02-24-1987P L A N N I N G C O M M I S S I O N C I T Y O F R I C H F I E L D F E B R U A R Y 2 4 1 9 8 7 7 3 0 P M A G E N D A R O L L C A L L A P P R O V A L O F M I N U T E S Regular Planning Commission Meeting of January 27, 1987 Special Joint Planning Commission/Community Services Advisory Commission Meeting February 10, 1987 P U B L I C H E A R I N G S Item ~~l Case ~k87-SD-1 SuCdivision Request at 7332 Upton Avenue South N E W B U S I N E S S Item ~~2 Information Letter ~~8 Item 3 Information Letter ~~9 Item 4~4 Information Letter ~~10 Item 5 Information Letter ~~11 Item 6 Information Letter ~~12 O L D B U S I N E S S L I A I S O N R E P O R T S Existing Ordinance Provisions Related to Zoning Ordinance Violation Penalties Capital Improvement Program Bylaws Election of Officers Liaison Appointments School Board Community Services Advisory Commission HRA City Council ILN Committee A D J O U R N M E N T PLANNING COMMISSION MINUTES REGULAR MEETING JANUARY 27, 1987 MEMBERS PRESENT: Chairperson Hoverson, Commissioners Erlander, Herrbo.ldt, Jensen, Kauth, Kritzman, Lunas, McDermott and Guam MEMBERS ABSENT: None. COUNCIL LIAISON: Councilmember Kirsch, absent STAFF PRESENT; City Planner, Rick Jopke; Assistant Planner, Towh.id Kazi; Secretary, Jane Skov; APPROVAL OF MINUTES M/Herrboldt, S/Kauth to approve the minutes of the regular Planning Commission meeting of December 16. 1986 Motion carried: 9 to 0. M/Lunas, S/McDermott to approve the minutes of the special Planning Commission meeting of December 30. 1986. Motion carried: 9 to 0. ITEM #1, PLANNED UNIT DEVELOPMENT, CDR - 35W AND 494. Mr. Rick Jopke presented the staff report. Commissioner Hoverson inquired whether CDR would be ready for the Planning Commission meeting in February. She also wondered whether the Planning Commission should continue the public hearing or cancel it. Commissioner McDermott stated that it would be better to cancel the public hearing in case CDR is not ready for the February meeting. Staff stated that public notices would be sent to the property owners whether the hearing was continued or cancelled. The only difference is that the city would be legally required to send Page 2 Planning Commission Minutes January 27, 1987 notices for the next hearing if the present hearing was cancelled, rather than continued. Mr. Jopke stated that because of the size of the project, staff wants to have all the necessary information before presenting the CDR case to the Planning Commission. M/Quam, S/Kauth to cancel the public hearing on the planned unit development for CDR at 35W and 494. Motion Carried: 9 to 0. The Commission felt it was best to cancel the hearing to assure that all property owners would be notified again. ITEM #2, INFORMATION LETTER #1, 1989-1993 CAPITAL IMPROVEMENT PROGRAM Rick Jopke presented the staff report. The Planning Commission stated that the CIP handbook will be very helpful. ITEM #3, INFORMATION LETTER #2, ORDINANCE REVISION TO ALLOM AUTO DETAILING USES IN C-1 ZONING DISTRICTS Rick Jopke presented the staff report. Commissioner Hoverson stated that the definition of an automobile detailing use still fits under the ordinance definition of a garage use and in the C-1 ordinance a garage is not permitted. Mr. Jopke stated that the new ordinance would be creating a new kind of use pulling it away from the definition of a garage use. Commissioner Herrboldt inquired about how concerned staff was whether the city could revoke a license after the license had been issued for many years. Mr. Jopke stated that the city attorney was not concerned that a license could be revoked. A threat to revoke a license also aids in assuring the cleaning up of the property. An auto detailing license would be more strict than car washes. Commissioner Herrboldt also inquired how the city would make sure a business is keeping to the standards of a license. Page 3 Planning Commission Minutes January 27, 1987 Commissioner Hoverson inquired whether the license would re transferable to a new owner. Commissioner Quam believed that the license could not be transferred to another individual unless the business was a corporation and the corporation sold its stock to new shareholders. Commissioner tunas felt that an automobile detailing use does not fit within the C-1 zoning ordinance, especially in paragraph 5 of the old ordinance. Commissioner Quam stated that an automobile detailing use is not a neighborhood use. If this ordinance is changed to permit automobile detailing, that will confuse the standards of the ordinance and make it impossible next time another type of business asks to be considered a neighborhood convenience use. Commissioner Erlander agreed. Commissioner P~cDermott stated that the uses not permitted in a C- 1 neighborhood zoning district have a larger market. She felt that a use that is permitted in a C-1 district should serve primarily the residents of the neighborhood in which it is located. Co~missioner Hoverson stated that the new ordinance is vague and is leaving the city wide open for many different uses in a C-1 zoning district. She also stated that the ordinance did not say enough about the inside use of the building. The ordinance does not stop anyone from using heavy machinery. Commissioner McDermott stated that the nature of the business is not defined in the amended ordinance and the amendment itself is very vague. Commissioner Jensen stated that the property at 7301 Penn is a nonconforming C-1 use. He was concerned about establishing a special ordinance for one lot in the city, so one business can conform. He felt it raised the question, at what point the city should stop passing ordinances for other individual applicants. Mr. Jopke stated that there is only one site in the city this ordinance would conform to. Commissioner Hoverson stated that it would be poor planning practice to change an ordinance for one property. M/Erlander, SlLunas to of the ordinance amend zoning districts. recommend against passage by the council ment concerning auto__detailing uses in C-1 Motion Carried: 9 to 0. Page 4 Planning Commission Minutes January 27, 1987 The Planning Commission wanted the City Council to know that the Planning Commission feels the amendment to the ordinance is not a wise way to legislate on this particular amendment and passingthisamendmentwillcreateproblemsinthefuture. The Planning Commission also wanted the council to know that if the counr_il approves the amendment, the ordinance should be made more clear in the following respects: Commissioner Hoverson stated that in Subdivision 1. Definitions, a better definition of auto detailing needs to be established. Commission Lunas stated that, to remove conflicts, that part of the ordinance not yet amended also needs to be changed with respect to the meaning of "garage" if the amendment to the ordinance is approved. Commissioner McDermott stated that in Subdivision 5, #2, mechanical" is very vague and needs to be defined. She also stated that prohibition of outdoor overnight storage is impossible to enforce. Commissioner Hoverson stated that the license criteria is also vague (painting, venting, buffering, etc.) and needs to describe what is going on inside of the building. ` Mr. Jopke stated that health codes would also help enforce some of the license criteria. Commissioner Hoverson stated that the ordinance provision requiring no parking on the streets is not enforceable. Commissioner Kauth stated that the amendment to the ordinance is not realistic. Commissioner McDermott stated that in subdivision 5, 414, the ordinance is written strictly for the site at 7301 Penn Avenue, which could create problems by defining one site. The commission recommended that the ordinance make clear who the license would be sold to and whether the license could be transferred to new individuals or shareholders without council approval. The council may 4vant to determine whether the license may be granted to an individual or partnership only or also to a corporation. ITEM ~k4, INFORMATION LETTER #3, DISCUSSIONS CONCERNING ENFORCEMENT OF CONDITIONS ON ZONING APPROVALS Mr. Rick Jopke presented the staff report. Page 5 Planning Commission Minutes January 27, 1987 Commissioner Nerr~oldt stated that some type of penalty has to be available for persons who do not follow the stipulations specified. Commissioner Noverson used the Pantry as an example. The Commission recommended that the trees he required to stay and the trees vlere torn down. She as!<ed what the city can do about this. Commissioner ~~cDermott raised the issue of applications that are suCmitted without all details, so that adequate stipulations cannot he formulated, and suggested that the Planning Commission should give staff the ability to say to applicants that the Planning Commission does not avant to see the case until all the information is available to them. She also stated that the Planning Commission could continue a zoning case before it goes to the City Council until the planning commission feels all the information has teen provided. Commissioner Noverson stated that the Planning Commission needs to get more strict. Commissioner Guam stated that maybe a penalty for a zoning violation should he enforced as a misdemeanor. Commissioner McDermott suggested that staff look into a forestry ordinance. ITEM ~5, INFORMATION LETTER ~4, UPCOMING ORGANIZATIONAL MEETING Mr. Rick Jopke presented the staff report. The planning commission made no bylaw changes. ITEM ~6, INFORMATION LETTER ~5, SOLAR ACCESS PLANNING Mr. Towhid Kazi presented the staff report. Commissioner Jensen stated that he was more concerned with the state guidelines for the shadow effect, than for access to the sun for energy purposes. Mr. Kazi stated that the guidelines the commission has been given, also serve as the state guidelines for the shadow effect. Commissioner Noverson stated that Richfield citizens seem to be more concerned with f;uilding shadows than with solar energy. PLANNING COMMISSION/COMMUNITY SERVICES ADVISORY COMMISSION MINUTES SPECIAL JOINT MEETING FEBRUARY 10, 1987 PLANNING COMMISSION MEMBERS PRESENT: Chairperson Hoverson, Commissioners Herrholdt, Jensen, Kauth, Kennedy, Kritzman, Lungs, and McDermott COMMUNITY SERVICE ADVISORY COMMISSION MEMBERS PRESENT: Commissioners Anderson, Asher, Clinite, Day, Meyer, Nelson, Sausen, Shipka, Skwira, and ThurCer STAFF PRESENT: City Planner, Rick Jopke; Assistant Planner Towhid Kazi; Community Services Director, Oon rondrick; Administrative Assistant, Sandy Rosenow. The Planning Commission and the Community Services Commission were scheduled to meet in joint session at 7:30 PM, Tuesday, FeCruary 10, 1987, in the council chamfers of city hall. The purpose of the joint meeting was introduction to the Capital Improvement Program handCook, process and procedures. HandCooks had peen distriCuted earlier. An agenda for the joint meeting was handed out to those present. Introductions were made. Planning Commission chairman Hoverson then turned the meeting over to city staff. Jopke provided highlights from the handCook. The Capital Improvement Plan can he thought of as a link of several other items including: comprehensive plan, fiscal plan, scheduling,Cudgeting, policies, coordinating, monitor/evaluation and information to the pu~lic of investments. Jopke also talked about the relationship of the Capital Improvement Plan and operating budgets. The Capital Improvement Budget (CI8), the first year of the Plan, is part of the annual Cudget and is prepared and presented Cy the city manager. The Commissions involved in the Capital Improvement Program (CIP) may ~e made aware of possidle recommendations for the CIB in order to have a Letter understanding of proposals in the CIP. Other items highlighted by Jopke included: Benefits of a Capital Improvement Program, Capital Improvement Items, OCjectives of Richfield's capital improvement process and Funding Sources. 2- Fondrick then spoke of the long range Capital Improvement Program as a "vision". Two major influences are money and space. The CIP has an almost funnel effect. The further away from the CIB, the more generalized and nonspecific the details of a proposed project. The closer to the CIB a project gets, the more precise the information describing the proposed project. Those influences of space and money may dictate changes in the project; changes which might be in the year(s) of scheduling, the dollar amount proposed, the source of funding and so forth. Specific examples referenced included the golf course and Roosevelt Park. The concept of a golf course was probably considered by the city and its citizens for 20 years or so before it was actually constructed. In 1972 the Capital Improvement Program listed the golf course with studies to be done as soon as possible and construction soon after. The problem at the time was space. Through the years the current sites of Wood Lake Nature Center and Legion Lake Park were considered but rejected as too small or for other reasons. At the time the golf course concept appeared in the CIP, conversation was taking place with the Metropolitan Airports Commission (MAC) to acquire space. As time vrent on, the proposed golf course project continued to be moved hack in the schedule as additional agencies such as Pollution Control and FAA and possible funding sources became involved. When the project finally did begin, staff worked on a much more detailed schedule for the work. This schedule highlighted the various agencies that had to take actions and meeting dates and other requirements in order to complete the project in a timely manner. Unlike the golf course project which changed the year(s) scheduled in the CIP, the total cost of the project and funding sources to be used, Roosevelt Park had no change in year of schedule, dollar amount or funding source as it worked its way through the CIP, into the CIB and into and through construction. Jopke then talked about the various roles assumed during Richfield's CIP process, priorities and the schedule. The floor was opened for questions. Jensen asked what "exempt debt" meant in the 1988-1992 Capital Improvement Program book. Lungs used the proposed project for Penn Avenue and 76th Street as an example that used no city funds as such but was included in the CIP. Fondrick explained that road construction type projects must be included in the CIP and that it takes considerable effort on the part of the city council and staff to secure the proposed funding. In the case of Penn Avenue and 76th Street, for example, Municipal State Aid (MSA) and Federal Aid Urban Systems FAUS) are proposed funding sources. MSA has a formula for use of its funding and there must be a separation of maintenance from construction items in determining which formula may be applicable. Other funding sources may require evidence of the city's consideration and commitment to a project before considering a proposal. C I T Y O F R I C H F I E L D M I N N E S O T A C O M M (J N I T Y D E V E L O P M E N T D E P A R T M E N T Item ~~1 Case ~b87-SD-1 Agenda of February ?_4, 1987 Planning Commission City of Richfield Issue Statement: Public hearing on the request for approval of a subdivision of property located at 7332 Upton Avenue South. Background• Mr. John Lindholm, owner of the property at 7332 Upton Avenue has requested city approval of a subdivision of his property into two new lots. The City Council on August 25, 1986 vacated the unimproved portion of the right-of-way adjacent to his property. The council also stipulated that a utility easement be granted to Minnegasco in order to maintain the gas line and that the gas line be moved or removed and relocated at the sole expense of the applicant. The vacation of the right-of-way allowed Mr. Lindholm to acquire 4,630 square feet of land. The present site with the additional land has a total area of 19,315 square feet. There is a single family dwelling with a detached garage on the site. Mr. Lindholm now wishes to subdivide the property into two new lots. The proposed northerly lot would have an area of 11,566 square feet and accommodate the existing dwelling with the garage. The existing dwelling and garage would continue to meet minimum setback requirements. The proposed southerly lot would have an area of 7,749 square feet. A single family dwelling would be constructed on this lot. The proposed southerly lot would not meet minimum lot width requirements. The zoning ordinance indicates that lot width is defined as the distance between the side lot lines measured along the front property line. Because of the adjacent dedicated park land, the proposed southerly lot has only 13 feet of frontage along Upton Avenue and no frontage along 74th Street. The minimum required lot width for a single family lot in 'R' districts is 50 feet, therefore a variance would be required. A variance application has not re filed by the property owner as of this date. The proposed subdivision is in single family residence 'R' district. The newly created lots would meet the lot area and setback requirements. Zoning Ordinance Requirements: 1. Section 3.59, outlines the requirements for approval of the preliminary plat. 2. Section 3.30, subdivision 4(b) and 5(a) outlines the minimum lot width and minimum building setbacks requirements in 'R' district. Staff Recommendation: Staff recommends that the Planning Commission recommend that the City Council deny the preliminary plat as shown for the property located at 7332 Upton Avenue. Basis Of Recommendation: Staff has reviewed the preliminary plat against the requirements indicated in the subdivision and zoning ordinances and find that the requirements for the subdivision approval have not been met. As previously indicated the southerly lot 4vould not meet minimum lot width requirements. Alternative Recommendation; The Planning Commission may recommend approval of the subdivision request subject to the following stipulations: 1. The property owner obtain a variance for the lot width requirement for the proposed southerly parcel. 2. The property owners have one half of the vacated street added to the legal description in their certificate of title as a part of the final plat approval. 3. The property must be developed as a single family residential lot. Decision Mode: A public hearing has been scheduled before the Planning Commission at 7:30 PM, February 24, 1987, at the Council Chambers, Richfield City Hall to consider the subdivision request. Respectfully submitted, l ~ ~- Towhid Kazi Assistant Planner TK/jls Le+e~ i's7 • i• ~.i"s I~ I ~~~ ..I ,sl i -,i IiVl5ILG1 ~~S.ZI~ e6o WEST 79 7 I / . W i o' Z• c zl n O ~.~ la.d Go III'------~aaa 4q _ ~ Q 6. ~ ~~; =. I-" ~ , .~ Z a mGar _Ll 3 0~ i ~'1 l ~ can i cs~a2~ j, ~, 1~I l~~r~a~~i ~el~o~ ~~~~ ee 3> STREET ~ sip ~ ~~ a~ I I ~ 20l ZONING MAP ~.roN -rwo ~~ CEMETERY NAI p,gR~,M s~.„oN eNE ~,qL I D ..~~ iii L i 2c a.3 ~ '~ d2 ~ ...-.32 ~ . ~; ~ IlJ day `.~ T 5 b-_. 11 :y...._.-_ .. Z 'tl nd $ -. t,. 3 w ~ .71 - _ - STREET a ~. d I v. - ) s~ w s~ e }aW z_ ' I ~ ^Q~ W ...(a~~i4~ ~:' u1~9~" ~' ~ ~.55_ (;~.5~ ,a a~ 'Cb4~i6e 1~C~{~; 60 ~'•~5'~~5~ S:I`~30~. 60 ~(~116e , ~i~1~'~, '`~~11 ~L~O 5 W '4.3 Q I 0,` Q ~`,~1i3 2(~~0);• .n('1115 v ~C4~° ~ r./y0115 2CU71.. to nC~S 2(~/<< N ,n/~~5 2fZ'~w / 2~~.+11..f yj `5... 4 m ~~ O 1 O E~~ e~ 31 ~ 14 3 1 I `1~ 4 _.._. .. 