LOCATION CHANGE: RICHFIELD WATER PLANT
ROLL::CALL
Special Planning Commission meeting on April 23, 1996, regular meeting on April 23, 1996, study
session on May 14, 1996 and special meeting on May 20, 1996.
UP:. BLLC HEAR. ING <> <>
ITEM #1 96- ACUP -1 The Academy of Holy Angels, 6600 Nicollet
Avenue - Amend conditional use permit to allow
construction of a seasonal sports dome.
ITEM 96 -RZ -2 City of Richfield, 7700 Lyndale Avenue - Rezone
from.0 -3 to C -2 to construct a fourth municipal
liquor store. .
NEW BUSINESS
OLD BUSINESS ! -
LIAISON REPORTS: ....
School Board
Community Services Advisory Commission
HRA
City Council
Auxiliary aids for individuals with disabilities are available upon request. Requests must be made
at least 96 hours in advance to the Administrative Service's Director at 861- 9702."
PLANNING COMMISSION MINUTF,S
ado
r1TV nr- Meeting
April 23, 1996
MEMBERS PRESENT: Chairperson Daniel Linnihan; Commissioners: Pamela
Dmytrenko, Timothy Erlander, David Gepner, Mitchell Hadley,
Kevin Hansen, Dawn Postudensek, and Kristal Stokes.
MEMBERS ABSENT:
COUNCIL LIAISON:
Paul Wasko
Martin Kirsch, Mayor
STAFF PRESENT: Bruce Palmborg, Community Development Director
Julie Urban, Zoning Administrator
Robert Robson, Planning Staff Assistant
The Planning Commission meeting was called to order by Chairperson Linnihan at 7:45
p.m.
APPROVAL OF MINUTES
Commissioner Hadley asked staff to change the March 26, 1996 minutes to include the
following sentence in paragraph 4 of page 4, "He stated because of the current existence of the
grooming the question was rendered moot."
M/Stokes, S/Hadley to approve the minutes of the regular Planning Commission meeting
of March 26, 1995. as corrected.
WWI
M/Stokes, S/Hadley to approve the minutes of the Study Session of April 9. 1996.
Motion carried: 8 -0
PUBLIC HEARINGS
April 23, 1996
Page 2
plan.
PC Letter #6
Lyndale Avenue Strategic Development Plan - Recommendation
Zoning Administrator Urban reviewed the staff report and recommended approval of the
Chairperson Linnihan opened the floor for discussion to the public.
Jo Romer, 7405 Aldrich, expressed concern that parking problems have not been
corrected in the plan. She requested that the barrier for the project near her property be the same
as the barrier that is planned for the rest of the project. Fred Hoisington, Hoisington Koegler
Group, stated that continuity of the barrier will be incorporated in the final plan.
Larry Wozniczka, 6744 Wentworth, expressed concern that tax increment financing (TIF)
is going to be used for this development. He would like to see the City pursue a development
that can be done independently of TIF.
Steve Lindgren, Chamber of Commerce, said that the report goes too far in saying that
there has been extensive input from business. He stated that a distinction should be made
between concept and plan; north of 76th Street is a concept and south of 76th Street is a plan. He
expressed concern about comments made at the public meetings that businesses could not afford
rents.
M/Erlander, S /Stokes to close the public hearing.
Commissioner Erlander stated that the plan is not written in concrete.
Chairperson Linnihan said that businesses should do their own cost benefit analysis. He
also stated that the distinction between the plan for south of 76th Street and the concept for north
of 76th Street should be made clear in the plan. He recommended passage of the plan with the
changes suggested tonight.
Commissioner Stokes stated that she was not clear on what changes were being
recommended.
Chairperson Linnihan offered 2 stipulations: Plans and illustrations be reissued to
include screening for the 7400 block of Aldrich, and the difference between plan and concept be
made clear in the development plan.
M/Erlander, S /Stokes, to approve the Lyndale Avenue Strategic Development Plan with
the stated stipulations.
April 23, 1996
Page 3
96 -RZ -1, 6228 Penn Avenue
ITEM #2 Lunds, Inc.
Rezoning of property from MR (multiple residence) and
I (industrial) to C -2 (general commercial)
Zoning Administrator Urban reviewed the staff report, stating that a rezoning of the
property would allow the applicant to commercially develop the western portion of the property
in the future and bring the property under one zoning district. She recommended approval of the
rezoning request.
John Pazahanick of Lunds summarized what Lunds has done so far and he emphasized
that Lunds has worked closely with the neighbors throughout the process. He asked for support
for Lunds' plans.
In response to a question from Chairperson Linnihan, Mr. Pazahanick stated that the
expansion will be some type of auxiliary retail which would be compatible with the rest of the
store.
Commissioner Hansen asked about how well the process of working with the neighbors
went. Mr. Pazahanick responded that Lunds' involvement with the residents of the
neighborhood went well. Neighbors were involved in the designing of the berm.
Commissioner Postudensek inquired about what concerns the neighbors had with phase 1
and phase 2 of Lunds' remodeling. Mr. Pazahanick answered that the residents were concerned
with the receiving docks and traffic. Lunds responded by turning the docks away from the
neighborhood and by improving the circulation of trucks. He added that Lunds tried to address
all the neighborhood's concerns.
Commissioner Gepner asked about how future off street parking would be handled. Ms.
Urban responded that the off street parking permit process would be brief because most problems
have already been addressed.
Commissioner Stokes asked if there would be a separate outside entrance to the phase 2
development and Mr. Pazahanick answered that there would be no new entrance to the site.
Chairperson Linnihan opened the floor for discussion to the public.
John Richards, 6229 Russell, supports the rezoning request. He felt that Lunds has lived
up to most of its promises including not reopening the 62nd Street access. He stated that Lunds
has not removed snow as had been promised, and they have also not stuck to the agreed upon 7
A.M. to 10 P.M. delivery schedule.
April 23, 1996
Page 4
Joyce Adamson, 6240 Russell, stated that the landscaping berm has not met expectations
because the berm near Highway 62 is very low and the trees are too small to abate noise. She
said that trucks are arriving early in the morning before 7 A.M., and that if phase two has loading
in back of the building it will add more noise and traffic to the neighborhood. She added that
parking may not be adequate for additional development.
Mr. Pazahanick responded that the store will try harder to meet the delivery schedule
commitment. He said he did not remember the commitment to remove snow from the site but
that the practice of bringing snow from other stores to this site has been stopped, and that the
berm and curb should stop any flooding onto the neighbors properties. He stated that parking for
phase two should be no problem. He also said that the receiving docks for the new space have
not been designed yet, but that the plan is very flexible, and Lunds will try to orient the trucks
away from nearby houses.
Chairperson Linnihan wanted to know if loading could be shared. He stated that the
noise might be blocked by phase two expansion and the Fraser School expansion.
Mr. Pazahanick responded that the berm for reducing noise was designed with the
neighbors' input, and that the berm is well taken care off and includes trees. He said that Lunds
has made a real effort to respond to neighborhood concerns.
Chairperson Linnihan asked if shipping and receiving practices have changed since the
initial expansion. Mr. Pazahanick answered that Lunds has tried to address the traffic problems
but that they still have to improve the delivery schedule.
Chairperson Linnihan stated that the Planning Commission could impose stipulations on
the rezoning but perhaps instead they could ask Lunds for a commitment to work on the delivery
schedule. Mr. Pazahanick said that Lunds will make an effort to enforce the delivery schedule.
Commissioner Stokes inquired about what input the City staff has had in the storm water
runoff issue. Mr. Pazahanick stated that Lunds has went through an extensive process to make
sure that water will be handled properly. Commissioner Stokes then asked if all the snow water
would be contained on Lunds' property and Mr. Pazahanick answered that yes all the water will
be contained on the store's property.
Mr. Richards disagreed with Mr. Pazahanick stating that snow was put on top of the berm
and if there had been a quick melt this year flooding would have occurred.
Ms. Adamson expressed concern that Lunds is being vague about what business will go
into the phase two development. She also stated that the berm does not work and that dock noise
is still present.
Commissioner Stokes wanted to know if the hours of operation are addressed during the
parking permit process. Ms. Urban responded that it depends on the type of use.
M/Postudensek, S /Stokes to close the public hearing.
April 23, 1996
Page 5
Commissioner Erlander offered three stipulations: deliveries must occur between 7 A.M.
and 10 P.M., no snow should be put on top of the berm, and snow dumping from other stores
should not be allowed.
Commissioner Hansen questioned if a delivery schedule stipulation could be put into the
rezoning request.
Commissioner Dmytrenko questioned if the Planning Commission and the City Council
will have some control over how the property is used in the future. She commends Lunds for
working with the neighbors.
M/Erlander, S /Gepner, to approve the rezoning request with the stated stipulations.
a e 6 .! ! • •
Staff agreed to follow up with Lunds regarding the delivery schedule when they amend
their off street parking permit.
M/Erlander, S /Stokes to approve the rezoning request without stipulations.
I UV
96- PUD -2, 1200 East 78th Street
ITEM #3 Northern Hospitality, Inc.
Planned Unit Development and Rezoning to allow
construction of a 59 -unit AmericInn Hotel.
96 -CUP -4 & 96- FDP -3, 1200 East 78th Street
ITEM #4 Northern Hospitality, Inc.
Conditional Use Permit and Final Development Plan to
allow construction of a 59 -unit AmericInn Hotel.
Ms. Urban presented the staff report on items 3 and 4 and recommended approval of the
planned unit development and rezoning request, and the conditional use permit and final
development plan with the stipulations that are detailed in the staff report.
April 23, 1996
Page 6
Commissioner Hansen asked if the access to the hotel from 12th Avenue will be closed in
the future. Ms. Urban responded yes and that AmericInn feels that they will be well enough
established when that happens to survive.
Commissioner Stokes wanted to know if shared parking opportunities had been explored
to help meet demands from the meeting room business. Ms. Urban responded that most of the
meetings will be held during the day when hotel customers are gone and so parking should not be
a problem. She added that land may become available for additional parking when 78th Street is
closed.
Commissioner Postudensek asked if there is a problem with parking in the area. Ms.
Urban said that she was not aware of any parking problems other than with the Ground Round.
Perry Platisha, Northern Hospitality Inc., took the floor and asked for the Planning
Commission's support.
In response to a question from Commissioner Postudensek, Mr. Platisha stated that the
hotel would be fully occupied 2 -3 days a week.
Commissioner Gepner wanted to know if there were any other AmericInns in the area.
John Siber, AmericInn, answered that there were several hotels in Minnesota including one in
Redwing and several in the metro area.
In response to Chairperson Linnihan's question regarding the hotel's style, Mr. Siber
stated that the hotel would be marketed as a "home away from home ".
Chairperson Linnihan opened the floor for discussion to the public.
Jerry Green, Richfield Court Owner Representative, said they were not opposed to the
hotel but expressed concern about the hotel's height, overflow parking, and the buffer zone
between the hotel and the apartment building.
Commissioner Hansen inquired about what is directly adjacent to the backside of the
hotel and how tall Richfield Court is. Mr. Green responded that Richfield Court's garages are
directly behind the hotel site and the apartment building is 2 1/2 stories.
