives A total of 11 primary Corridor Concept Alternatives were examined and evalu- ated. They ranged from a Do- Nothing Concept to total reconstruction of the roadway and inclusion of a wide landscaped median with a two -way bike path. The Alternative Evaluation process resulted in the selection of three Concept Alternatives, C3, D1, and E2, for refinement as the Recommended Corridor Concept. Recommended Corridor Concept The Recommended Corridor Concept, which is illustrated in Figures 1, 2, and 3, incorporates the following major features. Utilizes the existing pavement for through traffic lanes and parking bays Provides parking bays on the north side of the roadway for the full length of the corridor 76" Street (East Of 1 -35W) Corridor Study a i a a a i i a s s s s s s i i i I. Executive Summary Requires the removal of the south one - fourth of the roadway and recon- struction of the south curb Maintains a sidewalk on the north side of the roadway Provides an 8 -foot wide, two -way, bituminous bikeway, with one -foot concrete edge bands, along the south side of the roadway Incorporates a landscaped boulevard on the south side and landscaped islands at the corners on the north side of the roadway Provides new ornamental street lights for the full length of the corridor Accommodates the existing utility poles (even though it would be desir- able to remove or relocate them) Requires adjustment of and construction of new storm water catch basins at most intersections The Task Force also investigated overall project costs and looked at Project Staging and Implementation. Since the total project cost is approximately 2,300,000, a staging plan was developed to construct the project in segments starting with the westerly end and proceeding east. The first segment could be built west of Lyndale Avenue as a demonstration project to gain public support to complete the entire project. The Task Force believes that the Recommended Corridor Concept represents the optimum combination of desirable features for the 76`' Street corridor and that it does the best job in terms of meeting the established 76`h Street Project Goals as well as overall City of Richfield goals. 76" Street (East Of 1 -35W) Corridor Study 3 a The streetscape and landscaping improvements for the 76°i Street corridor a should be designed with the intent in mind to improve the safety and security 3 of the corridor users as well as the residents living along the corridor. An 0 1. Executive Summary bicyclists as well as to improve the overall lighting level along the corridor. a 76th STREET (EAST OF 1-35W) CORRIDOR PROJECT GOALS a Following is a list of the 76`' Street Project Goals and a description of each: a 1. Reduced Traffic Lanes Goal #3: A bikeway should be provided for Group B and Goal #1: The traffic lanes on 76' Street should be reduced from four through lanes to two through lanes. Convenient and safe designated paths should be provided along 76`h Street Traffic volumes on 76' Street have been cut in half since through traffic has shifted to the reconstructed 77°i Street. This means that only two through lanes of traffic will be required on 76`' Street to handle the projected traffic volumes. Therefore, the roadway should be reconfigured from four through traffic lanes to two through lanes. 3 2. Enhanced Security and Safety Goal #2: All improvements in the 76' Street corridor should be designed to enhance overall security and safety. 3 The streetscape and landscaping improvements for the 76°i Street corridor should be designed with the intent in mind to improve the safety and security 3 of the corridor users as well as the residents living along the corridor. An 0 example would be the installation of additional lighting for pedestrians and bicyclists as well as to improve the overall lighting level along the corridor. 3. Bicyclist Facilities Goal #3: A bikeway should be provided for Group B and Group C bicyclists along 761 Street. Convenient and safe designated paths should be provided along 76`h Street primarily for Group B, Basic Bicyclists, defined as general adult and teenage 76th Street (saSt of 1-35W) Corridor Study 4 IV I. Executive Summary riders, and Group C, Children Bicyclists. The assumption is made that Group A, Advanced Bicyclists, most likely will utilize the roadway. 4. Minimized Traffic Impacts Goal #4: Traffic impacts should be minimized along 761 Street without impairing its collector street function. Traffic calming methods and techniques should be utilized to reduce vehicu- lar traffic impacts in the 76' Street corridor without impairing the roadway's ability to function as a collector street. Acceptable measures could include a narrower roadway, street trees and other landscaping for a more enclosed appearance, and traffic control signs. Measures which would impair the roadway's ability to serve as a collector street, and therefore would not be acceptable, include roadway diversions and street closures. S. On- Street Parking Wherever Possible Goal #5: On- street parking should be provided along 761 Street, wherever possibly. Excess right -of -way, where not utilized for other uses such as pedestrian walkways, bicyclist trails, or landscaped boulevards or medians, should be used for on- street parking. Extra consideration should be given to under- served areas, such as at Sh Avenue, where there are no on -street guest parking spaces for the adjoining residences. 6. No Overhead Utility Lines i Goal #6: The long -term goal should be to remove all over- head utility lines from the 76' Street corridor, the short -term goal should be to remove them as funding permits. NNW 76" street (East of 1 -35W) Corridor study 5 J l c i 1. Executive Summary Overhead utility lines cross the 76' Street corridor east of the Soo Line railroad tracks and they parallel the corridor west of the Soo Line railroad tracks. Because overhead utility lines impact tree growth and tree canopy development, the long term goal should be to place all overhead utility lines along 76`' Street underground or to relocate them to another suitable ease- ment. 7. Beautified 76' Street Corridor Goal #7: The 761 Street corridor should be beautified with lighting and landscaping to the greatest degree possible. In order to improve the image and appearance of the 76' Street corridor, as well as the City of Richfield, the visual environment of the corridor should be upgraded through the incorporation of the greatest amount of lighting and landscaping improvements feasible, within the limitations of available funding. 8. Maintenance Program Goal #8: The corridor reconstruction plans should incorpo- rate a maintenance program. Along with the 76' Street reconstruction plans, a corridor maintenance program should be developed to make sure that the proposed improvements will be maintained and will not create an undue burden for the community. 76th Street (East of 1 -35W) Corridor study 6 Recommended Concept Alternative Combination of Options C3, D', & E2) Existing Pavement for Centered Roadwayy/Separate New Bikeway on South Side Landscaped Boulevard on South Slde / Parking Bays wtth Landscaped Islands North 76th Street Corridor Study CITY OF RICHFIELD, MINNESOTA 0 5 10 Feet October 23, 1996 11111111111 existing —I tF -- _--------- T- - - - -- — — — - i • --_. Can 7Me ( i. Landscaping I i 1 I x I Edge y ' a fi I all f----------- - - - - -- -----:------------------------------...-..--•-- ••- •--- •----------------- - - - - -- ------•------------ J---------------------- - - - - --- momnownwon40 XM AN leffilm I L-- - - - - -- - -- -- - - -- - ------ - -- - -- _ - — —.1 at I- - - - - -- Existing Plan of Typical Block was w/ta.w. I Proposed Plan of Typical Block Recommended Concept Alternative Combination of Options C3, D', & E2) Existing Pavement for Centered Roadway /Separate New Bikeway on South Side Landscaped Boulevard on South Slde / Perking Bays with Landscaped Islands on North Side October 23, 1996 Mumma 76th Street Corridor Study CITY OF RICHFIELD, MINNESOTA 0 50 FeetrJ«n, R11111111111FM N w C O i i V n O L CL` rn rn N M Z z f+ cn a mLL 0- L 0-