3- hli__. A aw - -- „ ~ I~- ~~ - l~ ~ ~1 4 AC_ E ~~1 ~ ~s /Ao~ _ ~~ q _ ~2 ~ Q- ~4 jPF ~ I O 1 ~- 134.53 ~ ~ba SS~ ~ \ _.._ ._ .._.g' 1 ~ c ~ ~ O ~'}i /.~1 ~ l 4 ~ 1,1113I 4 ~~ I (~r~ 13 4 I(~~1 ~ ~(,~~ 13 4 rAl~ ~~ 13 4 25~ ~ ~' i 3 4 ti 15 ~ rti<` M as r !~''.`` 4 . _ .:`~ X . _.I395L_.. 5i ` ___ _` _ - ` / l6~ l~n -O .. .... .-.... __ __ w'~}W , .` I,~ 3~1~ ~•' w :~'~n s ~ Allz 's 6112 s 1 ql~zs 1 3~ - -- ._ I --- __a , l _ ~ _ : _ Z ~e. s~~ __1>a _(~ ~ ~ ~~-- ~ I ~ ._ __ ~~ ~ - - _ ~Ay (3 . z ~ J (L~) (I,l ,, s(la)0fA ~ e/t 7Z.31 l d4 a1 I as al I I. l .~3 ai ~ I ?4 al I ~ ~xa dl I 3a dl ~ ~ 3'WEST > w - 73rd w i; - ~ ---- - ~ _ 2GSLG6 Rye...... ~VARIANCE M R- 2 D I S 'T R I C T REZONING j - - ST. _IA. LY~R~, A: F~tf.~lCOUNTY SURVEYOR HENNEPIN COUNTY, C I T Y O F R I C H F I E L D M I N N E S O T A C O M M U N I T Y D E V E L O P M E N T D E P A R T M E N T Item ~~? Information Letter ~k8 Agenda of February 24, 1987 Planning Commission City of Richfield Issue Statement: Review of Penalties for Violation of the City's Zoning Ordinance Background: At a previous commission meeting, r_ommission memCers questioned what the penalties were for violating the city's zoning ordinance. Attached for your review is a memorandum prepared Cy the city attorney's office concerning this subject. Recommendation: It is recommended that the commission review the attached memorandum and discuss it with staff on February 24th. Basis of Recommendation: This information is presented for informational purposes Cased on the commission's previous discussions. Alternative Recommendation: -- None Decision Mode: This information is presented for informational purposes only. No formal action is required. Respectfully suCmitted, Rick Jopke City Planner RJ/dh LeFe~~ere Lefler enned.~ O'Brien &: Dra..~z Prulr„iunal hux iaikin 2000 First Bank Place `Nest February 2 0 , 19 8 7 Minneapolis Minnesota 55402 Telephone (612) 333-0543 Telecopier (612) 333-0540 Mr. R1.Ck Jopke Clayton L. LeFevere Clty Planner Herbert P. Lefler City of Richfield J. Dennis O'Brien 6700 Portland Avenue John E. Dravvz David J. Kennedy Richfield, Minnesota 55423 John B. Dean Glenn E. Purdue Re: Various types of relief against zoning violations Richard J. Schieffer Charles L. LeFevere which are available to the Cit Y Herbert P. Lefler III James J. Thomson, Jr.Dear Mr. JopkeThomasR. Galt Dayle Nolan Brian F. Rice I am writing this letter at your request, with the John G. Kressel understanding that the information contained herein Lorraine S. Clugg s M. Strommen Will be made available to the members of the Richfield dH.Batty Planning Commission. Although I have not exhausted am P. Jordan every informational source with regard tot he matter Kurt J. Erickson William R. Skallerud captioned above, I believe I can ive ou an accurategY Rodney D. Anderson summary of the applicable contents of Minnesota Stat- CorrineA. Heine utes and the Richfield Code of Ordinances (Code) alongDavidD. Beaudoin Paul E. Rasmussen with a cursory explanation of the meaning and impacts Steven M. Tallen thereof . The Municipal Planning Act, Minnesota Statutes, Sec- tions 462.351 to 462.364 states at Section 462.362 that a) municipality may by ordinance provide for the enforcement of ordinances or regulations adopted under Sections 462.351 to 462.364 and provide penalties for violation thereof. A municipality may also enforce any provision of Sections 462.351 to 462.364 or of any ordinance adopted thereunder by mandamus, injunction, or any other appropriate remedy in any court of compe- tent jurisdiction." The Municipal Planning Act con- tains the enabling legislation for local zoning ordi- nances. The section of the Act quoted gives municipal- ities the power to enforce their zoning code by ordi- nance or judicial action. The Code complies with the authority granted in Minne- sota Statutes in Code Section 1.10, Subdivision 1, which provides that violations of the Code (of which the Zoning Ordinance is a part) are, upon conviction, subject to a fine of not more than $300.00 or Mr. Rick Jopke February 20, 1987 Page 2 imprisonment for a term of 90 days. In addition, the Code provides that "each act of violation and every day upon which a violation occurs or continues constitutes a separate offense" (Richfield Ordinance Code, Section 1.10, Subdivision 2). It appears that the language of the Richfield Code makes a violation of the zoning ordinance a misdemean- or. However, imposition of the penalty would require a criminal proceeding. Practically speaking, prosecution is not the most adequate method available to achieve compliance with the zoning ordinance. The most signif- icant reason why criminal prosecution is not effective is that prosecution is focussed on .determining guilt and not on achieving compliance. The criminal court can require payment of a fine or jail time in lieu of removal of a violation, but is powerless with respect to actually ordering removal of a violation. Also, the judicial fact finder must evaluate the evidence and testimony according to the strictest legal standard, which is "beyond a reasonable doubt" and which is a very difficult standard to meet. Less important, but significant nevertheless, is the fact that zoning questions may be very difficult for a court to compre- hend. It is unclear from the .language of the Code whether noncompliance with one or more conditions of a variance or special use permit is a misdemeanor. I believe that noncompliance would not be a misdemeanor.. In addition, it is unlikely that a court would consider a case in which .a property owner was being prosecuted for noncom- pliance with a variance or permit condition. The City Council may want to consider amending the Code, to make noncompliance with variance or special use permit c conditions a misdemeanor, since Minnesota Statutes, Section 462.362, quoted above, gives the City .the authority to do so. Authorities (including Dunnell Minnesota Digest and ricQuillen's The Law of biunicipal Corporations) indicate that the statutory remedies of mandamus and injunction are preferred to a criminal proceeding. These are civil proceedings which do not involve a jury. Injunc- tive relief is also especially appropriate and avail- able when the zoning violation also constitutes a nuisance. In addition, an owner of adjacent property can bring a suit for an injunction to restrain an Mr. Rick Jopke February 20, 1987 Page 3 unauthorized nonconforming use or other zoning viola- tions. There are Minnesota Supreme Court decisions which discourage use of criminal prosecution and even damages as remedies for a municipality seeking to require a property owner to comply with zoning regulations and agreements. The Minnesota Supreme Court has upheld injunctive relief where there has been continuing violation of the zoning ordinance. (An injunction results in the court ordering the property owner to immediately discontinue the violation). Examples include enjoining the operation of an adult-oriented bookstore and junkyard and compelling a property owner to remove a portion of a concrete stone building which extended beyond a setback line. In some situations it may be appropriate to require a performance bond to assure compliance with the terms of a permit or variance. If this approach is used, it is important that the terms under which the bond will be forfeit be precise and easily evaluated by all parties. In any event, the City should take a cautious and evaluative. approach in addressing methods of effecting compliance with the zoning code. The same course of actions may not be appropriate in alI cases. Some violators may be willing to pay a fine or other settlement amount. Others may require that the City go forward with a suit for an injunction. I would recom- mend that your Planning Commission and City Council adopt some policy guidelines regarding enforcement of compliance with Local zoning -regulations. These guidelines could include, among other things, state- ments reflecting the relative seriousness of the types of violations and when and under what circumstances and conditions the City would be willing to take legal action in order to achieve compliance when a violation of a specific type occurs. Very truly yours , !! Y~ .' ~~ -~ Mary Frances Skala MFS:caw cc: John Dean 0055LT02.F54 February- 19 , 1987 CITY OF RICHFIELD, Iv1INNESOTA 1988 CAPITAL I~iPR01'E~'IENT BUDGET SL~IM~RY Item No.Project Budget 1388 Source Recreational and Open S pace Development 1 Fores tr3-32 , 615 R 2 Park Land Acquisition 30,000 R 3 Legion Lake 270,500 R 200,000 4 Ice Arena Compressors 12,000 R TOTAL RECREATION/OFEIvT SPACE 5-15, 115 Right of Ztiac Improvements 5 Boulevard Retaining Walls 20,000 6 ILN Street Improvements 2,-X46,000 i~0,000 100,000 TOTAL RIGHT OF WAY IMPROVEMENT 3,316,000 Public Facilities 7 Computer upgrade 100,000 8 Records :Management 20,000 9 Central Telephone System 100,000 10 OPTECH III Voting System 60,000 11 well ~1 Replacement/Repair 20,000 12 Loop Dead Ends 30,000 13 Replace High Service Pumps 20,000 14 Salt Storage Cover 6,000 15 City Hall Carpet 30,000 16 City Hall Air Condition Compressors 10,000 17 Energy Improvements 10,00.0 TOTAL PUBLIC FACILITIES 406,000 GRAND TOTAL 4,267,115 Recreation/Open Space Development 5=X5,115 Right of jtiai- Improvements 3,316,000 Public Facilities 106,000 GRAND TOTAL 1,267,115 i) Municipal State Aid 770,000 R) Special Revenue/Revenue Sh 681,115 S) State Grants 300,000 T) Tax Increment Financing 2,416,000 U) User Fees 70,000 AI T l S R R R R U U U R R R R GRAND TOTAL -I,267,115 l Forestr,y->CIP:Forestry Today's Date: February 5, 198 PROJECT SUM~~IARI' FORM 1988 C_~PITAL BUDGET :~iv'D CAPITAL I~IPROt`EMENT PROGRArM 1989-93 CITY OF RICHFIELD, MINNESOTA 1. Brief, descriptive name of project: Forestry 2. On a separate sheet, provide detail explaining the location, background, purpose and other informa%ion about the project. Attach map or drawing, if app]_icable. 3. Is this project a continuation of an existing project.? Yes If so, what is the city project number? C;'it~> Project 1330 4. Do other projects have any relationship to this project? Yes If so, Gchat is the relationship'' Park development projects 5. In what rear{s) and with what annual cost is this project proposed to be scheduled? CIB 1988 $ 32,615 CIP 1991 ~ CIP 1989 $ CIP 1992 ~ CIP 1990 $ CIP 1993 6. Based on the following estimates, the cost of this project for ~-ear i988 (as detailed in question taco) is: Planning and Engineering:1,000 In-House: $1,000 Contract: acquisition of Property: Construction/Installation:15,000 In-House: $11,000 planting, $~k,000 adm. Contract(s): Furnishings and Equipment:10,000 Contract(s): C~uotation(s): Trees Construction Observation:500 In-House: Inspector Contract: Miscellaneous Expenses:6,115 Rents and Leases: $3,000 Advertisement: 50 Office Supplies: 10 Copying: 10 Postage: ~5 Mi.]_eage: Meetings: ursery Stock/Labor: 3,000 ContingencS-: TOTAL ESTIMATED COST FOR PHASE _, 1988 $ 32,615 Use additional sheets as necessary to provide a cost estimate, as outlined above, for each and every phase or year of the project. Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 2 - Forestr3• 7. trhich, if any, operating budget(s) need to be adjusted annually as a result of this project completion? None How much do you estimate the operating budget(s) will be affected (please note reduced expenditures in parenthesis)? First year personal services: $ First year other services and charges: $ First year commodities/supplies: $ First year debt services: $ Additional capital outlay: $ First year transfers: $ First year other (i.e., depreciation, etc.) ~ On a separate sheet of paper, provide a breakdo~,~n of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.) 8. what, if an3-, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above}? X19,500 9. What, if any, is the first year estimated operating income, plus or minus, resulting from this project? None 10. Tdhat is the proposed source(s) of funding for this project? L'ser Fees Special Revenue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable} Federal (specify) State (specify) Counts- (specify) Other (specify) Federal Aid Urban System: Municipal State Aid: Tax Increment Financing: Other (please specify>): TOTAL ESTIMATED FUkTDING FOR PROJECT 32,615 32,615 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? I'es If so, indicate the page(s) of the Comp Plan that apply: 32 12. t+lhich department is responsible for the coordination of this project? Communi.t,y Services Which division of that department is responsible? Admin. r Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 3 - Forestry 2. This ongoing project is to provide replacement on boulevards and in parks of trees lost to storm damage, Dutch Elm disease and other diseases. Costs are estimated on a need to replace approximately 150 trees per year. Dutch Elm disease is still the primary reason for tree loss. Our planting program is closely related to our efforts to keep elm loss of public trees under control with a strict sanitation program. With over 3,000 elms still remaining on public property, it appears this program should continue for several years. CIP:Land Today's Date: February 5, 1987 PROJECT SUMhIARY FORM 1988 CAPITAL BUDGET AND CAPITAL IMPROVEMENT PROGRAM 1989-93 CITI' OF RICHFIELD, MINNESOTA 1. Brief, descriptive name of project: Park Land Acquisition 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3. Is this project a continuation of an existing project? Yes If so, what is the city project number? City Project 758 4. Do other projects have a relationship to this project? Yes If so, what is the relationship? See attached 5. In what year(s) and with what annual cost is this project proposed to be scheduled? CIB 1988 $ 30,000 CIP 1991 CIP 1989 $ CIP 1992 CIP 1990 $ CIP 1993 6. Based on the following estimates, the cost of this project for phase # year 1988 (as detailed in question two) is: Planning and Engineering: In-House: Contract: Acquisition of Property: Construction/Installation: In-House: Contract(s): Furnishings and Equipment: Contract(s): Quotation(s): Construction Observation: In-House: Contract: Miscellaneous Expenses: Rents and Leases: Advertisement: Office Supplies: Copying: Postage: Mileage: Meetings: Other (please specify): Contingency: TOTAL ESTIMATED COST FOR PHASE _, 1988 $ 0 See attached for explanation of why no expenditures are estimated for the funding requested in 1988. Project Summary Form ~ Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 2 - Park Land Acquisition 7. Which, if any, operating budget(s) need to be adjusted annually as a result of this project completion? None How much do you estimate the operating budget(s) will be affected (please note reduced expenditures in parenthesis)? First year personal services: $ First year other services and charges: $ First year commodities/supplies: $ First year debt services: $ Additional capital outlay: $ First year transfers: $ First year other (i.e., depreciation, etc.} $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.) 8. What, if any, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? None 9. What, if any, is the first year estimated operating income, plus or minus, resulting from this project?See attached 10. What is the proposed source(s) of funding for this project? User Fees: Special Revenue/Revenue Sharing:30,000 Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable): Federal (specify) State (specify) County (specify). Other (specify) Federal Aid Urban System: Municipal State Aid: Tax Increment Financing: Other (please specify): TOTAL ESTIMATED FUNDING FOR PROJECT 30,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? Yes If so, indicate the pages} of the Comp Plan that apply: Community Facilities Section, pages 133-157 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible? Admin. Project Summary Farm Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 3 - Park Land Acquisition 2. Physical Description: The City of Richfield can be considered fully developed which means there is no space of an,y major size available for park land. There are, however, certain parcels in the city, adjacent to existing park land, which are desirable for park purposes. These parcels, typically with a single family dwelling and related areas and structures, are often free standing or somewhat isolated from other residential properties. It has long been the desire of the City of Richfield to acquire properties on the east side of Portland Avenue adjacent to Legion Lake Park. All but one of the residences north of the American Legion and south of the Water Plant were acquired as of year end 1986. The acquisition took place when a willing seller contacted the City who had previously identified itself as a willing buyer. As a result of several acquisitions in a short period of time, the current city project offset a deficit with the 1987 funding. Beginning in 1988, continued funding will allow possible purchase from other willing sellers. Location: Examples of parcels desirable for park purposes include, but are not limited to, properties on the west side of Irving Avenue adjacent to rlonroe Park and remaining properties on the east side of Portland Avenue adjacent to Legion Lake Park. Purpose: The purpose of acquiring such parcels is to provide a more clear and clean definition of park space, to avoid conflict between public and private property and to continue to implement the goal of making desirable land available for park and recreation purposes. Need: Funding for acquisition of park land allows the City to take advantage of land purchase opportunities. This has been evidenced by the recent purchases adjacent to Legion Lake Park. It is not the intent of the City to practice eminent domain but rather to be prepared for a situation in which there is a willing seller to work with the City. With the level of funding suggested by staff, it takes several years to secure sufficient resources to purchase a single property. It is difficult to predict when such properties may become available. 4. Should property be acquired for park purposes at a time appropriate for combining such parcel(s) into a design for park redevelopment, such will be done. If the acquisition is at a time not easily coordinated with park redevelopment, such property shall be incorporated into the park as efficiently as possible within operating budget limitations. Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 4 - Park Land Acquisition 6. As explained above, park land acquisition, City Project 758, has just offset a deficit as of year end 1987. It was necessary to balance this deficit first with subsequestn allocations used to build the fund to a point where funding is available for future purchases. In the event a high priority property should become available before the project has sufficient funding available, it is recommended advantage of the situation, whereby a willing seller has contacted the City, be taken and the project again be allowed to operate at a deficit. 