In response to concerns over the hotel's height, Ms. Urban stated that the City does not
want a shorter hotel because that would increase the building's footprint which would reduce
parking and access to the site. She added that shade would prevent landscaping from surviving.
Commissioner Gepner asked if there will be a 20 foot separation between the buildings.
Ms. Urban responded that she was unsure how far the garages are set back from the property line.
Mr. Green expressed desire to have something done with the space between the buildings.
Ms. Urban said that perhaps lighting or plantings could be put in the space between the garages
and the hotel.
April 23, 1996
Page 7
In response to Commissioner Postudensek's question about parking, Mr. Siber responded
that the hotel does not typically have a max out parking load even when the building is 100
percent full. Chairperson Linnihan added that he assumed that Americlnn had addressed the
parking issues because they want to keep their customers satisfied.
Commissioner Dmytrenko asked about the purpose of the meeting rooms and Mr. Siber
answered that the meetings rooms were designed to be used by the hotel's customers.
M/Stokes, S/Erlander to close the public hearing.
M/Stokes, S/Erlander, to jaP rove the, planned unit development and rezoning request
with the stipulation as stated in the staff report.
l a_l • ; 1
M/Stokes, S/Erlander, to approve the conditional use permit and final development plan
with the stipulations as stated in the staff report.
NEW BUSINESS
PC Letter #7
ITEM #5 1998 -2002 Capital Improvement Program (CIP).
Commissioner Stokes stated that the City Council had decided to table the issue of a new
parking lot at Veterans Park.
Chairperson Linnihan said that the joint meeting with Community Services went well and
that he liked the new format.
C UP
M/Postudensek, S/Hadley, to approve the 1998 -2002 Capital Improvement Program
Motion carried: 8 -0
OLD BUSINESS
April 23, 1996
Page 8
Comprehensive Plan
ITEM #6 - Review of public comments
Review of draft plan
Don Brauer discussed the major concerns that citizens have with the comprehensive plan.
He recommended a couple of language changes but felt overall that the plan was well received.
Chairperson Linnihan was concerned that the City effectively convey that Wilson Park
changes will not result in the demolition of any houses. He wants the City to make it clear that
the acre for acre replacement of park land does not have to occur at Wilson Park. He wants to
communicate to Richfield's citizens that historically the City has not condemned property for
park land.
Mr. Brauer stated that the City should emphasize what has been done in the past to
illustrate that houses will not be condemned.
Chairperson Linnihan pointed out that citizens should continue to improve their houses
because if a buyout did happen the improvements would raise the price that they would get for
their property. Letter should be sent to people by Wilson Pond explaining what is happening.
Commissioner Erlander agreed a letter should be sent, but he said that it still would not solve the
problem.
Commissioner Stokes said that the concerns regarding airport issues combined with the
concerns over the comprehensive plan have increased people's anxiety.
Chairperson Linnihan expressed concern that comprehensive plan meetings attracted
mainly people who were age 50 and over, and that younger people in the community are being
left out of the process.
The group then discussed various ways to reach a broader segment of the population.
LIAISON REPORTS
School Board: Commissioner Dmytrenko stated that there is now a meeting room at the
district office of the School Board that is available for the public to use. She also discussed the
results of a survey which shows that Richfield's students are very similar to the rest of the
Nation's students with respect to drug and alcohol use. The survey results pointed out that
efforts have to be made to reinforce positive behaviors among students while discouraging
negative ones.
April 23, 1996
Page 9
Community Services Advisory Commission: Commissioner Stokes stated that
Community Services is going to revisit the Park Plan within the next few months. Community
Services would like to have a copy of the Lyndale Avenue Strategic Development Plan because
they have some concerns regarding the street lights. Community Services is also likely to re-
investigate the balance of attention that is paid to neighborhood parks versus Veterans Park.
HRA: Ms. Urban stated that the Cloverleaf site had been sold to TOLD. She also said
that an elderly housing study has been proposed.
City Council: The Holy Angels mediation regarding the dome was not successful. The
TOLD proposal passed.
ADJOURNMENT
The meeting was adjourned by unanimous consent at 10:10 p.m.
Timothy Erlander
Planning Commission Secretary
PLANNING COMMISSION MINUTES
Special Meeting
April 23, 1996
MEMBERS PRESENT: Chairperson Daniel Linnihan; Commissioners: Pamela
Dmytrenko, Timothy Erlander, David Gepner, Mitchell Hadley,
Kevin Hansen, Dawn Postudensek, and Kristal Stokes
MEMBERS ABSENT:
COUNCIL LIAISON:
Paul Wasko
Martin Kirsch, Mayor
STAFF PRESENT: Bruce Palmborg, Community Development Director
Julie Urban, Zoning Administrator
Robert Robson, Planning Staff Assistant
The Planning Commission meeting was called to order by Chairperson Linnihan at 6:30
p.m.
NEW BUSINESS
ITEM #1 PRESENTATION OF LYNDALE AVENUE STRATEGIC
DEVELOPMENT PLAN BY FRED HOISINGTON OF
HOISINGTON KOEGLER GROUP
Fred Hoisington presented the Lyndale Avenue Strategic Development Plan.
In response to a resident's question regarding stop lights, Mr. Hoisington stated that the
plan did not address the issue of stop light changes.
In response to a resident's question regarding the 3 to 5 year time line for the 7600 block
of Lyndale, Mr. Hoisington stated that, if financing and a developer can be found, the 7600 block
could be done in 3 to 5 years.
April 23, 1996
Page 2
A resident expressed concern regarding what would happen to people who do not want to
sell. Mr. Hoisington responded that hopefully the City and the developer would negotiate for the
purchase of all the properties and that condemnation would only be used as a last step.
Fred Ryan, property owner, asked about the additional road taking that is proposed for the
east side of the 7600 block of Lyndale.
Mr. Hoisington stated that a second left turn lane would have to be added south of 77th
Street on north bound Lyndale due to the increased traffic demands that are forecast because of
the developments to the south of 77th Street.
Steve Lindgren of the Chamber of Commerce asked about the definition of the term
blight as it is used in the plan.
Mr. Hoisington stated that the definition of blight comes from the Tax Increment
Financing law.
Bruce Palmborg said that blight is defined in state statutes as involving the physical
deterioration of buildings or the economic obsolescence of buildings
Mr. Lindgren also wanted to know how big the expanded Tax Increment Financing (TIF)
district might be.
Mr. Hoisington responded that no boundary has been set.
Bob Lurtsema, property owner, wanted to know if the City had a particular developer in
mind and Mr. Hoisington said no.
Clarence Sutton, 7622 Lyndale, inquired about when the work might begin once the
money is found for the development.
Mr. Hoisington said that the time table is not known for sure and that work might not
begin within the next three years.
Mr. Palmborg added that the City will keep people informed and that there will be no
suprises. If someone hears a rumor they should call him at 861 -9760.
In response to a question about how a property owner located just outside the initial
redevelopment will be affected Mr. Hoisington said that the 7400 and 7500 blocks are a concept
and not a set plan. Cooperation between the City and property owner should be encouraged to
insure that any remodeling or redevelopment plans fit the concept.
Larry Wozniczka, 6744 Wentworth Avenue, inquired about whether or not the needed
redevelopment could be accomplished without using TIF.
April 23, 1996
Page 3
Mr. Hoisington responded that it would likely not be feasible to accomplish the kind of
redevelopment that is needed without using TIF.
Planning Commission Chairperson Linnihan added that the financing issue will largely
be dealt with by the Housing & Redevelopment Authority (HRA). Creative financing will be
needed to see the project to completion.
In response to questions about parking, Mr. Hoisington stated that no zoning ordinance
would be effective in correcting the Metro Dental Clinic's parking problems. The dental clinic
parking problem will not go away because the business is so successful. But the City should
monitor the situation and better enforce snow emergency routes. .
Mr. Hoisington responded to concerns about how the property values of homes in the
area will be affected by stating that no serious impacts are anticipated. Improvements to the area
may even increase property values.
Chairperson Linnihan added that this is a concept and value questions could be better
answered after a developer is chosen.
Mr. Lindgren asked about what action the Planning Commission was going to take
tonight.
Chairperson Linnihan responded that the Planning Commission would vote on
forwarding the plan to the HRA.
ADJOURNMENT
The meeting was adjourned by unanimous consent at 7:40 p.m.
Timothy Erlander
Planning Commission Secretary
PLANNING COMMISSION MINUTES
Study Sessiol
May 14, 1996
MEMBERS PRESENT: Chairperson Daniel Linnihan; Commissioners: Pamela
Dmytrenko, Timothy Erlander, David Gepner, Mitchell Hadley,
Dawn Postudensek, Kristal Stokes, and Paul Wasko
MEMBERS ABSENT: Kevin Hansen
STAFF PRESENT: Bruce Palmborg, Community Development Director
Bruce Nordquist, Housing Supervisor
Julie Urban, Zoning Administrator
Robert Robson, Planning Staff Assistant
p.m.
The Planning Commission meeting was called to order by Chairperson Linnihan at 7:05
OLD BUSINESS
ITEM #1 TOWNHOME /CLUSTER HOME DEVELOPMENT DISCUSSION
The meeting began with introductions and Linda Donaldson of Brighton Development
Company, Paul Madson of Paul Madson Associates, Michael Lander, and John Oksness
provided brief backgrounds on their experiences with developing townhomes and cluster homes.
Ms. Donaldson discussed the issue of how land values will make it difficult to use only
Tax Increment Financing (TIF) for these types of projects. She stated that TIF will not work
because the tax revenues from housing will not be as high those collected from commercial
projects. She said that TIF will have to be combined with some other form of financing to make
projects work. She discussed the site at 71st Street and Chicago Avenue and how land prices
were too high to make a townhome project viable for that location. She stated that townhome
developments might need more of a land subsidy than do single family housing projects.
Michael Lander stated that non - single family housing is the next big market because the
baby boom empty nester segment of the population is growing. He said that townhomes are the
May 14, 1996
Page 2
preferred choice in this market. He also added that this development might be an advantage for
inner ring suburbs like Richfield.
Mr. Lander also commented that there is limited land available for infill townhomes. He
said that what is needed is a vehicle for acquiring sites, paring them, rezoning them, and making
them available to developers to allow for a profit. He added that the City needs to make land
available at 8 to 10 percent of value. He said that he is currently selling his townhomes in the
Lakes Area of Minneapolis at 125 percent of the market. In response, Housing Supervisor Bruce
Nordquist stated that the City of Richfield could do subsidies to provide raw land but would not
subsidize the actual townhome developments.
Chairperson Linnihan discussed how the Comprehensive Plan uses townhome and cluster
home developments as buffer zones between residential and commercial areas. Mr. Lander
responded that the trend in planning is to go back to the traditional style of community with
integrated neighborhoods. He said that inner ring suburbs will benefit from this if they make
sure to integrate the townhomes into the rest of the community. He stated that it might not work
to use these developments as buffer zones between commercial and residential areas. He re-
emphasized the need to integrate these developments into the neighborhoods and added that the
ideal size would be from 4 to 20 units. Ms. Donaldson added that you do not want to put
housing where no one wants to live but that different people might want different things.
John Oksness stated that these developments need to come in a mix of sizes. He said that
what style they are, single level versus multiple level, depends on who you want to market them
to. He added that the senior demand is tremendous and single level townhomes is the preferred
style for the senior market.
Chairperson Linnihan made the observation that properties on arterial streets do not seem
to be as well taken care of as properties on non - arterial streets. He wanted to know if they could
be purchased for less than other houses. Mr. Nordquist answered that there seems to be little
difference between houses on arterial streets versus those on non - arterial streets. He added that
traditionally houses on arterial streets have been discounted 5 to 10 percent which makes them
more attractive for rental housing.
Mr. Madson said that there is less political resistance to townhome and cluster home
developments in Minneapolis than there is in Richfield. He added that 14 1/2 units per acre is as
dense as you will want to get in these developments in Richfield. He stated that he would like to
see zoning questions handled on a case by case basis. He also said that full block developments
would need reduced setbacks but that infill projects should have the same setbacks as the
surrounding buildings in order to give them a neighborhood feel. Mr. Lander and Mr. Oksness
both added that setback requirements need to be flexible and that the projects should match the
neighboring setbacks so that they fit in.
A discussion then took place regarding garage and parking requirements. Mr. Madson
stated that covered parking spots are needed, not parking lots, and that alleys need to be
developed to encourage the placement of garages in the rear of properties. Ms. Donaldson added
May 14, 1996
Page 3
that the market perceives a need for two car garages. She also said that the street parking for
people who come and go needs to be encouraged.
Mr. Madson stated that there should be some sort of landscaping requirements but that
using the value of development can create obstacles. Mr. Oksness added that because developers
want to sell their projects they are already motivated to make them attractive, so any
requirements should give developers some flexibility. Ms. Donaldson emphasized that the first
multi -unit development that is built should be top of the line so that people get a good first
impression of such developments.
The market for townhome developments was also discussed. Ms. Donaldson said that the
townhome market for infill projects does not have enough of a track record to indicate how
interest rates will affect sales. She added that people still view single family homes as a better
deal. Mr. Oksness added that he would not be able to sell townhomes at $150,000. Mr.
Nordquist stated that the best approach would be to move cautiously at first and let the market
decide what value of townhomes should be built.
Mr. Lander discussed design requirements and the fact that there are not many designs
that will fit into Richfield. He suggested that Richfield could have a consultant create a few
basic townhome designs which small contractors could buy and use to build townhomes in
Richfield. The designs would be pre- approved by the City but the developers could still
customize them if they wanted to.
Ms. Donaldson stated that there are too many documents involved with home owner
associations and that too much money is spent on legal fees. She also said that small condo
associations do not work well and that bigger associations can be created by joining several
developments together. Mr. Lander disagreed and stated that small associations can work.
Mr. Lander concluded the discussion by stating that the RFP process is not the best way
to go. He said that the City should select certain builders to work with instead.
The Planning Commission concluded the meeting by discussing the upcoming HRA/City
Council meeting regarding Lyndale Avenue. It was agreed that as many of the Planning
Commissioners as possible should be present to recommend the report.
ADJOURNMENT
The meeting was adjourned by unanimous consent at 9:15 p.m.
Timothy Erlander
Planning Commission Secretary
PLANNING COMMISSION MINUTES
MEMBERS PRESENT: Chairperson Daniel Linnihan; Commissioners: Pamela Dmytrenko,
Timothy Erlander, David Gepner, Mitchell Hadley, Kristal Stokes,
and Paul Wasko
MEMBERS ABSENT
STAFF PRESENT
NEW BUSINESS
Kevin Hansen and Dawn Postudensek
Julie Urban, Zoning Administrator
Mayor Kirsch called the special meeting of the HRA and City Council, with the Planning
Commission, to order at 6:35 p.m. City Manager Prosser introduced Planning Commission Chair,
Dan Linnihan. Chairperson Linnihan gave some background on the Lyndale Avenue study and
introduced the consultant, Fred Hoisington.
Mr. Hoisington presented the report, "The Lyndale Gateway ", that reflects the results of
the study. Mr. Hoisington reviewed the problems, the process that was taken and the concept
plan that was developed. He explained the guiding principles that were used and reviewed the
economic feasibility portion of the report. Mr. Hoisington reviewed the strategies the report
recommends for the area.
Fred Ryan and Russ Walzer, property owners in the area, stated that they felt the Planning
Commission listened to them but didn't hear their comments. They stated that they feel there are
no problems in the area. They presented a letter signed by 27 of the businesses and owners in the
area that expressed their desire to leave things as they are.
HRA Chairperson Harms asked how long they had owned property in the area and
questioned whether they could claim that there aren't any problems. Mr. Walzer responded that
he did see some parking problems on the west side. He added that the threat of redevelopment
has prevented them from doing anything to the properties. Chairperson Harms stated that this is
the first time the City has looked seriously at this specific area so the ILN redevelopment
shouldn't have been a disincentive.
Councilmember Susag stated that he would be interested in hearing what the owners
would be willing to do regarding appearance as well as parking. Fred Ryan stated that the
May 20, 1996
Page 2
parking issue has been resolved with the parking lot on the old Total Petroleum site.
Councilmember Susag stated that parking on the west side hasn't been solved.
Jan Berge, 7345 Aldrich, expressed safety concerns regarding the potential closing of 75th
Street. She stated concern that the Metro Dental parking issue isn't going to be resolved. She
expressed her willingness to host a neighborhood meeting. She stated that she's concerned about
selling her home with the impending redevelopment. She received information from the State that
said she would have to disclose the information about the redevelopment to a potential buyer.
She stated that she didn't feel that people were listened to.
Mayor Kirsch questioned why Mrs. Berge and others would not want to live near an area
that would be fixed up and pointed to other areas in the City where redevelopment had a positive
impact on property values. Mrs. Berge stated that she's not convinced it will have a positive
impact.
City Manager Prosser explained that the City was looking at various traffic calming
methods city -wide and that staff will experiment with the methods first. He added that traffic
calming wouldn't solve all problems.
Chairperson Harms suggested that staff and the City Attorney could look into providing
some form of prepared disclosure statement that would provide accurate information that
residents could use.
Steve Lindgren, Chamber of Commerce, presented a written statement from the Chamber
of Commerce. The Chamber expressed its appreciation to the Planning Commission. He stated
that the Chamber Board will act on a position statement on the 22nd and that the position will be
based on the decision of the businesses in the study area. He stated that the plan is not acceptable
to the Chamber and that it is not what the businesses envision for the area. Mr. Lindgren added
that the idea of using money from the LHN TIF district should be presented to the community
first. He stated that the Chamber was willing to participate in future meetings.
Commissioner Luettinger stated that the HRA would be interested in hearing what the
Chamber would like to see happen.
Larry Wozniczka, 6744 Wentworth, emphasized that the businesses are against the plan.
He questioned the property valuations in the report on pages 6 and 22 -23 and why the numbers
were different. He stated that the decline in value is probably because some buildings were
eliminated. He challenged the Council to set a forum for this discussion that isn't funneled
through the Planning Commission.
Chairperson Harms stated that the Planning Commission had a difficult task. He stated
that their role was to start the dialogue, look at the area and get people excited. He added that
the plan isn't etched in stone.
Gertrude Ulrich, 7601 Aldrich, stated that she's in support of the plan even though it will
take her home. She urged the Council not to spend money on a paint up /fix up alternative but to
May 20, 1996
Page 3
do it right. She encouraged everyone to walk down the alley and see what needs to be done. She
stated that she recognized the need for improvements 30 years ago. She added that parking is a
problem and so is traffic, although 77th Street has improved the traffic situation. She pointed out
that people on the east side of Aldrich are getting older and that now is the time to do something
before new people move in who are unaware of the problems.
Councilmember Susag complemented the Planning Commission. He stated that they can't
cover everything in one hour. He suggested that the issue of the LHN money needs to be
explored further, possibly by a task force.
M/Harms to accept the package submitted to the HRA.
Commissioner Sandahl pointed out that this doesn't mean everything in the document will
happen but that it's a recognition of the work that's been done.
S/Luettinger.
Motion carried: 5 -0.
M/Sandahl (for the City Council) to accept the report.
S /Susag; Rosenberg.
Councilmember Priebe clarified that he was willing to accept the report but not the
moving of tax dollars from the LHN district. Mayor Kirsch pointed out that it's just one of many
options. HRA Chairperson Harms stated that these materials will be used to do further study and
that nothing should be ruled in or out at this point. The HRA will come up with a problem and
plan for what is feasible and what the community as a whole wants to do. The Planning
Commission's work is a starting point for the process.
Motion carried: 5 -0.
ADJOURNMENT
The meeting was adjourned by unanimous consent at 7:50 p.m.
7 -
r
Timot ander
Planning Commission Secretary
Item: #1 Agenda Section: Public Hearing
Case: #96- ACUP -1 Date: May 28, 1996
GENERAL INFORMATION
Petitioner: Academy of the Holy Angels
Location: 6600 Nicollet Avenue South
Type of Request: Amended conditional use permit to allow construction of a seasonal sports
facility and field.
Zoning: R (single family residential)
Land Use: Quasi- public
Comp. Plan: Institutional
References: (see attached Citations section for excerpts)
ZoninjzCode: Section 521.07, subd. 9; Section 521.11, subd. 2 and 5
ACTION
Proposed Change: Approval of the amended conditional use permit would allow the applicant
to construct a seasonal sports facility and field.
Staff
Recommendation: Approve the amended conditional use permit request with stipulations.
HISTORY
Public Notice: Notice of the Planning Commission's consideration and public hearing was
mailed to all property owners within 350 feet of the subject property.
Public Hearing: The Planning Commission will conduct a public hearing on May 28, 1996.
Hearing Examiner: The Hearing Examiner will decide for or against a variance by May 24,
1996.
City Council: Planning Commission action would set a City Council public hearing date
of June 10, 1996.
ANALYSIS
Background: On March 23, 1996 the Planning Commission conducted a public hearing on the
request by the Academy of Holy Angels for an amended conditional use permit.
In response to neighborhood concerns, the Commission recommended that Holy
Angels and the neighbors try mediation to work through some of the issues.
Southwest Suburban Mediation Center was contacted to conduct mediation. Two
sessions were held in which the neighbors raised several issues. Some responses
were given regarding the issues but they remained unresolved. The Mediation
Center, a professional mediation service, was hired to continue mediation. The
second mediation was also unsuccessful.
Proposal: The applicant is requesting an amended conditional use permit to allow the
construction of a seasonal sports dome and a surrounding security fence. The turf
would be covered by an air supported structure to allow sporting activities during
the winter season. The existing grass athletic field would be converted to
artificial turf. Bleachers and lighting would be installed to allow evening use of
the field during the summer and fall.
The structure would have a height of 65 feet at the center. A 10 foot high fence
would surround the structure to prevent unauthorized access. A concessions
building would be constructed to the east of the field.
Issues: LOCATION: Holy Angels reviewed four alternative locations for the dome.
The original plan located the dome over the existing practice field which is set
back 39 feet from the west property line (119 feet from the residential property
lines).
One alternative Holy Angels reviewed would sink the dome into the ground.
Soil conditions allow for a depth of 10 feet. Holy Angels believes that the benefit
of 10 feet does not outweigh the high cost.