9. When residential property is acquired for park purposes, such property will be removed from the tax rolls. The resulting loss of income to the City will vary with each property. However, the City does realize some income from the sale for removal of dwellings and, on occasion, there is some income from rental of the property until it can be removed from the site. CIP:Legion Today's Date: February 5, 1987 PROJECT SUMMARY FORM 1988 CAPITAL BUDGET AND CAPITAL IMPROVEMENT PROGRAM 1989-93 CITY OF RICHFIELD, MINNESOTA 1. Brief, descriptive name of project: Legion Lake Park 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3. Is this project a continuation of an existing project? Yes If so, what is the city project number? City Pro,iect 802 4. Do other projects have any relationship to this project? Yes If so, what is the relationship? See attached 5. In what year(s) and with what annual cost is this project proposed to be scheduled? CIB 1988 $ 470,000 CIP 1991 $ CIP 1989 $ CIP 1992 $ CIP 1990 $ CIP 1993 $ 6. Based on the following estimates, the cost of this project for phase ~3, 5-ear 1988 (as detailed in question tw o) is: Planning and Engineering:20,000 In-House: $ 6,000 Contract: 14,000 Acquisition of Property: Construction/Installation:400,000 In-House: $ 30,000 Contract(s}; 370,000 Furnishings and Equipment: Contract(s): Quotation(s): Construction Observation:18,000 In-House: $ 8,000 Contract: 10,000 Miscellaneous Expenses:3,000 Rents and Leases: $2,500 Advertisement: 300 Office Supplies: 50 Copying: 100 Postage: 50 Mileage: Meetings: Other (please specify): Contingency:29,000 TOTAL ESTIMATED COST FOR PHASE #3, 1988 $ 470,000 Use additional sheets as necessary to provide a cost estimate, as outlined above, for each and every phase or year of the project. Project Summary Form ~ Today's Date: FebruarST 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 2 - Legion Lake Park 7. Which, if any, operating budget(s) need to be adjusted annually as a result of this project completion? None How much do you estimate the operating budgets} will be affected (please note reduced expenditures in parenthesis)? First year personal services: $ First year other services and charges: $ First year commodities/supplies: $ First year debt services: $ Additional capital outlay: $ First ,year transfers: $ First year other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.) 8. What, if any, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? $4G,~00 9. What, if any, is the first year estimated operating income, plus or minus, resulting from this project? None 10. What is the proposed source(s) of funding for this project? User Fees: Special Revenue/Revenue Sharing: Bonds (circle those applicable}: General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable): Federal (specify) State (specify) LCMR County (specify) Other (specify) Federal Aid Urban System: Municipal State Aid: Tax Increment Financing: Other (please specify): TOTAL ESTIMATED FUNDING FOR PROJECT 270,000 200,000 470,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? Yes If so, indicate the page(s) of the Comp Plan that apply: Community Facilities Section pages 133-157 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible? Admin. Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 3 - Legion Lake Park 2. Physical Description: Legion Lake Park is approximately 108 acres in size with a required storm water holding capacity of at least 62 acre feet. The site is described as a "community park". Currently located at the site is the city's water treatment plant and appurtenant facilities; the ice arena; the swimming pool; three well houses; four wells; a storage building used by the arena and pool; as asphalt parking lot, used by the arena, pool and as an ^1TC park and ride site; the archery range; a number of trees; some mown turf area and some natural area. There is a city concrete sidewalk along 66th Street, a county road. Redevelopment work to date includes muck excavation; preparatory work for the path system, a second parking lot and the amphitheater site and some landscaping consisting of additional trees planted along 66th Street, earth mounding or berming and some grading and grass seeding. All fill materials used for the path system, parking lot, amphitheater and berms has been obtained at no direct cost to the city. The master plan for the Park was adopted by the city council in 1985 following city wide meetings and the recommendation of the Community Services Advisory Commission. Proposed park facilities include, but are not limited to, a large group picnic area, a family picnic area, walking paths, pathways for bic5-cles, floating and spanning bridges around, through and over open water and marsh areas, a Large area play structure, a small area play structure, expanded parking, an amphitheater, a floating stage, swimming pool enhancements, a community center, an esplanade, fountains and landscaping. Proposed "construction" activity for 1988 includes parking/drive surface, curb and gutter and walkways including 8' asphalt pedestrian/bicycle, 42" wide boardwalk and bridges. Location: Legion Lake Park is bounded by Crosstown 62 on the north and 66th Street on the south. Portland Avenue is on the west and the city has recently purchased all but one of the homes north of .the American Legion Post 435 and south of the water treatment plant. There are also some commercial properties between the park and Portland Avenue including the American Legion, a funeral chapel and a gas service station. To the east of the park are a number of single family residences although the park boundary will border on 11th Avenue at some locations. Purpose: Legion Lake Park is the only community park in the city. It is to serve all ages. The residents of the city felt this site should be the "flagship" of the Richfield park system and should be a "legacy to the future". As a community park, Legion Lake would be available for major city functions such as the Fourth of July celebrations, including a fireworks display and musical presentations, which are currently held at this site. Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 4 - Legion Lake Park Need: Prior to discussion in 1985, the resulting master park plan and the beginning of construction, Legion Lake Park was essentially undeveloped. This site is to be the major park in the community. To physicall3° create the master park concept plan, it is necessary funding of the project continue. Every effort is being made to secure funding from all sources including grant programs, foundations and donations as well as the city's special revenue fund. 4. Coordination of the park design and construction was and is in concert with storm sewer improvements related to Norby's Pond and Wilson's Pond, with improvements at the water treatment plant such as lime sludge dewatering and with park land acquisition. An Environmental Assessment Worksheet was prepared and no adverse effects were identified with this park project. mVVV A,SS DN AtiHH1 XERXESAVE. F,ir=--.-- ~_ WASHBURN ~"sQ ~ ~~_~_~ VINCENTI ~~~~~ i UPTONji~~~~ ~~ I: , THOMASI~~~~i-J~i r SHERIDAN ~ I~~-'~~ IIu RUSSELL1 ~~ !~ QUEENIil,,~~ II !' PENNAVE. ~~~~ J~~~ i DELVER u. ~~---~LIre, ~I NEWTONIII,- Ju~~ II MORGAN ~!`~~ LRGAN ~ ~~u~j1 KNO% ~LLJ ~' 'JAMES \ ~ I'- I~ r IRVING ~~~~~ IJ HUMBOLOTt -- GIRARD / ~ I~ i ~'il-~^ FREMONT % `~ L EMERSON ,!I~~-~I~~~.~ _ DUPONT ~IjliI^ ~L I>_J~ ~uL COLFAX ~~ jj BRYANT I ~i~jIl~~~~r ALDRICH I LYNDALEAVE. ~~ r ~' GARFIELD ~j.~°~ HARRIETI~ ~~- GRANDII ~~ PLEASANT ~= ~-=~-1--1, -.T.-._i _ ~~~~.-.. PILLSBURYIII --J~ II~~~L WENTWORTHI L-~' BLAISDELL ~~~~~Or NICOLLETAVE. ~" ~ r- C Ist ~/~~!~-'r~ STEVENS ! I~~L 2nd L~~J~L 3rd `-'~~ CLINTON I, ~,'~~ F,' ~~I 4th ~~,\ ~'- 5th ~'1\I~ ^~~ PORTLANDAVE. ^" tu~L~L-L 1I~~C OAKLANDI ~ PARK I,IIj'LJL~~ dl -ter COLUMBUSil~ ~~~- CHICAGO ~I~~ J!-J~-t~ I ~1 ELUOTI~~I ~L-Jr IOih !~I ~~~DAL IIIhI~~I 12th II~~J~~r 13ih ~ I~ ~~JrL 14th ~ I~r I ~~~_` ISihII~, (~'I!I~,~C'L~L BLOOMINGTON ~'I~~(~; i~ 16thhjI! I ~`'- i~ h_.-.~~~ 17thI ~~ ij ~~,I IBth ~~_- -Jr CEDARAVE. ~ -_~_ _ _ ~-_ I ` LONGFELLOW -----`---~R_ Am ~ sz m ZN -N1ti ~ w m.. Zn~ x~ O 'TJ ~ C ~. O Z ~ '*1 r g ;d Z r ~ ~ S (W/~ ~ NIy :-NI -NI Hti 0 N y O WNz NF K Wit;, XERXESAVE IWASHBURN VINCENT i, UPTON ITHOMAS I SHERIDAN iRUSSELL QUEEN PENNAVE. DELVER I, NEWTON iiJ, jMORGAN LOGAN IjKNOX fl iJAMES IRVIN6 I., L~: HUMBOLDT yi.lijGIRARD FREMONT i~5EMERSON DUPONT I,I~ COLFAX 1;I BRYANT r I!IALDRICH i!~ CLYNDALEAVE II' I I! GARFIELD I~' iHARRIET iiGRANDIr'i~' PLEASANT IPILLSBURYI~ WENTWORTH II IlBLAISDELLC~ NICOLLETAVE. Ist II, STEVENS 1ijJ2nd 3rd CLINTON j4th Sth h~ PORTLANDAVE. a~ OAKLAND PARK COLUMBUS ICHICAGO iELLIOT 10Th iitlh I12ih l,~ I 13fh 14th t ISih BLDOMtNGTON 16th 17th IIBih CEDARAVE. LONGFELLOYI 19th 20th 21st 22nd STANDISN 23rd e y AWN -tvO_ Obm ~ ~ u ~ 7OorvvS > > 77jS NNNNNNNNN ti ~ yti ~ titiH -1 ~ -1 Arena>CIP:Compressors Today-'s Date: February o, 1987 PROJECT SU4I~IARY FORM 1988 CAPITAL BUDGET AND CAPITAL IMPROVE^IENT PROGRAM 1989-93 CITY OF RICHFIELD, riINNESOTA 1. Brief, descriptive name of project: Ice Arena Compressors 2.. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3.No 4. Do other projects have any relationship to this project? No If so, what is the relationship? 5. In whaty-ear(s) and with what annual cost is this project proposed to be scheduled? CIB 1988 $ 12,000 CIP 1991 CIP 1989 $ CIP 1992 CIP 1990 $ CIP 1993 6. Based on the following estimates, the cost of this project for phase ;:One, year 1988 (as detailed in que stion two) is: Planning and Engineering: In-House: Contract: Acquisition of Property: Construction/Installation:12,000 In-House: $ 1,000 Contract(s): 11,000 Furnishings and Equipment: Contract(s): Quotation(s): Construction Observation: In-House: Contract: Miscellaneous Expenses: Rents and Leases: Advertisement: Office Supplies: Copying: Postage: Mileage: Meetings: Other {please specify): Contingency: TOTAL ESTIMATED COST FOR PHASE tt1, 1988 $ 12,000 Use additional sheets as necessar3- to provide a cost estimate, as outlined above, for each and every phase or year of the project. Is this project a continuation of an existing project? If so, what is the city project number? Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 Cit3- of Richfield, :Minnesota Page 2 - Arena Compressors 7. Which, if any, operating budget(s) need to be adjusted annually- as a result of this project completion? Ice Arena How much do you estimate the operating budget(s) will be affected (please note reduced expenditures in parenthesis)? First year personal services: $ First 5-ear other services and charges: $ (1,000) First year commodities/supplies: $ First year debt services: $ Additional capital outlay: $ First ,year transfers: $ First year other (i.e., depreciation, etc.} $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply-/capital outlay items needed, etc.) Utility Savings 8. What, if any, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? $1,000 9. What, if any, is the first year estimated operating income, plus or minus, resulting from this project? None 10. What is the proposed source(s) of funding for this project? User Fees: Special Revenue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable): Federal (specify) State (specify) County (specify) Other (specify} Federal Aid Urban System: Municipal State Aid: Tax Increment Financing: Other (please specify): TOTAL ESTIr1ATED FUNDING FOR PROJECT 12,000 12,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? Yes If so, indicate the pages} of the Comp Plan that apply: 153 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible? Ice Arena Streets>CIP:Walls Today's Date: February 5, 1987 PROJECT SUMMARY FORM 1988 CAPITAL BUDGET AND CAPITAL IMPROVEMENT PROGRAM 1989-93 CITY OF RICHFIELD, MINNESOTA 1. Brief, descriptive name of project:Boulevard Retaining ~v'alls 2.. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3. Is this project a continuation of an existing project? No If so, what is the city project number? 4. Do other projects have any relationship to th is project? Yes If so, what is the relationship? See 1991 and 1993 CIP .years 5. In what year(s) and with what annual cost is this project proposed to be scheduled? CIB 1988 $ 20,000 CIP 1991 $ CIP 1989 $ CIP 1992 $ CIP 1990 $ CIP 1993 $ 6. Based on the following estimates, the cost of this project for phase ;rl, year 1988 (as detailed in quest ion two) is: Planning and Engineering:1,000 In-House: $1,000 Contract: Acquisition of Property: Construction/Installation:17,000 In-House: Contract(s): $17,000 Furnishings and Equipment: Contract(s): Quotation(s): Construction Observation:1,000 In-House: $1,000 Contract: Miscellaneous Expenses:100_ Rents and Leases: Advertisement: $75 Office Supplies: 10 Copying: 10 Postage: 5 Mileage: Meetings: Other (please specify): Contingency:900 TOTAL ESTIMATED COST FOR PHASE #1, 1988 $ 20,000 Use additional sheets as necessary to provide a cost estimate, as outlined above, for each and every phase or year of the project. Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City- of Richfield, Minnesota Page 2 - Boulevard Retaining Walls 7. Which, if any, operating budget(s) need to be adjusted annuall3> as a result of this project completion? None How much do you estimate the operating budget(s) will be affected (please note reduced expenditures in parenthesis)? First year personal services: $ First year other services and charges: $ First year commodities/supplies: $ First 3Tear debt services: $ Additional capital outlay: $ First year transfers: $ First year other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.) 8. What, if any, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? $2,000 9. What, if any, is the first year estimated operating income, plus or minus, resulting from this project? None 10. What is the proposed source(s) of funding for this project? User Fees: Special Revenue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable}: Federal (specify) State (specify} County (specify) Other (specify) Federal Aid Urban System: Municipal State Aid: Tax Increment Financing: Other (please specify): 20,000 TOTAL ESTIMATED FUNDI~v'G FOR PROJECT $ 20,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? Yes If so, indicate the page(s) of the Comp Plan that apply: 158 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible? Street Mtc Engineering>CIP:ILN Today's Date: February 5, 1987 PROJECT SUIviMARI' FORM 1988 CAPITAL BUDGET AND CAPITAL IMPROVEIvIENT PROGRAri 1989-93 CITY OF RICHFIELD, MINNESOTA 1. Brief, descriptive name of project: ILN Street Improvements 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3. Is this project a continuation of an existing project?_No_ If so, what is the city project number? 4. Do other projects have any relationship to this project? I'es If so, what is the relationship? See attached 5. In what year(s) and with what annual cost is this project proposed to be scheduled? CIB 1988 $ 3,296,000 CIP 1991 $ CIP 1989 $ CIP 1992 $ CIP 1990 $ CIP 1993 $ 6. Based on the following estimates, the cost of this project for year 1988 (as detailed in question two) is: Planning and Engineering:400,000 In-House: $200,000 Contract: 200,000 Acquisition of Property: Construction/Installation:2,896,000 In-House: Contract(s): $2,896,000 Furnishings and Equipment: Contract(s): Quotation(s): Construction Observation: In-House: Contract: Miscellaneous Expenses: Rents and Leases: Advertisement: Office Supplies: Copying: Postage: Mileage: Meetings: Other (please specify): Contingency: TOTAL ESTIMATED COST FOR PHASE 1988 $ 3,296,000 Use additional sheets as necessary to provide a cost estimate, as outlined above, for each and every phase or year of the project. Project Summary Form 'Podai-'s Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, `linnesota Page 2 - ILN Street Improvements 7. Which, if any-, operating budget(s) need to be adjusted annually as a result of project completion? See Attached How much do you estimate the operating budget(s) will be affected (please note reduced expenditures in parenthesis}? First year personal services: $ First year other services and charges: $ First year commodities/supplies: $ First year debt services: $ Additional capital outlay: $ First year transfers: $ First year other (i.e., depreciation, etc.} $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, suppl3-/capital outlay items needed, etc.) 8. What, if any, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above}?200,000 9. What, if any, is the first rear estimated operating income, plus or minus, resulting from this project? See Attached 10. What is the proposed source(s) of funding for this project? User Fees: Special Revenue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable): Federal (specify) State ( specify) Miv'DoT County (specify) Other (specify) Federal Aid Urban System: Municipal State Aid: Tax Increment Financing: Other (please specify): TOTAL ESTIMATED FUNDING FOR PROJECT 100,000 750,000 2,446,000 3,296,000 11. Is this project in conformance caith the Comprehensive Plan which has been adopted by the Planning Commission? No* If so, indicate the page(s) of the Comp Plan that apply: Revision pending 12. ~rThich department is responsible for the coordination of this project? Community Services Which division of that department is responsible?Engineering Project SummarS- Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, rlinnesota Page 3 - ILN Street Improvements 2. This project is just a portion of the total proposal for development in the area called the ILN. "ILN" stands for Interstate/L3-ndale/Nicollet". The attached information includes part of the ILN plan as it relates to this portion of the proposed project. The 1987 Capital Budget included work for ILN street improvements along 77th Street east of L,yndale Avenue. The proposed 1988 ILN Street Improvement project would be along 77th Street c.*est of L,yndale Avenue and 78th Street connection. It should be noted that any acquisition of property or right of way is not included in the proposed funding for the 1988 ILN Street Improvement project. Although it may be necessary to make some expenditures for right of way purposes, funding would be through another segment of the total ILN Redevelopment Project. 4. All ILN private and public improvements are related. Check with the Richfield Community Development Department for information about the ILN Redevelopment and Tax Increment and Financing Plan which will outline the relationships. 7. It is anticipated that once the ILN Redevelopment is well under~,Tay, a special assessment district will be created for maintenance of the area and its public amenities. This approach is used in the LHN (Lyndale/Hub/Nicollet) area and appears to be working quite well. 9. Once a special assessment district has been created for maintenance purposes, all revenues collected will equal the amount charged by the city for maintenance services. C STAT~~'.E!VI' OF GOALS & OBJEC'T'IVES The proposed goals and objectives are intended to serve as a basis for guiding tt~ development, redevelopment, and renovation.. of the proposed project area. They were derived from an analysi$ of the area and are a response to both the problems and opportunities which were identified. This proposed Redevelopment Plan envisions that development, redevelopment, and renovation by both the private and public sectors will proceed in stages. The goals and objectives are the recommendations for implementing the proposed Redevelopment Plan. The first phase of the Redevelopment Plan, Phase I, will serve as a reference for formulating detailed comprehensive plans for future phases, i.e., Phase II, Phase III, etc. The goals and objectives are set forth in four sections which correspond to development sub areas of the project. The first section addresses the entire project area. i PROJECT AREA The goals and objectives proposed for the entire project are to: " ` Create an economic environment which fosters -the growth of healthy office, ` retail and service business development at appropriate locations. Facilitate the development or redevelopment of land in parcels of a sizesuitableforcontemporaryoffice, retail and service business needs. Utilize vacant or under-developed land more intensively. 