A second alternative would locate the dome along 66th Street. The negatives to
this alternative include proximity to a busy street, increased noise in the
neighborhood from the speaker system, drainage, and accessibility.
A third alternative would place the dome diagonally across the property. The
disadvantages include increased distance from the residences at the north end of
Pleasant Avenue only and the downward slope of the northern portion of the
property. .
Holy Angels is requesting approval of a fourth alternative location that moves
the dome to the east. In this alternative location, the dome would be set back 114
feet from the west property line. An additional 80 feet of railroad and street
right -of -way would separate the dome from the residential property lines on.
Pleasant Avenue (a total distance of 194 feet). The disadvantages include the
removal of 37 mature oak trees and relocation of part of the parking lot.
SIZE AND APPEARANCE: The structure is 215 feet wide and 374 feet long.
The size allows for two half size soccer fields to be configured within the dome as
well as regulation size soccer and football fields. The height of 65 feet is directly
related to the size and length. The dome is made of teflon-coated plastic with an
interior insulating layer.
The dome is a temporary structure and can only be inflated for a maximum of 180
days, according to building and fire code regulations. Existing trees on the site
will help screen the structure and will be supplemented with evergreen trees on
top of a berm along the west property line. Some existing trees will be removed
with the construction. The building is a temporary structure, so the site will
remain in its existing condition for the balance of the year. A perspective is
included in the attached site plans which shows the view of the dome from the
west side of Pleasant Avenue.
TRAFFIC AND PARK NG: Holy Angels has 105 parking spaces on their
property. In addition, Holy Angels has an agreement with the adjacent St.
Peter's school and church to use their parking lot (375 parking stalls) for a total
of 480 spaces. The agreement provides for shared parking except during Mass
times which are Saturdays at 5 p.m. and Sunday mornings before noon. The
school is not likely to have major events during these times. There is some
parking spillover onto Wentworth Avenue during the school day from students
who drive on an occasional basis. In general, adequate parking is available for
normal school activities.
The proposed bleachers provide seating for 1,000 people. The dome itself has an
occupancy load of 300 people. The City's Transportation Engineer estimates a
demand for 300 parking stalls for the occasional event, like a football game (4 to
5 per year) or graduation (1 per year), that will generate a large number of
people. Based on this estimate, the 480 stalls should provide ample parking for
special events. It should be noted that the City typically doesn't require
businesses, organizations or residents to provide parking for occasional
occurrences.
There is above average traffic on 68th Street (between 1,065 to 1,397 average
daily trips from Nicollet to Lyndale) because the City's grid system enables
residents to use 68th Street to avoid 66th Street. There will likely be a 5 to 10
percent increase in daily traffic on 68th Street (140 to 107 cars) when there are
major school events. The increase may be noticeable for a short period of time
before and after the event. (See Attachment A)
The alternative location requires that part of the existing parking lot be moved.
The City generally requires that all new, non - residential parking lots be installed
with full perimeter curb and gutter. Holy Angels feels that this requirement
makes the cost of the alternative location prohibitive.
SECURITY FENCE: The 10 foot high security fence is required to protect the
structure from potential damage that could.occur with unauthorized access. The
visual impact of the fence will be reduced in the alternative location.
LANDSCAPING: Thirty -seven trees will be removed at the alternative location.
Seventeen, fourteen -foot evergreens will be planted along the western property
line on top of a berm to help screen the structure. The height of the berm has not
been determined; the berm will be made of the dirt that is removed to construct
the field and dome.
The trees to be removed are primarily ash and elm trees. Holy Angels plans to
continue replacing the lost trees with additional trees over time.
LIGHTING: The lighting for the uncovered field will be designed to minimize
the brightness perceived from the adjacent neighborhood. Glare shields and
louvers can be used to mitigate the impact. Security lighting will be located
around the perimeter of the dome to provide further protection against
unauthorized access. (See Attachment B)
NOISE: Dr. David Braslau conducted a noise assessment of the proposed facility
based on its original location. The additional 70 feet does not alter Dr. Braslau's
conclusions.
Dr. Braslau determined that the blowers used to inflate the dome will emit an
estimated noise level of 65 decibels at 3 feet. By the time the sound reached the
residential neighborhood, it would be reduced to a level of 40 decibels. At forty
decibels, the sound would be less than the median noise level of the existing
background noise (50 decibels during the week day; an estimated 42 decibels
during the evening). A low hum may be distinguishable at times when the
background noise is well below the median level. The noise level generated by
the heater would be 75 decibels. The equipment can be shielded to reduce the
sound to a similar level. Some "cycling" or variation can occur with the seasons.
Dr. Braslau-raised a concern with the drum -like sound created by soccer balls
hitting the walls of the structure. He recommends that a net be installed for
kicking practice so balls are not directed at the dome itself.
The greatest amount of noise will be generated by the speakers that will be used
during outdoor athletic events. Again, these speakers can also be shielded to
minimize the noise impact. Because speech is different from background noise, it
may still be intelligible even with shielding. The speakers can be designed to
minimize this effect as well. (See Attachment Q
DRAINAGE: Water drains through the turf to a one foot layer of sand
underneath. Beneath the sand is a drainage system that takes the water out to the
ground. The water eventually drains to 66th Street and can be handled by the
existing storm water system. The Engineering Division has approved the long
term drainage plan for the site. (See Attachment D)
USE OF THE FACILITY: The facility would be used for physical education
classes, practice for a variety of sports, and as a playing field primarily for soccer
and football. Holy Angels anticipates other school - related activities may also
take place in the facility. Holy Angels will also selectively rent the facility to
Richfield community sports leagues and other activities. The facility is expected
to be open during the hours the school is normally operated, from 6 a.m. to 12
p.m.
Holy Angels plans to establish an advisory board made up of community members
to encourage regular communication and receive input about the operation of the
facility.
COMPARABLE FACILITIES: There are several other domes located
throughout the Twin Cities area. The Nicollet Tennis Center at 40th Street and
Nicollet Avenue is located in a park and is adjacent to a residential area. The
Tennis Center has two domes, each of which is slightly smaller than the proposed
Holy Angels structure. Augsburg College has a dome that is approximately the
same size as the proposed structure. That dome is located at the edge of the
college campus. (See Attachment E)
VARIANCE: The zoning ordinance does not anticipate this type of structure.
Because the structure could be up for a maximum of 180 days and will be re-
inflated every year, the zoning ordinance is being applied as if the structure were
permanent.
Because it is also an athletic field, rules regarding fields also apply. The
alternative requires moving the field, so current standards regarding fields have to
be applied (40 foot setback). The original location utilized an existing, legally
nonconforming field so current set backs weren't applied. The new field will be
28 feet from the south property line.
The maximum allowable height of an accessory building in an R district is 15 feet
and the maximum allowable height of a fence is 6 feet. It could be argued that
the dome is a principal building, the maximum height of which is 42 feet. That
height can be increased to a maximum of 75 feet if the setbacks are increased by
one foot for each foot of building height over 42 feet. The 64 foot high dome
would have to be set back 52 feet from the side as well as the rear property line to
meet this requirement.
The Hearing Examiner kept the record open on the variance and accepted
additional written testimony from all interested parties until May 21st. The
Hearing Examiner will make a decision on the variance by May 24, 1996.
RECOMMENDATIONS
Recommended
Action:
Preferred: Recommend that the City Council approve the request with the following
stipulations:
1. That the structure meet the Uniform Building and Fire Codes and be
inflated no more than 180 days in a given' year.
2. That a lighting plan be submitted to and approved by the Community
Development Director based on a review of the specifications by an
electrical engineer that indicates minimal intrusion on adjacent
properties.
3. That a plan for the speaker system be submitted to and approved by the
Community Development Director based on a review of the
specifications by Dr. David Braslau at a recommended level of 40
decibels or less to minimize the impact on the adjacent neighborhood.
4. That netting be erected inside the dome for practice purposes to prevent
the impact of balls on the walls of structure.
5. That Holy Angels establish an advisory committee or some other forum
for communication so residents and other community organizations
have a means of communicating their concerns regarding the facility
with the school.
6. That a plan for protecting the remaining trees during construction be
submitted to and approved by the Community Development Director in
consultation with the City Forester.
7. That a landscape escrow be submitted for the cost of the landscaping.
8. That the agreement with St. Peter's for the utilization of the St. Peter's
parking lot remain in effect.
9. That the Hearing Examiner grant variances for the field, structure and
security fence.
Basis: 1. An athletic field is a necessary component of an educational institution.
The proposed sports facility enables the applicant to use the athletic
field throughout the year and meet the needs of its students.
2. The distance from neighboring properties, the existing and added
landscaping, and the temporary nature of the structure reduces its
impact on the neighborhood.
3. The design of the lighting and speaker systems will be such to minimize
the impact on the adjacent neighborhoods.
4. Adequate parking is provided between Holy Angels and St. Peter's.
Alternative: Recommend that the City Council deny the request with a fording of fact
that the proposed use would have an adverse impact on surrounding
properties or the City as a whole.
ZONING CODE:
CITATIONS
SECTION 521 - ZONING: RESIDENTIAL DISTRICTS
521.07. Conditional uses. Subdivision 1. The uses listed in this subsection are conditional uses in
the R District, and are subject to the conditional use permit provisions outlined in Section 546.05 of
this code.
Subd. 9. Public or private elementary and high schools, and other similar learning
institutions, provided the following conditions are met:
a) pick -up and drop -off areas shall be designed to enhance vehicular and pedestrian
safety;
b) outdoor recreational facilities designed for group activities shall be set back at least
40 feet from any lot line;
c) buffering shall be provided to mitigate noise and adverse visual impacts on adjacent
properties; and
d) lighted playing fields shall be permitted only upon demonstration that off -site
impacts can be substantially mitigated.
521.11. Required building setback and maximum height. Subdivision 1. Standards. The
standards set out in this subsection apply in the R District.
Subd. 2. Required setback and maximum height:
Subd. 5. Additional height for non - residential buildings. The following height exceptions
apply to non - residential buildings in the R District:
a) the maximum building height may be increased to no more than 75 feet, provided
that the required setbacks shall be increased by one foot for each foot of building
height in excess of 42 feet; and
b) notwithstanding paragraph a) above, the maximum height for towers, spires, or
water tanks may be increased to no more than 150 feet provided that such structure
does not exceed 15 percent lot coverage or 1,600 square feet in gross floor area at
the base, whichever is less.
iIAXIMilkt:
MW 9 T
SI1`tRi 30 Ft. 25 Ft. 5 Ft. 12 Ft. 25 Ft.
30 Ft. 25 Ft. 10 Ft. 12 Ft. 25 Ft.
S$O)El 30 Ft. 3 Ft. 5 Ft. 12 Ft. 14 Ft.
7hi «SII)E}`IAL 40 Ft. 30 Ft. 30 Ft. 30 Ft. 42 Ft.
AGLS80R'<<'<«< -> 40 Ft. 10 Ft. 10 Ft. 30 Ft. 15 Ft.
Subd. 5. Additional height for non - residential buildings. The following height exceptions
apply to non - residential buildings in the R District:
a) the maximum building height may be increased to no more than 75 feet, provided
that the required setbacks shall be increased by one foot for each foot of building
height in excess of 42 feet; and
b) notwithstanding paragraph a) above, the maximum height for towers, spires, or
water tanks may be increased to no more than 150 feet provided that such structure
does not exceed 15 percent lot coverage or 1,600 square feet in gross floor area at
the base, whichever is less.
e klpl, millirr..'1+6.r
v/
0
z
033 a
7c 0
M LL
3" SN3A31S
111111111
221MIllsJ
0 iP:B
i
LLJ
U
0
Z
f-,\) 1:1
ca''
I 111JI'M
r
O-j
ca Liar
z
7 c
r
lima w =I
IIMMOR11111M
M
0
0
r4
i
w
3AV HIUOMIN3M
0 IC:11
T
3AV AuneSlIld
I
7rM-7,1
rAM
13,014.
3 1 Ica Is M .2
FIV.At
IIM
Di C
3"131HU11H
3AV Glaukiwo
Mill
gloom
0L)
1 UNION
1111111101.
dl 1
MM
Di C
3"131HU11H
3AV Glaukiwo
Mill
gloom
0L)
1 UNION
1111111101.
dl 1
MM
a
I
LIW
ilia
E
I
C
S)
I
I
at
I /
d
I 8
i
J
8
I
Site Plan
snomwnlis
n
Z
Q
J
Q
rah
1-
X t
r
r6 '
n
ni 3Nn oos
e
fa.yrM .r arva
11
J
7J
1
I
t
h
MN
h
N
pI
0
1 i
Original Proposal
1
1
t
N I
1
1
I
1
1
1
I
t
1
t
8 I
t
I
F 1
Jt
snoNiwnlie
Vr7 1
z
1
1
I
1
i
la
1
1
t
t
t
40- <
A"400".1. .urvJi
c"
M7
I I
Diagonal Alternative
MKIM
i
i_
4M/JJMW
V
1
J
8
1
oil
3Nn OQS
A11riMW M
Id
1
Ci
In I
i
I I
i
3
I3
i
i_
4M/JJMW
V
1
J
8
1
oil
3Nn OQS
A11riMW M
Id
1
SPORTS FACILITY
0 o... —
r. ox ---
Attachment A
Memorandum
DATE: May 16, 1996
TO: Julie Urban, Zoning Administrator
FROM: Thomas Foley, Transportation Engine
SUBJECT: Traffic and Parking at Academy of the Holy Angels
I am responding to your memo of May 10, 1996.
According to AHA, there are 105 parking stalls on their property. Also, there are 375
parking stalls on St. Peter's adjacent and available for evening and weekend activities.
The Academy of the Holy Angels is proposing to build bleachers with a capacity for
1,000 people. Its current enrollment is about 625 students. Projected enrollment is 690
for next year.
School event parking is an occasional occurrence and parking lots are not generally
designed with them in mind. BRW, Inc. has surveyed event parking, although not at the
high school level. They estimate three people per car for event parking. Also, ten
percent of the people at a high school event may be dropped off by parents or
transported by bus. At this rate there is a need for 300 parking stalls.
Given the 480 parking stalls between AHA and St. Peter's, there is ample parking for
athletic events. However, there is no guarantee that cars will not be parked on
residential streets. As people become familiar with the new facility, it is likely that they
will learn that off - street parking is adequate, thus reducing the demand for on- street
parking.
There may be only five or six times when the facility is at or over capacity. That is for
football games and graduation. Other events should not draw large crowds.
For traffic dispersion after an event, there are four exits from St. Peter's and one from
AHA. The AHA site must exit onto Nicollet Avenue for people traveling north and south.
The exit must empty cars parked in all 105 parking stalls. St. Peter's has four exits, two
on Nicollet Avenue and two on 68th Street.
5/16/96
Page 2
I am assuming most traffic will want to exit onto Nicollet Avenue to travel north and
south. Some traffic desiring to exit onto 68th Street will do so to travel west on 66th
Street or to travel south on Lyndale Avenue.
Traffic counts on 68th Street show traffic volumes of 1,397 average daily traffic just east
of Lyndale Avenue and 1,065 average daily traffic just west of Nicollet Avenue. These
figures are higher than on most residential streets because 68th Street is used by
Richfield residents as a short cut to avoid 66th Street.
On the days of major school events, additional traffic will use 68th Street to get to and
from the event. I am assuming 60% of the vehicles parked in the St. Peter's lot will exit
onto Nicollet Avenue. None of the traffic exiting from the Academy of Holy Angels lot
will exit onto 68th Street, although a few of them may turn onto 68th Street. I also am
assuming 40% of a possible 240 cars parked in St. Peter's lot will exit onto 68th Street
and 75% of these cars will head west on 68th Street and 25% will turn east. Therefore,
68th Street on days of major school events will experience an increase of 144 vehicle
trips to the west and 48 trips to the east from the St. Peter's parking lot. These volumes
represent a temporary five to ten percent increase in daily traffic on 68th Street on days
of major school events. Residents may notice an' increase in traffic for thirty minutes
before and twenty minutes after each event.
Most major events will occur in the evening or weekends during off -peak traffic periods
on Nicollet Avenue and 68th Street. Therefore, traffic will be able to disperse in less
than twenty minutes. I do not foresee traffic to and from an event as a major traffic
problem!
Attachment B
Creative Solutions for Land Planning and Design
Hoisington Koegler Group Inc. 1013
IBM
MEMORANDUM
May 16, 1996
To: Julie Urban
From: Paul Paige, RLA/110
Re: Lighting Issues at Holy Angels School in Richfield
In my review of the lighting proposed at the Holy Angels School, I have determined a few issues
that need to be addressed:
1.) With regards to light trespass, the lumens will need to be provided at the property line to
determine appropriateness /code compliance.
2.) Pole height limitations may need to be verified considering the project's proximity to the
airport.
3.) Fixture luminance (brightness) as perceived from the adjacent neighborhood needs to be
addressed. Glare shields and louvers are recommended if they are not already being specified. If
the photometrics were calculated without the shields, I would recommend recalculating with
them as they will impact the light pattern on the field.
4.) Regarding the actual lighting performance, I have not made any recommendations. The
performance is relative to the level of play anticipated for the field, and other criteria to be
determined by the school. The lighting representative they are working with is probably
referencing.the IES (Illuminance Engineering Standards) to determine appropriate light levels for
this field and sport.
cc: Fred Hoisington
7300 Metro Boulevard, Suite 525, Minneapolis, Minnesota 55439
612) 835 -9960 Fax (612) 835 -3160
Attachment C
ACADEMY OF THE HOLY ANGELS
Richfield, Minnesota
NOISE ASSESSMENT
of the
Proposed Athletic Facility
and
Inflatable Air Structure
Prepared for the
City of Richfield
by
David Braslau Associates, Inc.
3 May 1996
1.0 INTRODUCTION
This Noise Assessment of the proposed Academy of the Holy Angels athletic facility and
inflatable air structure was requested by the City of Richfield to identify potential noise impacts
on the adjacent residential area to the west.
A presentation was made by Dr. David Braslau to the mediation group meeting on Tuesday
evening, 16 April 1996, in the Richfield Community Center. The primary issues and potential
for impact discussed at that time are summarized in Section 2.0 of this assessment.
During that meeting, several outstanding questions were raised by the neighborhood regarding
noise issues that had not yet been addressed. Responses to those questions are contained in
Section 3.0 of this report.
Academy of the Holy Angels - Noise Assessment Page 1
2.0 NOISE ISSUES
The noise issues discussed at the mediation meeting on 16 April 1996 are summarized below. A
copy of the overheads used during that presentation is included here as APPENDIX A.
The primary source of noise at these homes is traffic on 66th Street and the Crosstown. Even
though the Crosstown is a half -mile from the area, it is elevated and carries a rather high
traffic volume. The observed weekday daytime background level was 50 dBA. Saturday
background was observed to be 42 dBA which is representative of levels that might be
expected during the evening hours. This is several dBA lower than the 45 dBA background
level estimated at the mediation meeting.
The fan(s) that are used to keep the dome inflated will be enclosed or shielded by the
bleachers on the east side of the athletic field. Although no sound level was provided for
this fan, it was described as a low flow/high pressure fan which generally emits less sound
than a high flow/low pressure fan. With an estimated level of 65 dBA at 3 feet, the level is
estimated to be less than 40 dBA at the residential area which is at or below the estimated
ambient level.
The heater and fan to maintain temperature in the bubble will also be shielded by the
bleachers. While a sound level of 65 dBA was reported for this source prior to the meeting, a
level of 75 dBA was observed at the Augsburg bubble. With careful shielding of this
equipment, the sound level could be reduced to 40 dBA or below at the residential area to the
west. Some cycling of this equipment (and hence associated sound) will occur depending
upon temperature
Academy of the Holy Angels - Noise Assessment Page 2
1.11' 1.11 •' • 1' • • /.i•_ •-•• _
Based upon previous studies of crowd noise, the noise level from spectators is estimated at a
maximum of 72 dBA. This will last only a short time since maximum shouting effort can
only be supported for a short duration. Moreover, this level of noise occurs only periodically
during sporting events. Crowd noise occurs more suddenly than aircraft but lasts a shorter
time. A typical level of an overflying jet aircraft was observed at 72 dBA in the area, but that
level lasted for 20 to 40 seconds.
m=- FINITSTO-47MV711 11 1 !.• 11 • ..1 _. . ._, . • • • :_ •m.
With speakers mounted on light poles on the west side of the playing field, but pointed
towards the east to cover the bleachers, the estimated level at the homes is 60 dBA without
any additional shielding of the speakers. This assumes directional speakers that focus the
energy towards the east and do not spill or waste sound energy behind the speakers. With
structural shielding of the speaker, a level of 45 dBA is expected at the residential
neighborhood. Since speech carries information content and is different from background
noise, it may be intelligible although careful speaker design should be able to minimize its
intrusiveness.
Trucks or trains traveling between the homes and bubble generate noise that could also be
reflected from a structure on the Holy Angels property. Because of its construction, the
fabric bubble will reflect primarily higher frequencies that decay faster in the atmosphere.
Also, because the bubble is curved (see copy of overhead in APPENDIX A) , reflected sound
is likely to be reflected upwards and over the adjacent neighborhood. A permanent structure
with vertical walls could generate reflected noise and hence possibly increase noise levels
from intervening traffic. This also suggests, however, that any low frequency noise
generated within the bubble is likely to be less attenuated by the bubble fabric.
Academy of the Holy Angels - Noise Assessment Page 3
MM / l 1 11 a A .1 . 1. •
The bubble material is more transparent to sound than normal construction. Therefore, sound
from activities within the bubble should be minimized. No amplified sound should be used
within the bubble. Normal sounds will be slightly enhanced within bubble (+ 3 to 5 dB)
because it is an enclosed space. Based upon the weight of the bubble material, an attenuation
of 10 to 15 dB at typical speech frequencies can be expected. Therefore, sounds from within
the bubble should be somewhat lower than from the same location but without the bubble.