10 i~ Eliminate unsightly and blighting elements such as exposed trash storageareas, overhead utility lines, poorly maintained and excessively largebillboardsorsigns, and deteriorated structures. Make a reasonable effort to provide for retaining as many existing businesses as possible. Screen outdoor storage and loading areas, when practical. Establish a central area or place to serve as a focal point. Help create a sense of unity through use of a special feature or theme. Utilize landscaping and natural amenities to soften and enrich theenvironment. Prepare guidelines and/or ordinance provisions for the issuance of constructionpermitswhichwouldhelp .assure that proposed development would be i nconformancewiththeredevelopmentplanactivitiesandwouldrealizethefullpotentialoftheuniquelocationofthisareaintermsofdevelopmentintensityemploymentopportunities, economic growth, and tax base. 13 Pro.jests>603-=1851:CIP/Computer TodaS°'s Date: February 5, 1987 PROJECT SUMMARY FORM 1988 CAPITAL BUDGET A:vD CAPITAL IMPROVEMEi~T PR.OGRAIrI 1989-93 CITY OF RICHFIELD, "III~tiESOTA 1. Brief, descriptive name of project: Computer Upgrade 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or dracing, if applicable. 3. Is this project a continuation of an existing project? Yes If so, what is the citST project number? See Attached 4. Do other projects have any relationship to this project? No If so, cahat is the relationship? 9. In what years} and with what annual cost is this project proposed to be scheduled? CIB 1988 5 1C0,000 CIP 1991 a CIP 1989 S CIP 1992 $ CIP 1990 $ CIP 1993 $ 6. Based on the following estimates, the cost of this project for phase ~3, year 1988 (as detailed in question two) is: Planning and Engineering: In-douse: Contract: Acquisition of Property-: Construction/Installation:10,000 In-House: $10,000 Contract(s): Furnishings and Equipment:90,000 Contract(s): $90,000 Quotation{s): Construction Observation: In-House: Contract: Miscellaneous Expenses: Rents and Leases: Advertisement: Office Supplies: Copying: Postage: Mileage: Meetings: Other (please specify): Contingency: TOTAL ESTI^~IATED COST FOR PH.aSE #3, 1988 $ 100,000 Use additional sheets as necessary to pro~ride a. cost estimate, as outlined above, for each and every phase or year of the project. Project Summary Form Toda~T's Date: Februar~r ~, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 Cit~r of Richfield, `iinnesota Page 2 - Computer l.-Y~grade r tYhich, if an~~, operating budget(s) need to be adjusted annually as a result of this project'? See attached i-lo~. much do ~-ou estimate the operating budget (s ) c:ill be affected (please note reduced etpenditures in parenthesis)? First ~~ear persor.a.1 services: First rear other services and charges: ~ First ;ear commodities/supplies: ~ First rear debt services: S Additional capital outlay: S First rear transfers: ~ First year ether (i.e., depreciation, etc.) ~ On a separate sheet cf paper, provide a breakdo~.n of any- items noted above; i.e., description of additional personnel to be hired, supply-/capital outlay- items needed, etc.) 8. t4hat, if any, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? X10,000 9. what, if ani-, is the first year estimated operating income, plus or minus, resulting from this project? None 10. What is the proposed. source(s) of fund.ir.g for this project? User Fees: Special Rey-enuejRevenue Sharing:100,000 Bcnds (circle those applicablej: General Obligation/Revenue Special assessment Cther (specify) Grants (circle those applicab.le):5 Federal (specify-) State (specify} Count:- (specify-} Other (specify) Federal aid urban System:S Municipal State .yid:S Tam Increment Financing:S Other (please sZ~ecify) :S TOTAL ESTI`IaTED FL'tiDI~G FOR PRO JECT ~ lOC,000 1i. Is this project in conformance with the Comprehensive Plan hich has been adopted b5- the Planning Commission? ~/A If so, indicate the page(s) of the Comp Plan that apply-: 12. ~~hich department is responsible for the coordination of this project? Administrative Services Which division is responsible? Data Processing Project Summary Form today's Dace: February- ~, 198i 1988 C"apitai Budget and Capital Improvement Program 1989/93 City- of Richfie]_d, Minnesota Pa~'e 3 - Computer >vpgrade 2. In i~~86 the City purchased a ne;. Burrcu:_l~s comp~.atar -,.~sterl. That purchase was made c.-ith a minimum of hardware and software to enable the ~:~it~~ to ~row~ into the s;-stem gradually. A srcoi:d phase, for purchase of hardware, is scheduled for 198, and a third phase alas been targeted for 1988. The third and final phase of tale major upgrades to the sS-stem ccill include enhancements such a property mapping and severa.t additional terminals/::orkstations. These additions are necessary' if the City is to fully utilise the system. Each rear there are .mproti-ements t.o the system which become available to system users. It would be reasonable t.o assume tY'ie City ;:iil ~=x~:mine these enhancements and seek to acquire those cchic}~ ;:il_ t;ro~-ide benefit. t.o staff for a 1°easonable cost. This continual ;_ipgrading' of tl~e system can }zelp to prevent the Cit,y- from finding itself in the sane position as in 1987, operating on an antiquated computer system which was impossible to update. However, before the City can begin to fully utilize the capabilities of the Burrcughs s~-stem and enhancements to the system as they become available, it is essential to complete the initial hardware ar.d software installation of the system so that sufficient numbers of City staff may use the system on an efficient day to da,y basis. Thus, the third phase described above is e~.tremel3• important,. Unlike other internal funds, such as the Central Garage, cahere depreciation of equipment has been sufficient for replacement with new equipment, data processing does not have sufficient funding for the initial purchase of all phases of the upgraded computer system. The proposed project would provide for purchase of the last stage of the system through the Special Revenue fund. 3. The first two phases of the Burroughs computer system purchase ;.ere funded through the data processing internal fund. Because it is an internal fund, it does not use a city project number as is used by many other projects including those of an enterprise fund. Rather, it is simply a capital outlay item. 7. _~s i:~dicated above, system users pay a rental fee for the city's computer systen. Cost to each user depends on the equipment. ur.d programs used. as the system expands, it is pcssible there will be new* users and current users ma,y- experience increased costs. Frojects>101-~052:CIP/Records Today's Date: February 5, 1987 PROJECT SUtiht9Rh FORM 1988 CAPITAL BUDGET AND CAPITAL I4IPROVE~IENT PROGR.A~I 1989-93 CIT4 OF RICHFIELD, :MINNESOTA 1. Brief, descripti~-e name of pr.o.ject: Records ^Ianagement 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project, Attach map or drawing, if applicable. 3. Is this project a continuation of an existing project? No If so, what is the city project number? 4.Do other projects have any relationship to this project? No If so, what is the relationship? 5. In what year(s) and with what annual cost is this project proposed to be scheduled? CIB 1988 ~ 20,000 CIP 199]. CIP 1989 ~ CIP 1992 CIP 1990 ~ CIP 1993 6. Based on the following estimates, the cost of this project for phase ~ year (as detailed in question two) is: Planning and Engineering:S In-Mouse: Contract: Acquisition of Property: Construction/Installation:7,000 In-House: $2,000 Contract(s): 5,000 Furnishings and Equipment:13,000 Contract(s): quotation(s): $13,000 Construction Observation: In-House: Contract: Miscellaneous Expenses: Rents and Leases: Adi-ert i sement Office Supplies: Copying: Postage: Mileage: Meetings Other (please specify): Contingenc,y-: TOTAL ESTIMATED COST FOR PHASE , 1988 $ 20,000 Use additional sheets as necessary- to provide a cost estimate, as outlined above, for each and every phase or year of the project. Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 2 - Records Management. 7. Which, if any, operating budget(s) need to be adjusted annually as a result of this project? See Attached How much do you estimate the operating budgetts) will be affected {please note reduced expenditures in parenthesis)? First year personal services: $ First year other services and charges: $ First year commodities/supplies: $ First year debt services: $ Additional capital outlay: $ First year transfers: ~ First year other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, suppler/capital outlay items needed, etc.) 8. What, if any, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? $2,000 9. What, if any, is the first year estimated operating income, plus or minus, resulting from this project? ,L'one 10. What is the proposed source(s) of funding for this project? User Fees: Special Revenue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable): Federal ( specifyy-) State (specify) County- ( specifSr) Other (specify) Federal Aid Urban System: Municipal State Aid: Tax Increment Financing: Other (please specify-}: TOTAL ESTI`1?,TED FUNDI:vG FOR PROJECT 20,000 20,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? y/A If so, indicate the page(s) of the Comp Plan that apply: 12. Which department is responsible for the coordination of this project? Administrative Services Which division of that department is responsible? City Clerk Project Summary Form Today's Date: February 5, 198i 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 3 - Records Management 2. The City is required by law to retain records for specified periods of time depending on the categoryT of the record. Certain records must, be kept permanently. The present facility is extremely overcrowded and difficult to organize because of the lack of proper shelving, storage containers and the volume of the records. Additionally-, there is also a need for standardization and indexing of the records. The City- continues to create new records at an increasing rate and there is a continuing reed to be able to access records which are stored. With the current facilities, it is exceedingly difficult to provide records management services to City staff and the public. Major improvements in the records storage facility are needed. A two pronged attack of this problem is necessaryr. First, an upgrading of the records storage room is necessary including the purchase of proper shelving and containers. The second aspect in addressing this problem involves the indexing, categorizing and microfilming of inactive records which are required to be kept on a permanent basis. 'Microfilming on a periodic basis for active and inactive records should then be done regularly. The latter responsibility- could either be done in-house with the purchase of microfilming equipment or by- contracting out to a firm specializing in the field. i. If microfilming were to be contracted, the various divisions and departments would be responsible for the costs incurred. Projects:101-~022:CIPiTelephone Tcday's Date: February 7, 1987 PROJECT SU`l:~i_1R1" FOR`'I 1988 CAPITAL BUDGET AtiD CAPIT.~L I`IPRO~'Et'IE~iT PROGRAM 1989-93 CITI' OF RI~:HFIELD, ~IIT~tiESOT:~ 1. Brief, descriptive name of project: Central `T'elephone System 2. On a sepa.ra.te sheet, ,~rnt,-ide det~_~il e::plaining the location, background, purpose and other information about the project. Attach map or drac~ing, if applicable. 3. Is this project a continuation of an e;~isting project? No If so, c.;hat is the city project number? I. Do other projects have any relationship to this project? No If so, ghat is the relationship? 5. In what year.(s) an d.c,ith what annual cost is this project proposed to be scheduled.? CIB 1988 S 100,000 CIP 1991 ~ CIP 1989 ~ CIP 1992 S CIP 1990 S CI}? 1993 $ 6. Based on the following estimates, the cost of this project for year 1988 (as detailed in question two) is: Planning and Engiaeering: In-House Contract: Acquisition of Propertj-: Construction/Installation:10,000 In-House: 510,000 Contract(s): Furnishings and Equipment:5 90,000 Contract(s): 590,000 Quotation(s): Construction Obser~-ation: In-House: Contract: Miscellaneous Expenses: Rents and Leases: Advertisement: Office Supplies: Copying: Postage: Mileage: Meetings: Other (please specify): Contingency-: TOTAL ESTI`~1ATED COST FOR PHASE 1988 $ 100,000 Use additional sheets as necessary to provide a cost estimate, as outlined abo~-e, for each and every phase or year of the project. Project Summary Form TodaiT's Date: February 5, 1981 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 2 - Central Telephone System r Which, if any, operating budget(s) need to be adjusted annuall- as a result of this project completion? Gov. Bld_~'s Hot: much do you estimate the operatins bud~~et(s) will be affected (please note reduced expenditures in parenthesisl? First year personal services: $ First year other services and charges: $ First year commodities/supplies: ~ First year debt services: ~ Additional capital outlay-: First year transfers: S First Trear other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.) See Attached 8. 47hat, if any, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? S10,OC0 9. What, if and-, is the first year estimated operating income, plus or minus, resulting from this project? :vone 10. What is the proposed source(s) of funding for this project? Lser Fees: Special Revenue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable): Federal (specify-) State (specify-) County (specify) Other (specify-) Federal Aid Urban System: Municipal State Aid: Tam Increment Financing: Other (please specify-): TOTAL ESTIMATED FC;~DING FOR PROJECT 100,000 100,000 11. Is this project in conformance ~.-ith the Comprehensive Plan which has been adopted by the Planning Commission? N/A If so, indicate the page(s) of the Comp Plan that apply: 12. Which department is responsible for the coordination of this project? Administrative Services Which division of that department is responsible? Admin. Pro.jects>101-4052:CIP/Voting Today's Date: February 5, 198i PROJECT SL~IMARY FORM 1988 CAPITAL BliDGET A~;D CAPITAL IMPROVE"IEwT PROGRAM 1989-93 CITY OF RICHFIELD, ^iINNESOTA 1 . Brief , descripti~-e name of project : OPTECI-I III ~: oting S~-stem 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about tree project. Attach ma.p or dra~.-ing, if applicable. 3. Is this project a continuation of an existing project? Yes If so, .-hat is the cit3- project number?To Be Determined 4. Do other projects have any relationship t.o this project? '~o If so, tahat is the relationship? In what years} and_~~ith what annual cos t is this project proposed to be scheduled? CIB 1988 ~ 60,000 CIP 7.991 CIP 1989 ~ CIP 1992 CIP 1990 S CIP 1993 6. Based on the following estimates, the cost of this project for phase TM2 year 1938 (as detailed in question tc~o) is: Planning; and Engineering: In-House: Contract: Acquisition of Property-:S Construction/Installation: In-House: Contracts}: Furnishings and Equipment:60,000 Contracts}: X60,000 Quotation(s): Construction Observation: In-House: Contract: Miscellaneous Expenses: Rents and Leases: Advertisement: Office Supplies: Copying: Postage: Mileage: Meetings: Other (please specify): Contingency: TOTAL ESTI:`IATED COST FOR PHASE ~2, 1988 $ 60,000 lise additional sheets as necessar3r to provide a cost estimate, as outlined above, for each and every phase or year of the project. Project Summary Form Today's Date: February :~, 198i 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 2 - OPTECH III_ ~"oting System r Which, if any, operating budget(s) need to be adjusted annuall3- as a result of this project. completion? Elections How much do you estimate the operating budget(s) will be affected (please note reduced expenditures in parenthesis)? First year personal services: $ ( 900) First year other services and charges: ~ (1,000) First ,y-ear commodities/supplies: $ First year debt services: Additicnal capital outlay: ~ First year transfers: 5 First year other (i.e., depreciation, etc.) ~ On a separate sheet of paper, provide a breakdo~~n of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.) See attached 8. What, if any, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? ~~one 9. What, if an,y, is the first year estimated operating income, plus or minus, resulting from this project? None 10. G~'hat is the proposed source(s) of funding for this project? iser Fees Special Re~-enue/P..everue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special assessment Other (specify) Grants (circle those applicable) Federal (specif5-j State ( specify-) County ispecify) Other (specify) Federal .aid Lrban System: Municipal State Aid: Tam Increment Financing: Other (please specify): TOTAL ESTIMATED FtJ`'DI:~:G FOR PROJECT 60,000 5 60,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? N/A If so, indicate the page(s) of the Comp Plan that apply: 12. Which department is responsible for the coordination of this project? administrative Services Which division of that department is responsible? City Clerk Water>CIP:Wells Today's Date: February 5, 1987 PROJECT SUI~IhIARY FORM 1988 CAPITAL BUDGET AND CAPITAL IMPROVEMENT PROGRATMI 1989-93 CITY OF RICHFIELD, ~IIN:vrESOTA 1. Brief, descriptive name of project: Well Pump ~1 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3. Is this project a continuation of an existing project? No If so, what is the city project number? 4. Do other projects have any relationship to this project? No If so, what is the relationship? 5. In what ,year(s) and with what annual cost is this project proposed to be scheduled? CIB 1988 $ 20,000 CIP 1991 $ CIP 1989 ~ CIP 1992 $ CIP 1990 $ CIP 1993 $ 6. Based on the following estimates, the cost of this project for Well ~1, year 1988 (as detailed in question two)is: Planning and Engineering:100 In-House: $100 Contract: Acquisition of Property:N/A Construction/Installation:19,550 In-House: Contract(s): $19,550 Furnishings and Equipment:N/A Contract(s): Quotation(s): Construction Observation:100 In-House: $100 Contract: Miscellaneous Expenses:250 Rents and Leases: Advertisement: $100 Office Supplies: $ 20 Copying: $100 Postage: $ 30 Mileage: Meetings: Other (please specify): Contingency:N/A TOTAL ESTIMATED COST FOR WELL #1, 1988 $ 20,000 Use additional sheets as necessary to provide a cost estimate, as outlined above, for each and every phase or year of the project. Project Summary Form Toda,y-'s Date: February 5, 198r 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 2 - tr'ell 71 7. Which, if any, operating budget(s) need to be adjusted annually as a result of this project completion? Water Mtc. How much do you estimate the operating budget(s) will be affected (please note reduced expenditures in parenthesis)? First year personal services: $ First year other services and charges: $ (100) First year commodities/supplies: $ (200) First ,year debt services: $ Additional capital outlay: $ First year transfers: $ First year other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdocan of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.) Utility-/Repairs 8. What, if any, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? 