MO - 1 F101634113FROMMM ! e_1 ! 1 1
The north/south orientation of the athletic field is preferred over the east/west orientation
f 11iTK4
Bleachers may provide less shielding of fan noise when oriented east/west
Pole- mounted speakers cannot be as well - shielded from homes
Some trees will have to be removed
Academy of the Holy Angels - Noise Assessment Page 4
3.0 RESPONSES TO QUESTIONS FROM MEETING ON 16 APRIL 1996
Sound Level Measurements at Augsburg Dome
Readings were taken at several locations in and around the dome. Some general findings are
presented below.
The only sound that was detectable at the emergency doors was air leaking around the door
itself, causing a sound level of 64 dBA. This would drop to about 35 dBA at the nearest
residence and would probably not be audible.
The loudest noise observed was from a vent on the adjacent building which provided heat
and pressure. At 3 feet this measured 75 dBA. Even if this were unshielded, it would drop to
about 35 dBA at the nearest residence. When shielded by the bleachers it would be even
lower.
One unexpected sound that was observed could be a problem if not contained. Only two
students were kicking a soccer ball towards a goal inside the dome; when they missed, the
impact of the ball on the dome was somewhat akin to a weak drum and has the potential for
being somewhat disturbing. The impact level measured 62 dBA at 15 feet and could be as
high as 50 dBA at the nearest residence. Since as many as 20 students might be shooting
goals at any one time, it is critical that a net be hung inside the dome where a ball could
impact the dome wall at a relatively high velocity. This is evidently common at some other
locations.
The readings are summarized in the table below.
Location/sound source Typical Sound Level (dBA)
Air outlet inside dome ( @3 ft) 68
Center of dome 59
Emergency door (inside dome)(@ 3 ft) 63
ncy -------------- - - - - -- Emerge door (outside dome)(@ 3 ft) 62
Ball impact against (@ 15 feet) 64dome
Heater" vent ( @3 ft) 75
Academy of the Holy Angels - Noise Assessment Page 5
Sound from within the Dome
While an exact prediction of sound level from activities within the dome is difficult; the
following comments can be made:
No bleachers will be erected in the dome
Therefore any crowd noise would be lower than might be expected in summer with open
bleachers
While any sound generated within the dome may be slightly higher than outdoors because of
the enclosure, sound outside of the dome will likely be somewhat lower than it would be
outdoors because of the transmission loss of the dome material
No plans for loudspeakers are anticipated within the dome
Therefore sound levels are likely to be lower with the dome than without the dome
As noted above, netting should be used to prevent the impact of balls on the dome itself
Sound from Loud Sneakers
The residents expressed concern that, since they could hear loud speakers from Richfield High
School, this would be a greater problem with the new Holy Angels facility. Richfield High
School is located approximately 2,400 feet south of Holy Angels. The location of speakers and
level used at Richfield High School has not been determined. However, assuming that those
speakers are 100 feet from the intended spectators and set to provide 85 dBA at a typical
spectator, a sound level as high as 57 dBA might be perceived in the Holy Angels neighborhood.
With a background sound level of 40 to 45 dBA, this sound would be clearly audible. If those
speakers were placed only 50 feet from the audience, the level would fall to 51 dBA. If the
speakers were properly directed at the spectators, the level could fall to 31 dBA or lower and
may not be audible at that distance.
Based upon the type of treatment of loud speakers discussed above, it can be seen that careful
design of sound system at Holy Angels will be necessary to control the level at the adjacent
residential neighborhood. The audience will be approximately 350 feet from the residences. By
Academy of the Holy Angels - Noise Assessment Page 6
placing the speakers no further than 50 feet from the bleachers and directing the sound at the
spectator area only, the level at the nearest residences could probably be reduced with careful
design to 40 dBA or less. Therefore, while the Richfield High School athletic area sound system
may be audible, this is not directly relevant since careful design can greatly reduce sound levels
off -site from public address systems. Whether the level can be reduced low enough to prevent
intelligibility of the signal is uncertain, however, since speech may be understood even at very
low levels. This will have to be determined during the design phase.
holyang.rep 96030
Academy of the Holy Angels - Noise Assessment Page 7
APPENDIX A
Copy of Overheads from Meeting on 16 April 1996
APPENDIX A
Copy of Overheads from Meeting on 16 April 1996
I—
J
V
LL
U
W
uiJ
H
a
V
Z
a
J
O
2
U)
N
N
O
Z
O
d
0
N
a
0
L
D
U
C
0)
ca :3
O Q
c
cc
Z
L 5
QD N
c
o O
S U
a
U
L-
W
a)
C
C
W
0
C
U
o
Z
m
L
E
a)
ca
U
L
W
E
O
Ar`
W
U
O
O
U
co
O
Q
cn
U
U
a
cu
U
w
Q
c
0
i
E
E
U
i
U_
C
L
U
Q)
I—
a)
Q
a)
1
cn
C
75
cn
c
O
U
U
U
a
0
U
c
U
75
c
0
z
L
c
C
0
U
C
O
U
W
75
c
U
L
OP..
18/'
1
p•w•
t' - " .
u '1 : ' r
J- .. ;••(
sf..,; :• _•
w
S ;
r 1 w :, `' '• ,r :-_ ,: -. dam,• Ir
ILSA O-A
m: LAO
117 • !. Y ~
f—
3 a -
Ism
r •^ a - 7 i •
a. ::
yi- h rti ::.• -. w _..- `. as f.+ j'(ti
arm,:. _ .
r . -0.
fto
lot
1 _.a t. tom' ,.5
rjb- .. • .
S. - - r.aLF c
a — -, r - t ! T • w _ . ,,•2 j. [, - .::+: - ' • - . -,
tom
Q' --' w•.t. ' t .} .•)1 • CCC44"'••• ':
a''L-' _ ---, -
r "•'_. "?'L.;•L_ T'.
1111 '(;i,K.•,
r ,._•' --- -•-•.. ..3a= :".•w'n 4c it =. — r:sf.
yr_
v • 3 - - i
E :
r.
Fes' •' • ;
r `: , a 'j •
f / \ 3 -•'•? va.• i. - ._... _ '
1
i ' ' +' .. $t a L• + y _ -
r^ ` is i d a .i
aR " ' •
ii }7 L$
j jij`' .. '';• 7 ''
r i )I ° '._ -'.
a ..• •1 •, .:`J, \
at -yJ. • _ a,._, -•• M1(.4 'aft.'.; 4' ,, P. . '. •-
r"' •? `.
i .r ' -; c `•.
Is
Is
Qom•+ - .. .
f
S , - t 'i- 5 Y'•: - '•.
Z •
Y
is i .. •T' _ r _ v -,;; • f: =".- _' r 'i. : $' e $ r:
L-,A T -^ p ~.. -ry. ,
r ~•' ` r -
t L -a "` S _ -
4 m`
ir'
y`
i 1.Y
As
P4. "
IL
le
All 1.6
Y'
v+a(, - ,
y ' .,
T b ,
1`
r - -
1';r
F' • -_
1•-
i.,
s .
r'i.•' ` a -_ '• ^- ..•.:
q' ' +`` `tti:i-'i, 'r7r a' ,'.
ii• a" i u .a ' .f'••e _
1. -
S"
j- `•._•- •
t.•• [s. ;' `••
a._ .' -
F41, -
y , _ 7.• S
W -( •, , •
Y•r 1` -: • •
t.• :
f',"u.,,;
U_
L
fr
cu
D
cu
L
V
7
cu
O
L-
E
O
L
4
0
cu
E
Q
N
E
s
O
N
a)
co
E
O
cu
E
co
W
W
MQ
W
0
LO
O Ln
II II
a .>
0 W
n0
W
0
W
Q
D
O
C
O
O.
cn
C
cn
C
U
O
4-
n
E
O
N
N
O
cn
Z
co
cuL
U
O
O
N
N
c
cu 0
qt
CO
cn CO
O
U
C N
N
cu '
N E
cn
li W
N
L
cu
L
a)
Q
E
a)
t
C
O
C.
cm
C
a)
n L
W
U
U
N O
co O
cu 0
U a) C
O N 3
N O
cn
N fl CU
CU D
0 Cca
N
0
L
aQ
Q
CD
crcn
O
O Q?
U r•'
Q C
O U
CUNt E N
O cu i O
cn
O
U- w fn
Z
SCALE 1/40 V-O" o
14 rl
O
a
0)
C
4-
L-
O
CL
N
U
E
O
co
E
O
cu
N
N
N
O
Z
N
C
U
N
O
L
co
L-
110-
m
cu
0
E
cn
W
O
E
L
cn
cu
co
cn
cu
cu
U
cu
C
cu
S
C
N
co
O
co
L
U
O
N
0
O
O
L
U
C4
C
U
co
11'
O
N
L
O
CN
N
N
CD
C
N
N
co
4
N
O
N
N
L
0
Qi
U
N
L_
cn
L
a
cu
a
N
N
C
E
d)
Q
t
E
O
U
E
O
L
cu
N
co
L
c
a
s
N
t
t
N
N
co N
O
O
m m
c0 It c
E
O N
t
E E N
Qcncn
W W n
Speaker: ALTEC MRII594A + 291- OL / -16L
Cluster: ROOF
D0VXCe: Cfilil
Loo : K = +0.0 f
V = -220.0 f
2 +60.0 f
Aim: EL= -15.0
AZ = +90.0
ROT *0.8
Freg: 2000
Contour: -3 dB
Bea" Center:
SPL - 70.5 dB C
Distance = 301
Path time = 26
Edge Points:
p -7.3 dB re: center.
p -4.7 dB re: venter.
p -0.6 dB re: center.
Q -4.7 dB re: center.
Boundary Surf ace No. 1
Created using AooustaCADD <TM>
Apr, 16, 1996 at 15:36 One speaker directed across field
Clipping: OFF
eat = STADIUM
47
O
N
E
s
co
O
N
O
O
N
N
o
Z
C
cn
U
O
O
cn
N
N
o
Z
C
O
C
O
N
N
C
V
4_
C
Q
X
E
O
Cf) N
co
UON
E
N
U
C
65
0
C
E
Z
N
C
N
cr
N
a
N
O
p
O
S
N
O O
4«-
O
co
L
N
O
E
OU
cb CO N
N
3
N
cu
Cc
E
C
Co
N
N
O
N
0
m
O
y.
0
O
j
N
N
N co
co
Z I— Q
O
CL U
N
C
N
N 2 S
C
co
N
D
CY
0)
C
Q
N
C
L
co
3
cu
N
N
cn
L
C
E
CL
U
N
I
Q L
C
O p m
U
m
c N
Q
C
cn
U
O
O
cn
N
N
o
Z
C
O
C
O
N
C
V
4_ to Q
X
E
E
O
Cf) N
co
UON
E
N
C
65
0
C
E
Z C
N
cr
N
a
N
O
p
O
S
N
O O
4«-
O
co
0
CL
co
C
C
O
t,
m
co
O
E
co
cb CO N
N
In
t--
0O
p
cu
Cc
E
C
Co
N
N
C
O
N
E
m
O
y.
0
O
j
N0
co H Z I— Q
z
Q
W
Ja
Q
N
Cl)
m
U
N
L
O
U)
O
C
C
m
s
m
L
WL
Q
N
N
N
C
O
U
N
L_
U)
U)
m
N
C
W
4
4—
O
O
m
C
L
L J
O
C
C
O
C
O
0
W
O
O
L
Q.
cu
E
co
cu
L
L
U
a)
Vi,
co
E
O
L
E
O
L
FD
L
N
N
u
O
C
C
cu
U
N
L
N
O
N
Q
cn
C
O
E
1
O
I..L
O
E
N
L
N
O
cu
co
LLL
1
Cl
coO
CDa7
y
cm
C
O
L
I
aI N!0
f
N
l I
D
4
A
ii r
it i i In
l
I aeon ufllt
1
I
li 1
m
IIA ;><;p
r
t zn
t
1
J
O
r,
I
n,
I.IJ
m
m
aI N!0
A
N
Z iL
D
A
ii r
it i i In
I
li 1
m
3
II I m
n,
I.IJ
m
m
W
z
N
i I. ST• ^ql'4
n,
I.IJ
m
m
Attachment D
MEMORANDUM
DATE: April 16, 1996
TO: Julie Urban, Zoning Administrator
FROM: George Atkinson, Engineering Supervi or -
X0
SUBJECT: Drainage at Academy of Holy Angels
I have received a plan detailing methods to handle storm water runoff from the proposed
domed athletic field at the Academy of Holy Angels. Although the plan in my possession is
somewhat inadequate in terms of erosion and sediment control during construction, the
site does provide adequate rate and quality control for on site pre - treatment.
The existing storm sewer pipe into the site from 66th St. will have to be cleaned out and
inspected (replaced if its condition is deteriorated) and erosion control in the form of silt
fence or approved equal will have to be provided around this outlet.
Erosion control fence will also have to be placed on all downhill gradients around the
entire construction site.
Aside from these rather minor issues, which will be addressed, the plan is feasible and will
adequately provide for storm water management if the proposed dome is installed.
Attachment E
INFORMATION ON METROPOLITAN AREA DOMES
FACILITY: Augsburg College
ADDRESS: 2211 Riverside Avenue, Minneapolis
CONTACT: Bill Traut of Kraus Anderson.
AREA: Mix of residential, commercial, medical, & educational.
SIZE: This dome is 368'8" long by 214'8" wide and it is 60' to 65' high.
MATERIAL: Constructed of vinyl coated polyester.
MISCELLANEOUS: This dome is the same style as the proposed Holy Angels dome. The only difference
is that the Holy Angels dome will be 6 feet longer. Augsburg's dome is seasonal and
it has already been taken down for the summer.
FACILITY: Bielenberg Sports Center
ADDRESS: 4125 Tower Drive, Woodbury
CONTACT: Dave Black, Manager of the Bielenberg Sports Center.
AREA: Located in the middle of a park that is surrounded by farm land.
SIZE: This dome is 270' long by 180' wide and it is 55' high.
MATERIAL: Constructed of a polyvinyl coated fabric.
FACILITY: Decathlon Club
ADDRESS: 1700 East 79th Street, Bloomington
CONTACT: Dave, Head Engineer of the Decathlon Club.
AREA: Commercial
SIZE: This dome is 320' long by 120' wide and it is 33' high.
MATERIAL: Constructed of tedlar coated reinforced plastic.
MISCELLANEOUS: The dome has been taken down for repairs.
FACILITY: Nicollet Tennis Center
ADDRESS: 4005 Nicollet Avenue South, Minneapolis
CONTACT: Mike Vidar, Manager of the Nicollet Tennis Center.
AREA: Residential
SIZE: There are two domes.They are both 308' long by 124' wide and they are 40' high.
MATERIAL: Constructed of high strength polyester. Coated on both sides with polyvinyl chloride.
Page 1
Hearing Examiner Testimony
Academy of Holy Angels
6600 Nicollet Avenue South
Richfield, Minnesota 55423 -2498
Fox 612- 798 -2610 * Phone 612 - 798-2600
The Academy of Holy Angels, accredited by the North Central Association since 1932,
offers a unique and vital choice in education. The Academy community seeks to
continue that tradition into the 21st century. The mission of Holy Angels, a Catholic
secondary school, is to teach, guide, and motivate students from diverse populations.
The Academy develops the whole person by nurturing in students a sense of
responsibility from spiritual, intellectual, physical, emotional, and social perspectives.
The Sisters of St. Joseph of Carondelet own the buildings and grounds and the school is
presently operated by a private corporation. The corporation is currently negotiating a
long -term lease with the Sisters.
Holy Angels seeks to enter the new millennium as a unique and vital school whose
students and graduates share an aspiration to be leaders and creators of the future. To
achieve this vision, the Academy offers a balanced program of strong curricular and co-
curricular activities and the leadership of the school has committed to gathering the
human, fiscal, and facility resources necessary to achieve fulfillment of this vision.
1. What is Holy Angels proposing to do?
As an integral part of its vision, Holy Angels is proposing to construct a multi- purpose
seasonal athletic facility. The concept and design of the facility employ state -of- the-art
technology and materials, while achieving economies of construction and operation.
2. Why is Holy Angels interested in building a new athletic facility?
The decision to move forward with the proposed was not arrived at lightly. Serious
discussions took place at all levels of the Academy over an extended period of time and
various altematives were considered. However, it became abundantly clear that Holy
Angels has a large number of students who participate in co- curricular activities and a
substantial shortage of suitable facilities in which to do so. In an era where both parents
frequently work, students and parents want these activities. Also, winter time
involvement in activities decreases by approximately 50% due to limited indoor playing
time and practice facilities.
3. Why is this facility so critical to the Academy?
The construction of this facility will constitute a visible and compelling symbol of the
Academy's intention to function, and to thrive at the same location which has served it
well for the past six and one -half decades. But perhaps of equal importance, achieving
the vision of the school is viewed as an issue which will directly and dramatically affect
its ability to attract students as well as impact the school's future viability.
t
Upon our heritage we build the future.
4. Who are the architects and builders?
Tushie Montgomery Associates and Kraus - Anderson Construction Company are
respectively the architects and builders.
5. What will the proposed project consist of upon completion?
The plans for the facility call for an artificial playing surface; an inflatable, air supported
dome allowing for winter usage; two external bleachers to accomodate approximately
1,000 spectators; and an attached building with a lobby, office, team changing rooms,
restrooms, concessions and a ticket office. It is modeled after Augsburg College's
athletic facility with some improvements and refinements to meet the needs of Holy
Angels. The playing surface dimensions will be approximately 215' wide by 374' long.
The facility will have lights for evening events, a public address system, and a press
box. The project will be fenced for security and safety.
6. When will the dome portion of the facility be up?
The dome is expected to be up from approximately November 1st to April 30th; but in no
case to exceed 180 days. This is expected to be a stipulation of the Conditional Use
Permit.
7. Who will be the principal users of the facility?
Priority will be given to the students of the Academy during the school day and the
Richfield community, neighbors, and local youth and adult sports leagues will be given
priority before and after Academy activities. This will eliminate waiting for hours as is
common at Augsburg.
8. How will the proposed facility be used?
The Academy and the community would use the facility for physical education, training
and conditioning, football, soccer, softball, track training, and other sports with the later
addition of sports courts. In addition, the facility could accomodate lock -ins, retreats,
fine arts exhibits, all class reunions, church functions, catered events, and other similar
activities.
Holy Angels will also be selectively renting the facility to organized, youth and adult
sports leagues (i.e. Richfield Soccer Association).
Community activities such as athletic leagues, craft fairs, aerobics, walking and running,
classes and clinics, fine arts displays, elementary school track and field, antique and
collector shows, chess tournaments, family reunions, and small indoor carnivals are
representative of the types of activities that could be expected at the facility.
This facility will be the only indoor soccer arena in Richfield.
9. What will not be in the facility?
No permanent seating exists within the facility and no rock concerts will be booked.
Further, the facility will be an alcohol and tobacco free space.
10. Who have been working on this proposed project?
Talented people from our community have been working diligently to develop the
construction documents, arrange financing, and develop a conservative, workable
business plan to operate the facility. Of special note, the Sisters of St. Joseph of
Carondelet have been especially supportive.
AHA has also been working with City of Richfield staff, Planning Commission members,
and Council members to receive the necessary approvals to proceed with the' project.
11. How will the Academy pay for the facility?
Tuition will not be raised to pay for this facility; rather, fundraising, corporate
sponsorship, and selective rentals are expected to retire the debt.
12. What traffic and parking problems are expected to be created by the
facility?
Traffic and parking patterns are not expected to change and St. Peter's has offered their
parking lot for overflow parking. No new entrances or exit streets are expected to be
necessary to accomodate the facility.
13. Will an Environmental Assessment Worksheet or an Environmental
Impact Statement be required?
Because of its nature, this project does not warrant or require an Environmental
Assessment Worksheet or an Environmental Impact Statement.
14. Can the sight of the facility and fencing be obscured in some manner?
Current plans call for new trees to be increased in size to 12 - 14 feet.
15. How will the facility affect water drainage?
The facility as designed should be capable of handling 8" of water per hour which
enhances drainage near the west end of the campus.
16. How many options have been considered for location of the facility
on campus?
In response to suggestions from the community, three additional locations have been
considered for the proposed facility. Initially, the plan located the facility running north
and south in parallel and close proximity to the Soo Line railroad tracks. Subsequently,
three additional sites were actively investigated ... (1) parallel with 66th street, (2)
diagonal across the Academy's property; and, (3) seventy (70) feet east of the original
site plan. The Academy also investigated digging the facility into the ground to reduce
the visible size. However, the architect determined that it could only be ten (10) feet
lower in the ground. This would cost an additional $300,000 to $500,000.
Of the options, #3 appears to be feasible, the safest, and the most economical. It also
appears to be the least objectionable to the community, and the Academy will pursue
this option.
17. What will be the normal operating hours of the facility?
When the dome is up, the facility is most generally expected to be open during the hours
the school currently operates, approximately 6:00 a. m. to 12 midnight. Weekend hours
are expected to be abbreviated.
18. Will the lighting and public address system be annoying to neighbors?
Lighting and sound experts are being consulted to minimize the lighting and sound
intrusion into the surrounding neighborhood.
19. What security will be provided for events held at the athletic facility?
Off -duty Richfield police officers will continue to provide security during major events as
they have in the past. However, Richfield Public Safety does not view the Holy Angels
campus as a troublesome area and does not expect the project or its events will be a
cause for concern.
20. The dome of the facility is air supported. Will the blower noise be
annoying?
The blower noise will be shielded from the community by its location and a sound expert
provided by the City of Richfield has indicated the noise level should be minimal at the
originally planned site. Moving the project further east should minimize the sound even
further.
21. If the proposed facility is constructed, what is AHA's plans for ongoing
communication with the community?
Holy Angels anticipates establishing an advisory board composed of representative
members of the community as a method of encouraging regular communication and
receiving input concerning the operation of the facility.
22. The Academy of Holy Angels - an asset to the Richfield community.
The Academy of Holy Angels has been located in Richfield since 1931 and is currently a
3,500,000 business.
The Academy has provided an academically strong education to thousands of Richfield
residents at no cost to the taxpaying public.
The school's current payroll for faculty living in Richfield is approximately $200,000.
Forty -six Richfield families currently send their children to the Academy. A large
incoming freshman class in the Fall is expected to significantly increase this attendance.
The school district portion of the taxes paid by these Richfield families does not pay for
the education of their children.