200 9. What, if an5-, is the first 3-ear estimated operating income, plus or minus, resulting from this project? None 10. What is the proposed source(s) of funding for this project? User Fees: $ 20,000 Special Revenue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable): Federal (specify) State (specify) County (specify) Other (specify) Federal Aid Urban System: Municipal State Aid: Tax Increment Financing: Other (please specify): TOTAL ESTIMATED FUNDING FOR PROJECT 20,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? Yes If so, indicate the page(s) of the Comp Plan that apply: 113-119 12. Which department is responsible for the coordination of this project:' Community Services Which division of that department is responsible? Water Mtc. t Project Summary Form Today's Date: February 5, 1981 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 3 - Well ; l 2. This is a continuation of a preventative maintenance program for replacing one well pump each year. We have found this prevents untimely breakdown during high pumping Summer months. The operating cost may be slightly less due to higher efficiency of the pump. Well #1, as located on the attached map, can be found in Nicollet Park in the vicinity of 62nd Street and Nicollet Avenue South. s~ v'ater>CIP:Deadends Today's Date: FebruarS- 5, 198'r PROJECT SUMMARY FORri 1988 CAPITAL BUDGET AND CAPITAL II~iPROVEr1EtiT PROGRAr1 1989-93 CITI' OF RICHFIELD, ~SINNESOTA 1. Brief, descripti~-e name of project: Loop Dead Ends 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3. Is this project a continuation of an existing project? Yes If so, what is the city project number? 703-1580 (1987 CIB) Do other projects have any relationship to this project? No If so, what is the relationship? 5. In what year(s) and with what annual cost is this project proposed to be scheduled? CIB 1988 $ 30,000 CIP 1991 $ CIP 1989 $ CIP 1992 $ CIP 1990 $ CIP 1993 $ 6. Based on the follo~Ying estimates, the cost of this project for phase =~2, 5-ear 1988 (as detailed in question two) is: Planning and Engineering:2,000 In-House: $2,000 Contract: Acquisition of Property:N/A Construction/Installation:10,000 In-House: $10,000 Contract(s): Furnishings and Equipment:15,000 Contract(s): $15,000 Quotation(s): Construction Observation N/A In-House: Contract: Miscellaneous Expenses:3,000 Rents and Leases: $2,300 Advertisement: $ 150 Office Supplies: $ 20 Copying: $ 200 Postage: $ 30 Mileage: $ 200 Meetings: $ 100 Other (please specify): Contingency:N/A TOTAL ESTIMATED COST FOR PHASE ~2, 1988 $ 30,000 Use additional sheets as necessary to provide a cost estimate, as outlined above, for each and every phase or year of the project. Project Summary Form Toda3T's Date: FebruarS- 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 2 - Loop Dead Ends 7. Which, if any, operating budget{s) need to be adjusted annually as a result of this project completion? How much do you estimate the operating budget(s) will be affected (please note reduced expenditures in parenthesis)? First year personal services: $ First year other services and charges: $ First year commodities/supplies: $ First year debt services: $ Additional capital outlay: $ First year transfers: $ First year other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdocan of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.) 8. What, if any, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? X14,300 9. What, if any, is the first year estimated operating income, plus or minus, resulting from this project?None 10. What is the proposed source(s) of funding for this project? User Fees:30,000 Special Re~renue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify} Grants (circle those applicable): Federal (specify) State (specify) County {specify) Other {specify) Federal Aid Urban System: Municipal State Aid: Tax Increment Financing: Other (please specify}: TOTAL ESTI:`1ATED FUNDING FOR PROJECT 30,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? Yes If so, indicate the page(s) of the Comp Plan that apply: 113-119 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible? Water Mtc. Project Summary Form Today's Date: February 5, 198'7 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 3 - Loop Dead Ends 2. This a project to complete the looping of dead ends in the water distribution system for purposes of providing better flow and fire protection in areas where the hater lines run into dead end streets. Reference attached map which locates sites of dead ends to be looped between the years of 1987 and 1990. Water>CIP:Highservice Today's Date: Februarj- 5, 198r PROJECT SU*iMARY FORM 1988 CAPITAL BUDGET AND CAPITAL IMPROVEMENT FR.OGRAM 1989-93 CITY OF RICHFIELD, ~1INNESOTA 1. Brief, descriptive name of project: High Service Pump 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3. Is this project a continuation of an existing project? Yes If so, what is the city project number? 703-1581 (1987 CIB) 4. Do other projects have any relationship to this project? No If so, what is the relationship? 5. In what year(s) and with what annual cost is this project proposed to be scheduled? CIB 1988 $ 20,000 CIP 1991 CIP 1989 $ CIP 1992 CIP 1990 $ CIP 1993 6. Based on the following estimates, the cost of thi s project for phase #2, year 1988 (as detailed in qu estion tw o) is: Planning and Engineering:250 In-House: $250 Contract: Acquisition of Property:N/A Construction/Installation:S 300 In-House: $300 Contract(s): Furnishings and Equipment:19,050 Contract(s): $19,050 Quotation(s): Construction Observation:300 In-House: $300 Contract: Miscellaneous Expenses:100 Rents and Leases: $50 Advertisement: $30 Office Supplies: Copying: $15 Postage: $ 5 Mileage: Meetings: Other (please specify): Contingenc3•:N/A TOTAL ESTIMATED COST FOR PHASE ;~2, 1988 $ 20,000 Use additional sheets as necessary to provide a cost estimate, as outlined above, for each and every phase or 5-ear of the project. Project Summary- Form Today' s Date : FebruarS- 2 , 198 r 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 2 - High Service Pump 7. Which, if any, operating budget(s) need to be adjusted annually as a result of this project completion? Water Mtc. Hoca much do you estimate the operating budget(s) will be affected (please note reduced e:~penditures in parenthesis)? First year personal services: $ First year other services and charges: $ (100) First year commodities/supplies: $ (200) First year debt services: $ Additional capital outlay: $ First year transfers: $ First year other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdo«n of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.) Utility/Repair 8. jr'hat, if any, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? $90Q 9. ta'hat, if any, is the first year estimated operating income, plus or minus, resulting from this project? None 10. What is the proposed source(s) of funding for this project? L?ser Fees: $ 20,000 Special Revenue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable): Federal (specify) State (specify} County (specify) Other (specify} Federal aid Urban System: Municipal State aid: Ta;c Increment Financing: Other (please specify): TOTAL ESTIMATED FUNDING FOR PROJECT 20,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? Yes If so, indicate the page(s) of the Comp Plan that apply: 113-119 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible? Water Mtc. Streets>CIP:Cover Today's Date: February ~, 1987 PROJECT SUMMARY FORM 1988 CAPITAL BUDGET AND CAPITAL IhIPROVE~IENT PROGRAM 1989-93 CITY OF RICHFIELD, TMIINNESOTA 1. Brief, descriptive name of project: Salt Storage Cover 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3. Is this project a continuation of an existing project? No If so, what is the city project number? 4. Do other projects have any relationship to this project? No If so, what is the relationship? 5. In what year(s) and with what annual cost is this project proposed to be scheduled? CIB 1988 $ 6,000 CIP 1991 CIP 1989 $ CIP 1992 CIP 1990 $ CIP 1993 6. Based on the following estimates, the cost of this project for phase ~l, year 1988 (as detailed in qu est ion tw o) is: Planning and Engineering:175 In-House: $lr5 Contract: Acquisition of Property:N/A Construction/Installation:5,250 In-House: Contract(s): $5,250 Furnishings and Equipment:N/A Contract(s): Quotation(s): Construction Observation:250 In-House: $250 Contract: Miscellaneous Expenses:75 Rents and Leases: Advertisement: Office Supplies: $15 Copying: $30 Postage: $20 Mileage: rleetings Computer: $10 Contingency:250 TOTAL ESTIMATED COST FOR PHASE #1, 1988 $ 6,000 Use additional sheets as necessary to provide a cost estimate, as outlined above, for each and every phase or year of the project. Project Summary Form Today's Date: Februar3- ~, 198r 1988 Capital Budget and Capital Improvement Program 1989/93 Cit3- of Richfield, Minnesota Page 2 - Salt Storage Cover 1. Which, if any, operating budget(s) need to be adjusted annually as a result of this project completion? None How much do you estimate the operating budget(s) will be affected (please note reduced expenditures in parenthesis)? First year personal services: $ First year other services and charges: $ First year commodities/supplies: $ First year debt services: Additional capital outlay: $ First year transfers: $ First year other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.) 8. What, if any, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? $425 9. What, if any, is the first year estimated operating income, plus or minus, resulting from this project? None 10. What is the proposed source(s) of funding for this project? User Fees: Special Revenue/Revenue Sharing: Bonds (circle those applicable}: General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable): Federal (specify-) State (specify) County (specify) Other (specify) Federal Aid L'rban System: Sunicipal State Aid: Tax Increment Financing: Other (please specify}; TOTAL ESTIMATED FUNDING FOR PROJECT 6,000 6,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? Yes If so, indicate the page(s) of the Comp Plan that apply: 1~1 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible? Street Mtc Project Summary Form Today's Date: February 5, 198' 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 3 - Salt Storage Cover 2. At the Central Garage, located as indicated on the attached map at 77th Street and Pillsbury Avenue South, there are two storage facilities, one for salt and the other for salt and sand mixtures used for ice control during the Winter season. The salt material has a building referred to as the "Salt Shed". This ~:eeps the salt from absorbing moisture during rain or heavy- wet snows which make the salt virtually impossible to use. The second mixture of salt and sand is currently stored outside in a three sided bin with no cover, leaving it exposed to rain and snow which, in turn, causes leaching of the salt from the mixture and a salt brine runoff. This project proposes to cover this area to protect this commodity from the elements and thereby comply with the Environmental Pollution Control regulations. Buildings>CIP:Carpet Today's Date: February 5, 1987 PROJECT SUMMARY FORI~1 1988 CAPITAL BUDGET AND CAPITAL IMPROt-E1IENT PROGRAM 1989-93 CITY OF RICHFIELD, MINNESOTA 1. Brief, descriptive name of project: G'it5- Hall Carpet 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3.No 4. Do other projects have any relationship to this project? No If so, what is the relationship? 5. In what year(s) and with what annual cost is this project proposed to be scheduled? CIB 1988 $ 30,000 CIP 1991 CIP 1989 $ CIP 1992 CIP 1990 $ CIP 1993 6. Based on the following estimates, the cost of this project for year 1988 (as detailed in question t~ao is: Planning and Engineering:300 In-House: $300 Contract: Acquisition of Property: Construction/Installation:28,400 In-House: $ 1,000 Contract(s): 27,400 Furnishings and Equipment: Contract(s): Quotation(s): Construction Observation:200 In-House: $200 Contract: Miscellaneous Expenses:100 Rents and Leases: Advertisement: $70 Office Supplies: 10 Copying: 10 Postage: 10 Mileage: Meetings: Other (please specify): Contingency-:1,000 TOTAL ESTIMATED COST FOR PHASE _, 1988 $ 30,000 Use additional sheets as necessary to provide a cost estimate, as outlined above, for each and every phase or year of the project. Is this project a continuation of an existing project? If so, what is the city project number? Project Summary Form Today's Date: Februar~r 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 2 - City Hall Carpet 7. Which, if any, operating budget(s) need to be adjusted annually as a result of this project completion? None How much do you estimate the operating budget(s) caill be affected (please note reduced expenditures in parenthesis}? First year personal services: $ First 3-ear other services and charges: $ First year commodities/supplies: $ First year debt services: $ Additional capital outlay: $ First year transfers: $ First year other (i.e., depreciation, etc.} $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.) 8. ~4'hat, if any, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? $1,500 9. What, if any, is the first year estimated operating income, plus or minus, resulting from this project? None 10. What is the proposed source{s) of funding for this project? User Fees: Special Revenue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special assessment Other (specify) Grants (circle those applicable): Federal (specify} State (specify) Count3- (specify) Other (specify-) Federal Aid Urban System: Municipal State .did: Tax Increment Financing: Other (please specify): 30,000 TOTAL ESTIMATED FUNDING FOR PROJECT $ 30,000 11. Is this project in conformance caith the Comprehensive Plan which has been adopted by the Planning Commission? Yes If so, indicate the page(s) of the Comp Plan that apply: 150 12. Which department is responsible for the coordination of this project? Community Services which division of that department is responsible? Gov. Bldgs Buildings>CIP:Compressor Today's Date: F_ebruar.y 5, 1987 PROJECT SUIriN1ARY FORyi 1988 CAPITAL BUDGET AND CAPITAL IriPROt~EMENT PROGRAyi 1989-93 CITI' OF RICHFIELD, MINNESOTA 1. Brief, descriptive project name: Air Conditioning Compressor 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3. Is this project a continuation of an existing project? No If so, what is the city- project number? 4. Do other projects have any relationship to this project? :y'o If so, what is the relationship? 5. In what year(s) and with what annual cost is this project proposed to be scheduled? CIB 1988 $ 10,000 CIP 1991 CIP 1989 $ CIP 1992 CIP 1990 $ CIP 1993 6. Based on the following estimates, the cost of this project for year 1988 (as detailed in question two i s: Planning and Engineering:300 In-House: $300 Contract: Acquisition of Property: Construction/Installation:9,100 In-House: $ 600 Contract(s): 8,500 Furnishings and Equipment: Contract(s): Quotation(s): Construction Observation:100 In-House: $100 Contract: Miscellaneous Expenses: Rents and Leases: Advertisement: Office Supplies: Copying: Postage: Mileage: Meetings: Other (please specify): Contingenc3=:500 TOTAL ESTIMATED COST FOR PHASE _, 1988 $ 10,000 Use additional sheets as necessary to provide a cost estimate, as outlined above, for each and every phase or year of the project. i Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 CitS- of Richfield, Minnesota Page 2 - Air Conditioning Compressor 7. Gdhich, if any, operating budget(s) need to be adjusted annually- as a result of this project completion? Gov. Bldgs How much do you estimate the operating budgets} will be affected (please note reduced expenditures in parenthesis)? First year personal services: $ First year other services and charges: $ (200) First year commodities/supplies: $ First year debt services: $ Additional capital outlay: $ First year transfers: $ First year other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.) [Jtility Savings 8. What, if an3=, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? X1,000 9. What, if an3-, is the first year estimated operating income, plus or minus, resulting from this project? 'g'one 10. What is the proposed source(s) of funding for this project? L'ser Fees Special Revenue/R.evenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable): Federal (specify) State (specify) County (specify) Other (specify-) Federal Aid Urban System: Municipal State Aid: Tax Increment Financing: Other {please specify): TOTAL ESTIMATED FtiNDING FOR PROJECT 10,000 10,000 11. Is this project in conformance with the Comprehensive Plan cahich has been adopted b3- the Planning Commission? Yes If so, indicate the page(s) of the Comp Plan that apply: 150 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible? Gov. Bldgs r Buildings>CIP:Energy Today's Date: February ~, 1987 PROJECT SUMMARY FORM 1988 CAPITAL BUDGET AND CAPITAL IMPROVEMENT PROGRA"1 1989-93 CITY OF RICHFIELD, MINNESOTA 1. Brief, descriptive name of project: Energy- Improvements 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3. Is this project a continuation of an existing project? I'es If so, what is the city project number? City Project 7540 4. Do other projects have any relationship to this project? No If so, tahat is the relationship? 5. In what year(s) and with what annual cost is this project proposed to be scheduled? CIB 1988 $ 10,000 CIP 1991 $ CIP 1989 $ CIP 1992 $ CIP 1990 $ CIP 1993 $ 6. Based on the follocaing estimates, the cost of this project for year 1988 {as detailed in question two)is: Planning and Engineering:300 In-House: $300 Contract: Acquisition of Property: Construction/Installation:9,000 In-House: $ 650 Contract(s): 8,350 Furnishings and Equipment: Contract(s): Quotation(s): Construction Observation:50 In-House: $50 Contract: Miscellaneous Expenses: Rents and Leases: Advertisement: Office Supplies: Copying: Postage: Mileage: Meetings: Other (please specify): Contingency:650 TOTAL ESTIMATED COST FOR PHASE _, 1988 $ 10,000 Use additional sheets as necessary to provide a cost estimate, as outlined above, for each and every phase or year of the project. Project Summary- Form Today's Date: February ~, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 2 - Energy Improvements 7. Which, if any, operating budget(s) need to be adjusted annually as a result of this project completion? Gov. Bldgs How much do you estimate the operating budget(s) will be affected (please note reduced expenditures in parenthesis)? First year personal services: $ First year other services and charges: $ (1,000) First year commodities/supplies: $ First year debt services: $ Additional capital outlay: $ First year transfers: $ First ,year other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.) Utility Savings 8. What, if any, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above}? $1,000 9. What, if any, is the first year estimated operating income, plus or minus, resulting from this project? iv'one 10. What is the proposed source(s) of funding for this project? L'ser Fees Special Revenue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specif~r) Grants (circle those applicable): Federal (specify-) State (specify) County (specify-) Other (specify) Federal Aid L'rban SS-stem: Municipal State Aid: Tax Increment Financing: Other (please specify): TOTAL ESTIMATED FU:~TDIVG FOR PROJECT 10,000 10,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? Yes If so, indicate the page(s) of the Comp Plan that apply: 150 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible? Gov. Bldgs J Jcu~:c~r.