The Academy does business with 38 firms in Richfield and spends approximately
75,000 with them annually.
Holy Angels also serves the community of Richfield by:
Providing theater and athletic events which are well attended by
Richfield residents.
Staff and students serving on commissions.
Participating in community events such as sponsoring a scene for
Halloween in the Park and providing singers and a bugle player
for Memorial Day services.
Being a member of the Richfield Chamber of Commerce.
23. What are the advantages to Richfield of having a seasonal sports
facility on the Holy Angels campus?
When not in use by AHA students, Richfield residents and
organizations will receive first priority to use the facility. The
Academy is presently working with community representatives
to accurately assess Richfield's total needs for the facility.
School district facilities are increasingly overcrowded and the
stadium should help to reduce the pressure on existing space.
Playing soccer is generally not permitted within Richfield
facilities and the proposed stadium would provide quality space
for this activity and others.
There will no cost to the taxpayers.
The stadium should enhance the visibility of the City of Richfield.
People will be "going to Richfield" rather than Blaine, Woodbury
Augsburg, and other similar locations.
Richfield and other surrounding area teams will have a quality
facility in which to practice and play and they will enjoy a "home
field" advantage.
It should provide quality space for all types of community
activities.
Local businesses should benefit from the presence of athletes,
parents, and spectators from outside the Richfield community.
Most important, it will measurably assist in the development and
education of Richfield youth.
rce/5 -17 -96
Hearing Examiner Testimony
May 20, 1996
Bruce Palmborg
Director of Community Development
City of Richfield
Richfield, MN 55423
Dear Bruce,
In response to your letter of May 13, 1996, this letter submits testimony to the Hearing
Examiner regarding the Academy of Holy Angels (AHA) athletic dome proposal. This letter is
written on behalf ourselves and a number of neighbors and residents organized for this case as
SAVER (Save A Valued Environment in Richfield).
1) VARIANCES HEARING OF MARCH 16, 1996
Hearing Officer, Connie Murray, at the March 26 hearing, received testimony on variance
requests to allow height of 60' for seasonal inflated structure and for height of 10' security
fence.
a.) Since that hearing, the height has been described as 65'. The increased height adds to the
concerns that this massive (approximately six - stories high) structure is not compatible with a
residential neighborhood, would be psychologically depressing and visually offensive when
inflated during the winter months, create a low- quality image of Richfield, block the solar
access of adjoining property owners and residents, devalue properties near the proposed site
which, in turn, leads to reduced tax revenue), increase traffic on nearby residential streets,
likely lower the quality of future developments in the area, and other issues presented at the
March 26 hearing and subsequent meetings.
b.) The 10' security fence introduces visual blight and would be most apparent during the time
the dome is down. The proposed location on land elevated above residential properties nearby
amplifies its offensiveness —both visually and audibly.
2) SETBACK VARIANCES
The 39' setback from the property line falls short of requirements of Richfield Code 521.11,
requiring a 40' setback, plus one additional foot of setback for each foot of structure height
above 42'.
Setback is of prime importance to preserving the character of residential zones. In the case of
the large mass of the proposed inflated dome, setback reductions further depress nearest
properties. (Our research has found no other dome equal to the size of the proposed dome in the
Twin Cities metropolitan area, save the Metrodome in downtown Minneapolis. And no others,
regardless of size, are located in residential areas.) The proposed quasi - public use requires
convenient access and is unique in that east Pleasant Avenue has yet to be developed along this
site. West Pleasant Avenue is already a very narrow, substandard sized street (just 20' wide).
Anticipated need to develop access at east Pleasant argues against any relaxation in setback and
suggests need for extended setback.
Why was setback not considered at the variance hearing?
3) OTHER VARIANCES
A number of other concerns relating to the proposed dome have been raised. Perhaps research of
city code would identify the need for additional variances. Concerns include:
a.) Noise:
The inflation mechanism for the dome adds to the ambient noise in the neighborhood, as does
Page 2
May 20, 1996
Hearing Examiner re. AHA athletic dome
crowd noise, amplified loud- speaker noise and other mechanical noise.
b.) Inflated Structures:
Safety and visual impacts deserve review.
c.) Hours of Operation and Types of Activities:
Weekend and late evening usage is proposed and would provide additional disruption to the
neighborhood.
CONCLUSION
Zoning ordinances are in place to protect residents and property owners. Variances should not be
granted if detrimental to the residential community. Residents and homeowners can reasonably
expect the support of the city in upholding established codes and ordinances of the city.
Residents are being asked to bear the brunt of the burden for the proposed dome, while the
Academy of Holy Angels reaps the rewards. By proposing to locate this massive structure 100'
from residential properties —in the furthermost corner away from the school itself and as close
to residential properties as possible —AHA is effectively turning its back to the numerous
offensive aspects of the structure.
Other issues, such as depreciation of property values, off - street parking, access, drainage,
impact on community development, light emissions, loss of solar access and others seem to
relate more to the conditional use permit than to variances. Residents concerns on such matters
will be provided upon request.
being asked to bear the brunt of the burden for the propose ile the
Academy of Holy An ge rewards. By pro o ' e this massive structure 100'
from residential properties —in the further er way from the school f and as close
to residential properties as AHA is effe e - itsJ2umerous
offensive asDe structure.
Granting of variances for the proposed dome will have a negative impact on residential
neighborhoods. Please contact us for additional arguments to support denying the requested
variances.
Sincerel
6
Burton Miller
Co -Chair
Save A Valued Environment in Richfield
6712 Pleasant Ave. S.
Richfield, MN 55423
869 -4997
0
ames Vargo
Co -Chair
Save A Valued Environment in Richfield
6630 Pleasant Ave. S.
Richfield, MN 55423
866 -3953
Copies to: Dr. Jill Reilly, Principal, AHA
Mayor Martin Kirsch
Block Captains, SAVER, Athletic Dome Case
CITY OF R10HRELD
Knnrom commission
Rclion Requoit
Item: #2 Agenda Section: Public Hearing
Case: #96 -RZ -1 Date: May 28, 1996
GENERAL INFORMATION
Petitioner: City of Richfield
Location: 7700 Lyndale Avenue South
Type of Request: Rezoning from C -3 (high density commercial) to C -2 (general commercial)
Zoning: C -3
Land Use: Commercial
Comp. Plan: Freeway Strip
References: (see attached Citations section for excerpts)
Zoning Code: 526.57; 526.49; 526.53
ACTION
Proposed Change: Rezone 7700 Lyndale Avenue South from C -3 to C -2 to allow construction
of a municipal liquor store
Staff
Recommendation: . Approve the rezoning.
HISTORY
Public Notice: Notice of the Planning Commission's consideration and public hearing was
mailed to all property owners within 350 feet of the subject property.
Public Hearing: The Planning Commission will conduct a public hearing on May 28, 1996.
Hearing Examiner: The Hearing Examiner will conduct a public hearing on June 18, 1996.
City Council: Planning Commission action would set a City Council public hearing date of
June 10, 1996.
ANALYSIS
Background: The City is in the process of purchasing the property at 7700 Lyndale
Avenue to install a right turn lane from eastbound 77th Street to southbound
Lyndale Avenue. The property taken for the roadway requires removal of
the building that houses the Conoco service station, so the entire property is
being purchased by the City.
Proposal: On August 14, 1995 the Council approved a plan to develop a fourth
municipal liquor store on the residual property. The 10,850 square foot
store will be located on the north half of the site. Parking will be shared
with the adjacent Shops at Lyndale shopping center. The building itself will
be designed to complement the shopping center:
Issues: 1. The property was zoned C -3 (high density commercial) in the late
1980s to encourage high density commercial development along I-494.
The parcel that will remain after the taking will not be large enough to
support high density commercial development. The minimum lot size
for a project in the C -3 district is 1.5 acres; the parcel at 7700 Lyndale
Avenue after the taking will be 0.4 acres.
2. The proposed building will require a variance due to the irregular shape
of the parcel. The Hearing Examiner will review the variance request
on June 18, 1996.
3. The City Council conducted a first reading of the rezoning on May 13,
1996 and directed the Planning Commission to review the proposed
rezoning.
RECOMMENDATIONS
Recommended
Action:
Preferred: Recommend that the City Council approve the request to rezone the
property at 7700 Lyndale Avenue South from C -3 to C -2.
Basis: 1. The parcel that remains in this portion of the ILN Redevelopment Area
does not meet the minimum lot size requirement for the C -3 district and
is not large enough to support high density development.
2. The proposed municipal liquor store offers a workable project given the
site constraints.
3. The proposed retail use and C -2 zoning are consistent with the adjacent
retail shopping center and with the Comprehensive Plan.
Alternative: Recommend that the City Council deny the request with a finding of fact
that the proposed use would have an adverse impact on surrounding
properties or the City as a whole.
ZONING CODE:
CITATIONS
SECTION 526 - ZONING: COMMERCIAL DISTRICTS
High Density Commercial District (C -3)
526.47. Minimum floor -area ratio. The minimum floor -area ratio (FAR) for any lot shall be 0.75.
526.49. Minimum lot width and area. Subdivision 1. Width. The minimum lot width shall be 150
feet.
Subd. 2. Area. The minimum lot area shall be 1.5 acres.
526.53. Setback requirements. Subdivision 1. The requirements set out in this subsection shall be
the minimum setback requirements for all improvements in the C -3 District, including new
construction or structural alteration.
Subd. 2. Buildings and parking structures. Building and parking structure setbacks along
public streets shall be at least 40 feet. A building or parking structure may extend to an
interior lot line if that structure and the adjacent structure are designed with such placement in
mind and a compatible relationship of uses, results including circulation drives, open space,
parking areas, and glazed facades. Otherwise, the setback from the interior lot line must be at
least ten feet or equal to at least one - quarter the height of the building, up to a maximum of 20
feet of setback.
Subd. 3. Surface parking areas. Surface parking areas shall be set back from any public street
right -of -way at least ten feet, or a distance sufficient to allow the placement of a landscaped
screen or berm with an average height of three feet between the street right -of -way and the
edge of the parking area. Surface parking areas shall be set back from any building at least ten
feet, or a distance sufficient to allow the placement of landscaping designed to soften the
appearance of the building if such building is visible from any public right -of - way.
Subd. 4. Vehicular circulation aisles. Internal driveways shall be set back from interior lot lines or
structures at least ten feet or a distance sufficient to allow the placement of landscaping intended to
soften the appearance of the driveway from a public right -of -way or an adjacent building or parking
ramp.
PROPOSED ZONING
77TH STREET
INTERSTATE 494
POST TAKING PROPERTY LINE
W
D
z
W
Q
W
J
a
0
z
9
A,!
NORTH
SCALE: V=10'
5 -6 -96
T I
LYNDALE AVE. `Ul.ITH
1
fJRICHFIELD MUNICIPAL LIQUOR
r RICHFIELD, MINNESOTAE$
gutl
fJRICHFIELD MUNICIPAL LIQUOR
r RICHFIELD, MINNESOTAE$
gut
4k
figa•
VIOS INNIW
dOfIOl'l -lVdIOIN11W G131dWAH i
oW
Wvv
O
I i
him
Ir/ .................._
Jill
i I .
g =
5
a5z
g =
5
a