~z----------- - --- --- Page 1 1989 - 1993 CAPITAL IMPROVEMF,N7' PROGRAM PROPOSAL -CITY OF RIC[~'IELD, MINNESOTA Recommended and Scheduled for Five Year Period ; Cost t.oNO. ; FIZOJI:CTS ; 'IC)TAL CAST ;------- --------------; Complete J 1~$9 ; 1995)_i--1991 1992 ; 1993 'RrwoIIS~1 4~ Recreation/Open Space Dev. ; ; ~ ~ ~ , 1 { Pllrc~ct l;v ; 1f5,000 ; 33,000 R; 33,000 R; 33,000 R; 33,000 R; .33,000 R; ------ -- 2. ;._I'nxk._lruui Ac:yulaiticul._f.___:.~....100,UQ0._.L_19,4O~It:.~ZQ,900_i{1__24.Q40 R1 20,000 R! '10.,_4S14_.fii 1 i i i ; 1 , , '-'- ----- 4..3 ; le~glon Iriltc• Park ; 5,995,000 ; 270,000 R; 360,000 R; 360,000 R; 260,000 R; 250,000 R; 4,325,000 R 200 , 000 S . ~ .. ..._. --- -- _ __ .._-. _--- ---- ~ - - 4 ; .lr~ffrtr~;on Park ; 500,000 ; ; 300,000 R; ~ ~ ~J 1 I , ~_ --_ 1 , , , ~ 5 ~ Nicollet Park •; ~ 600,000'; ; ; ; 300,000 lt; ;J f> ~ Mru3isun Park ; 500,000 ; ; ; ; 300,000 R J 7 ; Washington Park ; 600,000 ; ; ; ; ; ; 300,000 Rl J 1 ---- ! ----.; - 244,.404---- - L 8 ; Sheridan Pads ; 500,000 ; 300,000 R V i -..29.4, 449--1 9 ;Garfield Park 35,000 ; 35,000 R; 1----- ._.... _ __ -_...------- _ ---to A)~ple 111()H:11)II+ ('~sr)t 27,000 ; ; ; 27 000 R; 11~ Tl~r nl•rntl_~c'_il;n{( t,;IIhta ~ ?0,000 ; ~ x.000 R~ ; 1 ~ l.. I 1 '~ 1 ~ ~ ; 1 1 12 ; Tce Arena Compresaora ; 13,000 ; I ; ; 13,000 R; ;J J V J l~ J lr r • Forestry>CIP:Forestry Today'Date: February 5, 1987 PROJECT SliMr1ARI' FORM 1988 CAPITAL BUDGET AND CAPITAL IMPROVEi1ENT PROGRAM 1989-93 CITY OF RICHFIELD, MINNESOTA 1. Brief, descriptive name of project: Forestry 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3. Is this project a continuation of an existing project? Yes If so, what is the city project number? City Project 7330 4. Do other projects have any relationship to this project? Yes If so, what is the relationship? Park development projects 5. In what year(s) and with what annual cost is this project proposed to be scheduled? CIB 1988 $ CIP 1991 $ 33,000 CIP 1989 $ 33,000 CIP 1992 $ 33,000 CIP 1990 $ 33,000 CIP 1993 $ 33,000 6. Based on the following estimates, the cost of this project for year 1989 (as detailed in question two) is: Planning and Engineering:1,000 In-House: $1,000 Contract: Acquisition of Property: Construction/Installation:15,000 In-House: $11,000 planting, $4,000 adm. Contract(s): Furnishings and Equipment:10,400 Contract(s): Quotation{s): Trees Construction Observation:500 In-House: Inspector Contract: Miscellaneous Expenses:6,100 Rents and Leases: $3,000 Advertisement: 50 Office Supplies: 10 Copying: 10 Postage: 30 Mileage: Meetings: Nursery Stock/Labor: 3,000 Contingency: TOTAL ESTIMATED COST FOR PHASE _, 1989 $ 33,000 Use additional sheets as necessary to provide a cost estimate, as outlined above, for each and every phase or year of the project. Project Summary Form Today's Date: February ~, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, ?linnesota Page 2 - Forestry 7.Ftihich, if any, operating budgets} need to be adjusted annually as a result of this project completion? `:one How much do you estimate the operating budget(s) i.~ill be affected (please note reduced etpenditures in parenthesis)? First year personal services: S First rear other services and charges: ~ First year commodities/supplies: ~ First year debt services: $ Additional capital outlay: ~ First year transfers: ~ First gear other (i.e., depreciation, etc.) S On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supplS-/capital outlay items needed, etc.) 8. what, if any, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? S18,500 9. What, if any-, is the first 5-ear estimated operating income, plus or minus, resulting from this project? '-:one 10. What is the proposed source(s) of funding for this project? User Fees: Special Revenue/Revenue Sharing:33,OG0 Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable): Federal (specify) State { specify-) County (specify) Other (specify) Federal Aid L'rban System: Municipal State Aid: Tat Increment Financing: Other (please specify): TOTAL ESTI`1ATED FL':~DItiG FOR PROJECT 33, 000 11. Is this project in conformance c:ith the Comprehensive Plan which has been adopted by the Planning Commission? des If so, indicate the page(s) of the Comp Plan that apply-: 32 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible? Admin. Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page ~ - Forestry 6. Based on the following estimates, the cost of this project for year 1990 (as detailed in question two) is: Planning and Engineering:1,000 In-House: X1,000 Contract: Acquisition of Property: Construction/Installation:15,000 In-House: $11,000 planting,4,000 adm. Contract(s): Furnishings and Equipment:10,400 Contract(s): Quotation(s): Trees Construction Observation:500 In-House: Inspector Contract: Miscellaneous Expenses:6,100 Rents and Leases: $3,000 Advertisement: 50 Office Supplies: 10 Copying: 10 Postage: 30 Mileage: Meetings: Nursery Stock/Labor: 3,000 Contingency: TOTAL ESTIMATED COST FOR PHASE _, 1990 $ 33,000 Project Summary Form Today's Date: Februar~T 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 5 - Forestry 6. Based on the following estimates, the cost of this project for ,year 1991 (as detailed in question two) is: Planning and Engineering:1,000 In-House: X1,000 Contract: Acquisition of Property: Construction/Installation:15,000 In-House: $11,000 planting,4,000 adm. Contract(s): Furnishings and Equipment:10,00 Contract(s): Quotations}; Trees Construction Observation:500 In-House: Inspector Contract: rliscellaneous Expenses:6,100 Rents and Leases: X3,000 Advertisement: 50 Office Supplies: 10 Copying: 10 Postage: 30 Mileage: Meetings: Nursery Stock/Labor: 3,000 Contingency: TOTAL ESTIMATED COST FOR PHASE _, ,1991 $ 33,000 Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 Cit3T of Richfield, Minnesota Page 6 - Forestry 6. Based on the following estimates, the cost of this project for year 1992 (as detailed in question two} is: Planning and Engineering:1,000 In-House: $1,000 Contract: Acquisition of Property: Construction/Installation:15,000 In-House: $11,000 planting,4,000 adm. Contract(s): Furnishings and Equipment:10,400 Contract(s): Quotation{s): Trees Construction Observation:500 In-House: Inspector Contract: Miscellaneous Expenses:6,100 Rents and Leases: $3,000 Advertisement: 50 Office Supplies: 10 Copying: 10 Postage: 30 Mileage: Meetings: Nursery Stock/Labor: 3,000 Contingency: TOTAL ESTIMATED COST FOR PHASE _, 1992 $ 33,000 Project Summary Form TodaST's Date: February 5, 1981 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, rlinnesota Page 7 - Forestry 6, Based on the following estimates, the cost of this project for year 1993 (as detailed in question two) is: Planning and Engineering:1,000 In-House: $1,000 Contract: Acquisition of Property: Construction/Installation:15,000 In-House: $11,000 planting, $4,000 adm. Contracts}: Furnishings and Equipment:10,400 Contract(s): Quotation(s): Trees Construction Observation:500 In-House: Inspector Contract: Miscellaneous Expenses:6,100 Rents and Leases: $3,000 Advertisement: 50 Office Supplies: 10 Copi-ing : 10 Postage: 30 Mileage: Meetings: Nursery Stock/Labor: 3,000 Contingency: TOTAL ESTIMATED COST FOR PHASE _, 1993 $ 33,000 CIP:Land Today's Date: February 5, 1987 PROJECT SUMMARY FORM 1988 CAPITAL BUDGET AND CAPITAL IMPROVEhIENT PROGRAM 1989-93 CITY OF RICHFIELD, MINNESOTA 1. Brief, descriptive name of project: Park Land Acquisition 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3. Is this project a continuation of an existing project? Yes If so, what is the city project number? Cit3- Project 758 4. Do other projects have a relationship to this project? Yes If so, what is the relationship? See attached 5. In what year(s) and with what annual cost is this project proposed to be scheduled? CIB 1988 $ CIP 1991 $ 20,000 CIP 1989 $ 20,000 CIP 1992 $ 20,000 CIP 1990 $ 20,000 CIP 1993 $ 20,000 6. Based on the following estimates, the cost of for years 1989-1993 (as detailed in question Planning and Engineering: In-House: Contract: Acquisition of Property: Construction/Installation: In-House: Contract(s): Furnishings and Equipment: Contract{s): Quotation(s): Construction Observation: In-House: Contract: Miscellaneous Expenses: Rents and Leases: Advertisement: Office Supplies: Copying: Postage: Mileage: Meetings: Other (please specify): Contingency: this project two) is: TOTAL ESTIMATED COST FOR YEARS 1989-93 See attached for explanation of why no expenditures are for the funding requested in 1989-1993. 0 estimated Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 2 - Park Land acquisition 7. Which, if any, operating budget(s) need to be adjusted annually as a result of this project completion? None How much do you estimate the operating budget(s) will be affected (please note reduced expenditures in parenthesis)? First year personal services: $ First year other services and charges: $ First year commodities/supplies: $ First year debt services: $ Additional capital outlay: $ First year transfers: $ First year other (i.e., depreciation, etc.} $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.) 8. What, if any, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? None 9. What, if any, is the first year estimated operating income, plus or minus, resulting from this project'? See attached 10. What is the proposed source(s) of f~::iding for this project? User Fees: Special Revenue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable): Federal (specify) State (specify) County (specify) Other (specify) Federal Aid Urban System: Municipal State Aid: Tax Increment Financing: Other (please specify): TOTAL ESTIMATED FUNDING FOR PROJECT 100,000 100,000 11. Is this project in conformance caith the Comprehensive Plan which has been adopted by the Planning Commission? Yes If so, indicate the page(s) of the Comp Plan that app1ST: Community Facilities Section, pages 73<1--I~? 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible? Admin. Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 Gity of Richfield, Minnesota Page 3 - Park Land Acquisition 2. Physical Description: The CitS- of Richfield can be considered fully developed which means there is no space of any major size available for park land. There are, however, certain parcels in the city, adjacent to existing park land, which are desirable for park purposes. These parcels, typically c~ith a single family dwelling and related areas and structures, are often free standing or somewhat isolated from other residential properties. It has long been the desire of the City of Richfield to acquire properties on the east side of Portland Avenue adjacent to Legion Lake Park. All but one of the residences north of the American Legion and south of the Water Plant were acquired as of year end 1986. The acquisition took place when a willing seller contacted the City caho had previously identified itself as a willing buyer. As a result of several acquisitions in a short period of time, the current city project c,*as at a deficit. Funding through 1987 offset this deficit. Continued funding will allow possible purchase from other willing sellers for park purposes. Location: Examples of parcels desirable for park purposes include, but are not limited to, properties on the west side of Irving Avenue adjacent to Monroe Park and remaining properties on the east side of Portland Avenue adjacent to Legion Lake Park. Purpose: The purpose of acquiring such parcels is to provide a more clear and clean definition of park space, to avoid conflict between public and private property and to continue to implement the goal of making desirable land available for park and recreation purposes. Need: Funding for acquisition of park land allows the City to take advantage of land purchase opportunities. This has been evidenced by the recent purchases adjacent to Legion Lake Park. It is not the intent of the City to practice eminent domain but rather to be prepared for a situation in which there is a willing seller to work with the City. With the level of funding suggested by staff, it takes several years to secure sufficient resources to purchase a single property. It is difficult to predict when such properties may become available. 4. Should property be acquired for park purposes at a time appropriate for combining such parcel{s) into a design for park redevelopment, such will be done. If the acquisition is at a time not easily coordinated with park redevelopment, such property shall be incorporated into the park as efficiently as possible within operating budget limitations. Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 4 - Park Land Acquisition 6. As explained above, park land acquisition, City Project 758, was at a deficit through 1987. It was necessary to balance this deficit first and then to build the project fund to a point where financing is available for future purchases. In the event a high priority property should become available before the project has sufficient funding available, it is recommended advantage of the situation, whereby a willing seller has contacted the City, be taken and the project again be allowed to operate at a deficit. With the proposed rate of annual funding, the City would only be able to purchase a single property once every five years or more. 9. When residential property is acquired for park purposes, such property will be removed from the tax rolls. The resulting loss of income to the City will vary with each property. However, the City does realize some income from the sale for removal of dwellings and, on occasion, there is some income from rental of the property until it can be removed from the site. CIP:Legion Today's Date: February 5, 1987 PROJECT SUMMARY FORM 1988 CAPITAL BUDGET AND CAPITAL IMPROVEMENT PROGRAM 1989-93 CITY OF RICHFIELD, r1INNESOTA 1. Brief, descriptive name of project: Legion Lake Park Z. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3. Is this project a continuation of an existing project? Yes If so, what is the city project number? City Project 802 4. Do other projects have any relationship to this project? Yes If so, what is the relationship? See attached ___ 5. In what year(s) and with what annual cost is this project proposed to be scheduled? CIB 1988 $ CIP 1991 $ 350,000 CIP 1989 $ 470,000 CIP 1992 $ 250,000 CIP 1990 ~ 350,000 CIP 1993 $ 250,000 Beyond 1993 $ 4,325,000 6. Based on the following estimates, the cost of this project for phase #3, year 1989 (as detailed in question two) is: Planning and Engineering: $ 20,000 In-House: $ 6,000 Contract: 14,000 Acquisition of Property: $ Construction/Installation: $ 180,000 In-House: $ 30,000 Contract(s): 150,000 Furnishings and Equipment: $ 148,000 Contract(sj: $110,000 Quotation{s): 38,000 Construction Observation: $ 18,000 In-House: $ 8,000 Contract: 10,000 liseellaneous Expenses: $ 4,000 Rents and Leases: $3,500 Advertisement: 300 Office Supplies: 50 Copying: 100 Postage: 50 Mileage: Meetings: Other (please specify): Contingency: $ 100,000 TOTAL ESTIMATED COST FOR PHASE #3, 1989 $ 470,000 See attached sheets for years 1990 through 1993 and beyond. Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93CityofRichfield, Minnesota Page 2 - Legion Lake Park 7. Which, if any, operating budget(s) need to be adjusted annually as a result of this project completion? How much do 5-ou estimate the operating budget(s) will be affected (please note reduced expenditures in parenthesis)? First year personal services: ~ First year other services and charges: $ First 3Tear commodities/supplies: ~ First year debt services: $ Additional capital outlay: ~ First year transfers: ~ First year other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.) See Attached 8. What, if any, is the in-house labor/equipment "credit" for working on this project(noted in question 6 above)? $365,000 9. What, if any, is the first year estimated operating income, plus or minus, resulting from this project? See Attached 10. What is the proposed source(s) of funding for this project? User Fees: Special Revenue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants {circle those applicable): Federal (specify) State ( specify) LC:~1R County (specify) Other {specify) Federal Aid Lrrban System: Municipal State Aid: Tax Increment Financing: Other (please specify): TOTAL ESTIMATED FUNDING FOR PROJECT 5,795,000 200,000 5,995,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? Yes If so, indicate the page(s) of the Comp Plan that apply: Community Facilities Section pages 133-157 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible? Admin. Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 3 - Legion Lake Park 6. Based on the following estimates, the for phase ~3, year 1990 (as detailed Planning and Engineering: In-House: ~ 8,000 Contract: 50,000 Acquisition of Property: Construction/Installation: In-House: Contract(s): Furnishings and Equipment: Contract(s): Quotation(s): Construction Observation: In-House: Contract: Miscellaneous Expenses: Rents and Leases: Advertisement: 300 Office Supplies: 50 Copying: 100 Postage: 50 Mileage: Meetings: Other -(please specify}: Contingency: cost of this project in question two) is: 58,000 500 291,000 TOTAL ESTIMATED COST FOR PHASE n3, 1990 $ 350,000 Note: It is anticipated 1990 will "catch up" with work remaining to be completed from preceding years and will be a year of planning for the plaza/esplanade which would be scheduled for construction in 1991 (hence, the large contingency). Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 4 - Legion Lake Park 6. Based on the following estimates, the cost of this project for phase #3, year 1991 (as detailed in question tw o) is: Planning and Engineering:16,000 In-House: $ 8,000 Contract: 8,000 Acquisition of Property: Construction/Installation:575,000 In-House: Contract(s): $575,000 Furnishings and Equipment: Contracts}; Quotation(s): Construction Observation:20,000 In-House: $10,000 Contract: 10,000 Miscellaneous Expenses:3,000 Rents and Leases: $2,500 Advertisement: 300 Office Supplies: 50 Copying: 100 Postage: 5p Mileage: Meetings: Other {please specify): Contingency:27,500 Less contingency from 1990 291,500} TOTAL ESTIMATED COST FOR PHASE #3, 1991 $ 350,000 Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, rlinnesota Page 5 - Legion Lake Park 6. Based on the following estimates, the for phase #4, year 1992 (.as detailed Planning and Engineering: In-House: $ 8,000 Contract: 20,000 Acquisition of Property: Construction/Installation: In-House: $ 36,000 Contract(s): $110,000 Furnishings and Equipment: Contract(s): $65,000 Quotation(s): 12,000 Construction Observation: In-House: $3,000 Contract: 3,000 Miscellaneous Expenses: Rents and Leases: $2,500 Advertisement: 300 Office Supplies: 50 Copying: 100 Postage: 50 Mileage: Meetings: Other (please specify); Contingency: cost of this project in question two} is: 28,000 TOTAL ESTIMATED COST FOR PHASE #4, 1992 136,000 77,000 6,000 3,000 250,000 Project Summary Form Today's Date: FebruarS~ 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 6 - Legion Lake Park 6. Based on the following estimates, the for phase =4, 3-ear 1993 (as detailed Planning and Engineering: In-House: X10,000 Contract: 8,000 Acquisition of Property: Construction/Installation: In-House: $ X3,000 Contract(s): X120,000 Furnishings and Equipment: Contract(s): X60,000 Quotation(s): 2,000 Construction Observation: In-House: $2,000 Contract: Miscellaneous Expenses: Rents and Leases: $2,500 Advertisement: 300 Office Supplies: 50 Copying: 100 Postage: 50 Mileage: Meetings: Other (please specify): Contingency: cost of this project in question two} is: 18,000 TOTAL ESTIMATED COST FOR PHASE #4, 1993 163,000 62,000 2,000 3,000 2,000 250,000 Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 7 - Legion Lake Park 6. Based on the following estimates, the cost of this project for phases #5/#6, year 1994+(detailed in q uestion two) is: Planning and Engineering:300,000 In-House: $ 50,000 Contract: 250,000 Acquisition of Property: Construction/Installation:3,500,000 In-House: $ 100,000 Contract(s): $3,400,000 Furnishings and Equipment:62,000 Contract(s): $60,000 Quotation(s): 2,000 Construction Observation:80,000 In-House: $20,000 Contract: 60,000 Miscellaneous Expenses:13,000 Rents and Leases: $12,000 Advertisement: 500 Office Supplies: 150 Copying: 200 Postage: 150 Mileage: Meetings: Other (please specify): Contingency:370,000 TOTAL ESTIMATED COST FOR PHASES #5/#6,1994+ $4,325,000 Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 8 - Legion Lake Park 2. Physical Description: Legion Lake Park is approximately 108 acres in size with a required storm water holding capacity of at least 62 acre feet. The site is described as a "community park". Currently located at the site is the city's water treatment plant and appurtenant facilities; the ice arena; the swimming pool; three well houses; four wells; a storage building used by the arena and pool; as asphalt parking lot, used by the arena, pool and as an MTC park and ride site; the archery range; a number of trees; some mown turf area and some natural area. There is a city concrete sidewalk along 66th Street, a county road. Work through 1988 includes muck excavation; the path systems, a second parking lot, preparatory work for the amphitheater site and some landscaping consisting of additional trees planted along 66th Street, earth mounding or berming and some grading and grass seeding. All fill materials used for the path system, parking lot, amphitheater and berms has been obtained at no direct cost to the city. The master plan for the Park was adopted by the city council in 1985 following city wide meetings and the recommendation of the Community Services Advisory Commission. Proposed park facilities include, but are not limited to, a large group picnic area, a family picnic area, walking paths, pathways for bicycles, floating and spanning bridges around, through and over open water and marsh areas, a large area play structure, a small area play structure, expanded parking, an amphitheater, a floating stage, swimming pool enhancements, a community center, an esplanade, fountains and landscaping. Proposed "construction" activity for 1989 includes the small picnic area with seeding, tables and play area; preparation of the plaza area including utility extension and concession building as well as extensive landscaping including seeding and planting. Proposed activity for 1990 and 1991 relates entirely to the Plaza Esplanade. Work proposed 1992 begins Phase IV with concentration on the large picnic site including two shelters one with restrooms), tables, a large play area and landscaping. Proposed activity for 1993 again concentrates on seeding and planting. Work to be completed beyond 1993 includes the amphitheater and performance stage, swimming pool enhancements and the community center. Location: Legion Lake Park is bounded by Crosstown 62 on the north and 66th Street on the south. Portland Avenue is on the west and the city has recently purchased all but one of the homes north of the American Legion Post 435 and south of the water treatment plant. There are also some commercial properties between the park and Portland Avenue including the American Legion, a funeral chapel and a gas service station. To the east of the park are a number of single family residences although the park boundary will border on 11th Avenue at some locations. Project SummarS> Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, ^iinnesota Page 9 - Legion Lake Park Purpose: Legion Lake Park is the only community partz in the city. It is to serve all ages. The residents of the city felt this site should be the "flagship" of the Richfield park system and should be a "legacy to the future". As a community> park, Legion Lake would be available for major city functions such as the Fourth of July celebrations, including a fireworks display and musical presentations, which are currently held at this site. Need: Prior to discussion in 1985, the resulting master park plan and the beginning of construction, Legion Lake Park was essentially undeveloped. This site is to be the major park in the community. To physically create the master park concept plan, it is necessary funding of the project continue. Every effort is being made to secure funding from all sources including grant programs, foundations and donations as well as the city's special revenue fund. Due to the uncertainty of outside funding, 1989 expenditures include a large contingency. In the event a grant or other outside funding is secured, activities planned for future years may begin. In the event outside funding is not secured, it may be necessary to reduce or delay some of the planned "construction" activity for 1989. 4. Coordination of the park design and construction caas and is in concert with storm sewer improvements related to Norby's Pond and Wilson's Pond, with improvements at the water treatment plant such as lime sludge dewatering and with park land acquisition. An Environmental Assessment Worksheet was prepared and no adverse effects were identified with this park project. 7. Several operating budgets may be affected by the completion of the master plan for Legion Lake Park. It would seem that once the community center is complete, a whole new and separate budgetary division may need to be created. Until that time, budgets to be affected may include: Park raintenance for grass areas and pathways, Street Maintenance for parking lots, Recreation for scheduling and staffing of picnic areas and the amphitheater and performance center, Swimming Pool for pool area enhancements and so forth. rluch of the affect on operating budgets will depend largely on actual construction design and schedule for completion of various aspects or phases. 9. Several operating budgets; i.e., Swimming Pool, Recreation or any newly created budgetary division, may likecaise be affected in terms of potential income or revenues. Again, this will depend on actual design and schedule for completion of various phases. CIP:Jefferson Today's Date: February 5, 1987 PROJECT SUMMARY FORM 1988 CAPITAL BUDGET AND CAPITAL Ii~iPROV"EMENT PROGRAM 1989-93 CITY OF RICHFIELD, MINNESOTA 1. Brief, descriptive name of project: Jefferson Park 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3. Is this project a continuation of an existing project? No If so, what is the city project number? 4.Do other projects have an,y relationship to this project? No If so, what is the relationship? 5. In what year(s) and with what annual cost is this project proposed to be scheduled? CIB 1988 $ CIP 1991 CIP 1989 $ CIP 1992 CIP 1990 $ 500,000 CIP 1993 6. Based on the following estimates, the cost of this project for year 1994 (as detailed in question two is: Planning and Engineering:60,000 In-House: $10,000 Contract: 50,000 Acquisition of Property: Construction/Installation:440,000 In-House: $ 40,000 Contracts}: 400,000 Furnishings and Equipment: Contract(s): Quotations}: Construction Observation: In-House: Contract: Miscellaneous Expenses: Rents and Leases: Advertisement: Office Supplies: Copying: Postage: Mileage: Lleetings Other (please specify): Contingency: TOTAL ESTIMATED COST FOR PHASE _, 1990 $500,000 Use additional sheets as necessary to provide a cost estimate, as outlined above, for each and every phase or year of the project. Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, 4linnesota Page 2 - Jefferson Park 7. Which, if any, operating budget(s) need to be adjusted annually as a result of this project completion? N/A How much do you estimate the operating budget(s) will be affected (please note reduced expenditures in parenthesis)? First year personal services: $ First ,year other services and charges: $ First year commodities/supplies: $ First year debt services: $ Additional capital outlay: $ First year transfers: $ First year other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.) 8. What, if any, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above}? $50,000 9. What, if any, is the first year estimated operating income, plus or minus, resulting from this project? none 10. What is the proposed source(s) of Engineering: User Fees: $ Special Revenue/Revenue Sharing: $ 300,000 Bonds (circle those applicable): $ General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable): Federal (specify) State (specify): LCMR County (specif3r) Other (specify} Federal Aid Urban System: Municipal State Aid: Tax Increment Financing: Other (please specifyj: TOTAL ESTIMATED FUNDING FOR PROJECT 200,000 500,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? Yes If so, indicate the pages} of the Comp Plan that apply: 26, Community Facilities Section 133-157 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible? Admin. Project Summary Form 1988 Capital Budget and Capital City of Richfield, Minnesota Page 3 - Jefferson Park 2. Description of project Name: Jefferson Park Today's Date: February 5, 1987 Improvement Program 1989/93 Physical description: Jefferson Park is approximately four acres in size, one city block. It is described as a neighborhood park" and currently includes such features as two fenced tennis courts, a limited amount of metal play equipment located in a fenced area, a hockey rink, a general skating rink, a ballfield backstop, a small wooden shelter building, a limited number of trees located on the four boulevards and general open space with very poor turf quality. Location: Jefferson Park is bounded by 67th Street on the north, Thomas Avenue on the east, 68th Street on the south and Upton Avenue on the west. It is located in an area not presently served by a developed city park facility. Purpose: As a neighborhood park, its purpose is to serve all ages, preschool to senior citizen, in a service area of approximately 1/4 to 3/4 mile. Need: tJhy requested: In 1970 city wide meetings were held to determine the direction of park development. As a result of that meeting, Jefferson Park was placed on a systematic schedule for redevelopment. Had the community park at Legion Lake not materialized, Jefferson Park would have been scheduled for redevelopment in 1986. However, as the Capital Improvement Program has been rearranged and extended for a number of reasons, including funding availability, redevelopment of Jefferson Park has been delayed to 1990. r CIP:Nicollet Today's Date: February 5, 1987 PROJECT SU~1~lARI' FORh1 1988 CAPITAL BUDGET AND CAPITAL IMPROVEMENT PROGRAM 1989-93 CITY OF RICHFIELD, MINNESOTA 1. Brief, descriptive name of project: Nicollet Part: 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or dracaing, if applicable. 3. Is this project a continuation of an existing project? IvTo If so, what is the city project number? 4.Do other projects have any relationship to this project? No If so, cahat is the relationship? 5. In what years} and caith what annual cost is this project proposed to be scheduled? CIB 1988 $ CIP 1991 CIP 1989 $ CIP 1992 500,000 CIP 1990 $ CIP 1993 6. Based on the following estimates, the cost o f this project for year 1992 (as detailed in question t~tiTO is: Planning and Engineering:60,000 In-House: $10,000 Contract: 50,000 Acquisition of Property: Construction/Installation:440,000 In-House: $ 40,000 Contract(s): 400,000 Furnishings and Equipment: Contract(s): Quotation(s): Construction Observation: In-House: Contract: Miscellaneous Expenses: Rents and Leases: Advertisement: Office Supplies: Copying: Postage: Mileage: Meetings: Other (please specify): Contingency: TOTAL ESTIMATED COST FOR PHASE _, 1992 $500,000 Use additional sheets as necessary to provide a cost estimate, as outlined above, for each and every phase or year of the project. Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 2 - Nicollet Park 7, Which, if any, operating budget(s) need to be adjusted annually as a result of this project completion? N/A How much do you estimate the operating budget(s) will be affected (please note reduced expenditures in parenthesis}? First year personal services: $ First year other services and charges: $ First year commodities/supplies: $ First year debt services: $ Additional capital outlay: $ First year transfers: $ First year other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.) 8. What, if any, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? $50,000 9. What, if any, is the first year estimated operating income, plus or minus, resulting from this project? None 10. What is the proposed source(s) of funding for this project? User Fees: Special Revenue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable): Federal (specify) State (specify): LCMR County (specify) Other (specify) Federal Aid Urban System: Municipal State Aid: Tax Increment Financing: Other (please specify): TOTAL ESTIMATED FUNDING FOR PROJECT 300,000 200,000 500,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? Yes If so, indicate the pages} of the Comp Plan that apply: Community Facilities Section 133-157 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible? Admin. Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 3 - Nicollet Park 2. Description of project Name : :vicollet Park Physical Description: Nicollet Park is approximately 6.5 acres in size. It is described as a "neighborhood park" and currently includes such features as a concrete block shelter building, wood play equipment over a sand base, a ballfield backstop, a cul-du-sac at First Avenue which provides some parking space, a ponding area to the north of the site, a pathway from Stevens Avenue to Nicollet Avenue and general purpose open space with very poor turf quality. Two city wells, including small, brick well house structures, are also located at the site. There is a city concrete sidewalk along the Nicollet Avenue boulevard. Location: Nicollet Park is bounded by the freeway Crosstown 62/I35~v to the north and Nicollet Avenue to the west. The southern boundary, which is approximately at 63-1/2 Street, has housing adjacent to the park land and the First Avenue cul-du- sac. The eastern edge of the park is all housing, all or most of which is privately fenced from the park land. The houses on this side of the park front on Stevens Avenue. Purpose: As a neighborhood park, its purpose is to serve all ages, preschool to senior citizen, in a service area of approximately 1/4 to 3/4 mile. Need: Why requested: City wide meetings were held in 1970 to determine the direction of park development. As a result of those meetings, Nicollet Park was placed on a systematic schedule for redevelopment. Due to the materialization of the community park at Legion Lake and reduction of funding sources; i.e., phase out of the federal Revenue Sharing program and increased costs, such as insurance premiums, for operation of the city's liquor stores which thereby reduced available funding for capital improvements, scheduling for redevelopment of Nicollet Park has been changed from 1988 to 1992. mJJ ~ J J7s7 A~ tpNNN A -1 -1 -1 -1 -1 XERXESAVE6 ,,----= ~->-~=- i ~~„,~ II WASHBURN ~~~ ~M ~L_ -L -- 11i, VINCENT I~r,~-"-~~---- -, UPTON ~'~-~~~" -" iIr1r-- ~-~. THOMASII~_.__J~_:L.-_,_ 1 ~_ ~~ .~_ ~-_ _ SNERIDAN ,~,~ - - -._ RUSSELLI! _ I• Y QUEEN ~ ^~ `- - ~,~i~~ it ~.-. _. .._.. PENNAVE. ~"~~~`--'^: I~ OLIVER ~~~~ LJ~-'---` NEWTONI~ ~~' _ r~' n MORGANI` LOGANI~(~~J KNOX ~ LJ~ JAMES ~\~ ~ I' r~~ IRVING ~~~ L\; MUMBOLDT ~- GIRARD ~/ r FREMONT ; "~ 1== EMERSON ~~~~^` DUPONT ~II ~~~~ COLFAX ~ ~~ 0~~BRYANTI ~O~i ALDRICH 'I' ~^~~r LYNDALEAVE. GARFIELDII HARRIETI' GRAND O PLEASANT II'~'~I-- ~---_1._ I1~00~ PILLSBURY I ~DDOL(WEHTWORTHI~~~~L[BLAISDELL ~~~ C HICOLLETAVE. ODD[ Ist I STEVENS ~~~~ 2nd ~~~~ 3rd ~~~~ CLINTON - ~~~ 4th11~ I ~~C PORTLANDAVE. ,RI,~fl ~~1 OAKLANDlli ~~~~ PARKiliI COLUMBUS I' ~~~ t CHICAGOI~~I ~~~I~ ELL10T '~I ~~~` I ~~~~ 10thIII ~~~(r IIihliii ~~Ol 12th ~aooo~13ih ~~~ 14thi ,---, ~ (O~ ~(15toIIII~~I ';~l BLOOMINGTONIil 16ihVIII ~~~ 17thi1\~ -- ~~I IBih ~~~1I CEDARAVE. _ -_~~_ _=_ ~_ J `- =1 LONGFELLOW -'------- 7xn_--- A' ~ _ ~ AJ m m .. Z (") n x -+ O "E1 { C .-. O Z ~ ~t r 8 ; M Z m -~s i ~ -d 0 N y O WN2 np = Hy ~ piXERXESAVE. WASHBURN J ~41VINCENT I~ UPTON JI~ THOMAS SNERIDAN RUSSELL i, QUEEN Il PENNAVE h.~. OLIVER JI~ NEWTON i~~FMORGAN LOGAN r--i.II +I' KNOX I.-~T;~ JAMES L IRVING I~ HUMBOLDT QI, IGIRARD I~ I FREMONT I9EMERSON iiDUPONT t~ COLFAX IIIt.~l\~~~ BRYANT IALDRICH LYNDALEAVE. I''llGARFIELDII I IHARRIET illGRAND 1 r-nk' PLEASANT IIIPILLSBURY i li ~ WENTWORTH I 11BLAISDELL I NICOLLETAVE. tUt I~, STEVENS i ~i,' 2nd IJJ 3rd 1~~ CLINTON II II4th Sth PORTLANDAVE. 1 IOAKLAND JiIPARK 111COLUMBUS CHICAGO ELLIOT IlIOIh l~li,~ IIIh 112th 13ih 14th - ISth 'l~ BLOOMINGTON J116th 117th 18th CEDARAVE. LOHGFELLOW 19th 20to 21st I 22nd STANDISH 23rd WN DO Y yJiN ~_ -tO_ O10 ~ VO~1Um Dnw ~+ > > 7 ~ 7S -1 Hyti -~ -i -1titiyH -i .NI T CIP:Madison Today's Date: :ebruary 5, 1987 PROJECT SUMMARYr'ORM 1988 CAPITAL BUDGET AND CAPITAL I^'IPROVEr1EtiT PROGRAM 1989-93 CITY OF RICHFIELD, MINNESOTA 1. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3. Is this project a continuation of an existing project? No If so, what is the city project number? 4. Brief, descriptive name of project: Madison Par1~ Do other projects have any relationship to this project? No If so, what is the relationship? 5. In what ,year(s) and with cahat annual cost is this project proposed to be scheduled? CIB 1988 $ CIP 1991 CIP 1989 $ CIP 1992 CIP 1990 $ CIP 1993 CIP 1994 500,000 6. Based on the following estimates, the cost of this project for year 199=1 (as detailed in question two is: Planning and Engineering:60,000 In-House: $10,000 Contract: 50,000 Acquisition of Property: Construction/Installation:440,000 In-House: $ 40,000 Contract(s): 400,000 Furnishings and Equipment: Contracts}; Quotation(s): Construction Observation: In-House: Contract: Miscellaneous Expenses: Rents and Leases: Advertisement: Office Supplies: Copying: Postage: Mileage: Meetings: Other (please specify): Contingency: TOTAL ESTIr1ATED COST FOR PHASE _, 1994 $500,000 Project Summary Form Today's Date: February- 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 2 - Aiadison Park 7. Which, if any, operating budget(s) need to be adjusted annually as a result of this project completion? N/A How much do you estimate the operating budget(s) will be affected (please note reduced expenditures in parenthesis)? First year personal services: $ First year other services and charges: $ First year commodities/supplies: $ First year debt services: $ Additional capital outlay: $ First year transfers: ~ First year other (i.e., depreciation, etc.) On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.) 8. What, if any, is the in-house labor/equipment "credit" for s;orking on this project (noted in question 6 above)? $50,000 9. What, if any, is the first 3Tear estimated operating income, plus or minus, resulting from this project?None 10. What is the proposed source(s) of funding for this project? User Fees: Special Revenue/Revenue Sharing:300,000 Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable):200,000 Federal (specify) State (specify): LCMR County (specif,y) Other (specify) Federal Aid Urban System: Municipal State Aid: Tax Increment Financing: Other (please specify): TOTAL ESTIMATED FUNDING FOR PROJECT 500,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? ~'es If so, indicate the page(s) of the Comp Plan that apply: Community Facility Section 133-157 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible? Admin. Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, rlinnesota Page 3 - Madison Park 2. Description of Project Name: ~4adison Park Physical Description: Madison Park is approximately 4.2 acres in size. It is described as a "neighborhood park" and currently includes such features as a small, wooden shelter building, limited pieces of metal play equipment, a ballfield backstop, lighting for a hockey rink, a few trees and general purpose open space with poor turf quality. Location: Madison Park is bounded by 63rd Street on the south and Crosstown 62 on the north. Knox Avenue dead ends at 63rd Street. If this ~.=ere not the case, Knox Avenue would continue north through the middle of the park. Houses, primarily single family residential, back onto the park property to the east and the west. Abutting houses to the east of the park front on James Avenue while abutting houses to the west of the park front on Logan Avenue. Madison Park is located in an area not presently served by a developed city park facility. Purpose: As a neighborhood park, Madison Park is to serve all ages, preschool to senior citizen, in a service area of approximately 1/4 to 3/4 mile. Need: Why requested: Based on city wide meetings held in 1970 to determine the direction of park development, Madison Park was placed on a systematic schedule for redevelopment. Because a community park at Legion Lake has materialized and funding sources for the Capital Improvement Program have been reduced, scheduling for redevelopment of Madison Park has been delayed from 1990 to 1994. CIP:tJashington Toda3-'s Date: _ February 5, 1987 PROJECT SUMMARI~ FORA 1988 CAPITAL BUDGET AND CAPITAL I~IPROVEhiENT PROGRAiI 1989-93 CITY OF RICHFIELD, MINNESOTA 1. Brief, descriptive name of project: Washington Park 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3. Is this project a continuation of an existing project? No If so, what is the city project number? 4. Do other projects have any relationship to this project? No If so, what is the relationship? 5. In what ,year(s) and with what annual cost is this project proposed to be scheduled? CIB 1988 $ CIP 1991 CIP 1989 $ CIP 1992 CIP 1990 $ CIP 1993 CIP 1996 500,000 6. Based on the following estimates, the cost o f this project for year 1996 (as detailed in question two is: Planning and Engineering:60,000 In-House: $14,000 Contract: 50,000 Acquisition of Property: Construction/Installation:440,000 In-House: $ 40,000 Contracts}: 400,000 Furnishings and Equipment: Contract(s): Quotation(s): Construction Observation: In-House: Contract: Miscellaneous Expenses: Rents and Leases: Advertisement: Office Supplies: Copying: Postage: Mileage: Meetings: Other (please specify): Contingency: TOTAL ESTIMATED COST FOR PHASE _, 1996 $500,000 Project SummarZ- Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 2 - Washington Parl: 7. Which, if any, operating budget(s) need to be adjusted annually as a result of this project completion? N/A How much do you estimate the operating budget(s) will be affected (please note reduced expenditures in parenthesis)? First year personal services: $ First year other services and charges: $ First year commodities/supplies: $ First year debt services: $ Additional capital outlay: $ First year transfers: $ First year other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.) 8. What, if any, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above}? $50,000 9.What, if any, is the first year estimated operating income, plus or minus, resulting from this project? tione 10. What is the proposed source(s) of funding for this project? User Fees: Special Revenue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable) Federal (specify) State (specify): LCMR County (specify) Other (specify) Federal Aid Urban System: Municipal State Aid: Tax Increment Financing: Other (please specify): TOTAL ESTIMATED FUNDING FOR PROJECT 300,000 200,000 500,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? I'es If so, indicate the page(s) of the Comp Plan that apply: Community- Facilities Section 133-157 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible? Admin. Project Summary Form Today's Date: February- 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 3 - Washington Park 2. Description of project Name: Washington Park Physical description: Washington Park is approximately 7 acres in size. It is described as a "neighborhood park" and currently includes such features as four lighted tennis courts, a practice tennis court with bang wall, two unused tennis courts in almost total disrepair, a limited amount of metal play equipment, a ballfield backstop, a well and pump for drinking water and general purpose open space, with very poor turf quality, that is often used as a temporary soccer field. There is no building available at this site. There are no shade trees at the site. Location: Washington Park is located in the southeast sector of the city in an area which includes single family dwellings, multiple dwellings, commercial and office space. It is bounded by 76th Street on the north and 77th Street on the south. To the west are single family residences which back onto the park and front the 16th Avenue cul-du-sac. Also to the west is a parcel of land-locked open space which is privately owned and an apartment complex and parking lot with access to 77th Street. The eastern border of the park approximates 18th Avenue, had it continued through to the south. This eastern edge of the park is adjacent to apartment buildings. Washington Park is located in an area not presently served by a developed city park facility. Purpose: As a neighborhood park, the purpose of Washington Park is to serve all ages, preschool to senior citizen, in a service area of approximately 1/4 to 3/4 mile. Need: Why requested: As with all parks in the city, Washington Park was placed on a systematic schedule for redevelopment as a result of city wide meetings held in 1970 to determine the direction of park development. With reduced funding available for capital projects and materialization of a community park at Legion Lake, redevelopment of Washington Park has been delayed. Redevelopment of Washington Park is currently scheduled for 1996. CIP:Sheridan Today's Date: February 5, 1987 PROJECT SUrIMARY FORM 1988 CAPITAL BUDGET AND CAPITAL II~IPROVEMEIv'T PROGRAM 1989-93 CITY OF RICHFIELD, MINNESOTA 1. Brief, descriptive name of project: Sheridan Park 2.. On a separate sheet, provide detail explaining the location, bacl~ground, purpose and other information about the project. Attach map or drawing, if applicable. 3.Is this project a continuation of an existing project? No If so, c.*hat is the city project number? 4. Do other projects have any relationship to this project? No If so, cahat is the relationship? 5. In what year(s) and with what annual cost i s this project proposed to be scheduled? CIB 1988 $ CIP 1991 CIP 1989 $ CIP 1992 CIP 1990 $ CIP 1993 CIP 1998 500,000 6. Based on the following estimates, the cost of this project for year 1998 (as detailed in question two is: Planning and Engineering:60,000 In-House: $10,000 Contract: 50,000 Acquisition of Property: Construction/Installation:440,000 In-House: $ 40,000 Contract(s): 400,000 Furnishings and Equipment: Contract(s): Quotation(s): Construction Observation: In-House: Contract: Miscellaneous Expenses: Rents and Leases: Advertisement: Office Supplies: Copying: Postage: Mileage: Meetings: Other (please specify): Contingency: TOTAL ESTIMATED COST FOR PHASE _, 1998 $500,000 Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 2 - Sheridan Park 7. Which, if any, operating budget(s) need to be adjusted annually as a result of this project completion? N/A How much do you estimate the operating budget(s) will be affected (please note reduced expenditures in parenthesis)? First year personal services: $ First ,year other services and charges: $ First year commodities/supplies: $ First ,year debt services: $ Additional capital outlay: $ First year transfers: $ First 3-ear other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdocan of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.} 8. What, if any, is the in-house labor/equipment "credit" for working on this project {noted in question 6 above)? $50,000 9. What, if any, is the first year estimated operating income, plus or minus, resulting from this project? None 10. What is the proposed source(s) of funding for this project? User Fees: Special Revenue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable): Federal (specify) State ( specify) : LC;~IR County (specify) Other (specify) Federal Aid Urban System: Municipal State Aid: Tax Increment Financing: Other (please specify): TOTAL ESTIMATED FUNDING FOR PROJECT 300,000 200,000 500,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? Yes If so, indicate the page(s) of the Comp Plan that apply: Community Facilities Section 133-157 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible? Admin. Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, rlinnesota Page 3 - Sheridan Park 2. Description of project Name: Sheridan Park Physical Description: Sheridan Park is approximately 6.8 acres in size. It is described as a "neighborhood park" and currently includes such features as two tennis courts, a ballfield backstop with agrilime infield, a sand base volleyball pit, two fenced horseshoe pits, wooden play structures over a sand base, a ponding area, shade trees, an asphalt pathway through the park connecting 65th Street with the Thomas Avenue cul-du-sac, a boulevard sidewalk to the west and general purpose open space with poor quality turf. Location: Sheridan Park is to the south of Sheridan Hills Elementary School. The park is bounded by 65th Street on the north and Upton Avenue on the west. An apartment complex which fronts on 66th Street is along the southern boundary. To the east are single family residences which front on Sheridan Avenue. Purpose: As a neighborhood park, the purpose of Sheridan Park is to serve all ages, preschool to senior citizen, in a service area of approximately 1/4 to 3/4 mile. Need: Wh,y requested: Sheridan Park is located in an area not presently served by a developed city park facility. As a result of city wide meetings held in 1970 to determine the direction for development of the Richfield park system, all city parks were placed on a systematic schedule for redevelopment. Prior to the materialization of a community park at Legion Lake and a reduction of funding available for capital projects, redevelopment of Sheridan Park was scheduled for 1994. It is now scheduled for 1998. CIP:Garfield Today's Date: February 5, 1987 PROJECT SUMMARI' FORM 1988 CAPITAL BUDGET AND CAPITAL IMPROVEMENT PROGRAM 1989-93 CITY OF RICHFIELD, MINNESOTA 1. Brief, descriptive name of project: Garfield Park 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3. Is this project a continuation of an existing project? No If so, what is the city project number? 4. Do other projects have any relationship to this project? No If so, what is the relationship? 5. In what year{s) and with what annual cost i s this project proposed to be scheduled? CIB 1988 $ CIP 1991 $35,000 CIP 1989 $ CIP 1992 $ CIP 1990 $ CIP 1993 $ 6. Based on the following estimates, the cost of this project for year 1991 (as detailed in question two)is: Planning and Engineering:2,000 In-House: $2,000 Contract: Acquisition of Property: Construction/Installation:33,000 In-House: Contract(s): $33,000 Furnishings and Equipment: Contract(s): Quotation(s): Construction Observation: In-House: Contract: Miscellaneous Expenses: Rents and Leases: Advertisement: Office Supplies: Copying: Postage: Mileage: Meetings: Other (please specify): Contingency: TOTAL ESTIMATED COST FOR PHASE _, 1991 $35,000 Use additional sheets as necessary to provide a cost estimate, as outlined above, for each and every phase or year of the project. Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 2 - Garfield Park 7. Which, if any, operating budget(s) need to be adjusted annually as a result of this project completion? N/A How much do 3-ou estimate the operating budget{s) will be affected (please note reduced expenditures in parenthesis)? First First First First Addit First 5-ear year year year Tonal year personal services: other services and cr commodities/supplies: debt services: capital outlay: transfers: arges: $ First year other (i.e., depreciation, etc.} $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.) 8. What, if anSr, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? 2,000 9. t4hat, if any, is the first year estimated operating income, plus or minus, resulting from this project? None 10. What is the proposed source(s) of funding for this project? User Fees: Special Revenue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable}: Federal (specify) State (specify) County (specify) Other (specify) Federal Aid Urban System: Municipal State Aid: Tax Increment Financing: Other (please specify): 35,000 TOTAL ESTIMATED FUNDING FOR PROJECT $ 35,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? Yes If so, indicate the page(s) of the Comp Plan that apply: Community Facilities Section 133-157 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible? Admin. Project Summary Form 1988 Capital Budget and Capital City of Richfield, Minnesota Page 3 - Garfield Part: 2. Description of project Name: Garfield Park Physical Description: acres in size. It is very south. It is described as such features as a limited general purposes open spac building. Today's Date: Februar3' 5, 1987 Improvement Program 1989/93 Garfield Park is approximately .8 long and narrow, running north to a "mini park" and currently includes amount of metal play equipment, and some trees. There is no shelter Location: Garfield Park is bounded by 63rd Street on the north. It is essentially the road and right of way for Garfield Avenue had it continued south of 63rd Street. Single family residences are adjacent to the park on the east. To the west is a redwood fence abutting a commercial parking lot. Purpose: As a mini park, the purpose of Garfield Park is to serve all ages, although it may serve a specialized group such as tots or senior citizens, within a service area of 1/4 mile. Garfield Park is located in a neighborhood not currently served by a developed city- park facility. Need: Why requested: Due to reduced funding available for capital projects, the redevelopment of Garfield Park has been delayed from 1987 to its currently scheduled date of 1991. r CIP:Apple Blossom Today's Date: February 5, 1987 PROJECT SL'"IMARY FORri 1988 CAPITAL BL'~DGET AND CAPITAL IMPROVEMENT PROGRAM 1989-93 CITY' OF RICHFIELD, MINNESOTA 1. Brief, descriptive name of project: Apple Blossom Park 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or dra~.~ing, if applicable. 3. Is this project a continuation of an existing project? No If so, what is the city project number? Do other projects have any relationship to this project? No If so, what is the relationship? 4. 5. In what vearls) and with what annual cost is this project proposed to be scheduled? CIB 1988 S CIP 1991 CIP 1989 ~ CIP 1992 CIP 1990 ~ CIP 1993 27,000 6. Based on the following estimates, the cost of this project for year 1993 (as detailed in question two i s: Planning and Engineering:1,500 In-House: $1,500 Contract: Acquisition of Property: Construction/Installation:25,500 In-House: Contract(s): $25,500 Furnishings and Equipment: Contract(s): Quotations}: Construction Observation: In-House: Contract: Miscellaneous Expenses: Rents and Leases: Advertisement: Office Supplies: Copying: Postage: Mileage: Meetings: Other (please specify): Contingency: TOTAL ESTIMATED COST FOR PHASE _, 1993 $27,000 Use additional sheets as necessary to provide a cost estimate, as outlined above, for each and every phase or year of the project. Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 CitS- of Richfield, Minnesota Page 2 - Apple Blossom Park 7. Which, if any, operating budget(s) need to be adjusted annually- as a result of this project completion? N/A How much do you estimate the operating budget(s) will be affected (please note reduced expenditures in parenthesis)? First 3-ear personal services: $ First year other services and charges: $ First year commodities/supplies: $ First year debt services: $ Additional capital outlay: $ First year transfers: $ First year other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.} 8. What, if any, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? 1,500 9. What, if any, is the first year estimated operating income, plus or minus, resulting from this project? None 10. What is the proposed source(s) of funding for this project? User Fees: Special Revenue/Revenue Sharing: Bonds {circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable): Federal (specify) State (specify) County (specify) Other ( specify) Federal Aid Urban S3-stem: Municipal State Aid: Tax Increment Financing: Other (please specify-): TOTAL ESTIMATED FUNDING FOR PROJECT 27,000 27,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? Yes If so, indicate the page(s) of the Comp Plan that apply: Community Facilities Section 133-157 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible? Admin. Project Summary- Form Today's Date: Februari• 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 Cit3- of Richfield, Minnesota Page 3 - Apple Blossom Park 2. Description of project Name: Apple Blossom Park Physical Description: Apple Blossom Parr. is approzimatel3- .6 acres in size. It is described as a "mini park" and currently- is open space caith some trees, including flowering crab apple trees. There are no other facilities typically associated with a park. Location: Apple Blossom Parli is about ~ city lots in size. The wood sound barrier caall of I35W is to the east. Single family residences are to the north and south. The west edge of the park is Girard Avenue between 66th Street and 67th Street. Purpose: As a mini park, the purpose of Apple Blossom Park is to serve all ages, although it may serve a specialized group such as tots or senior citizens, within a service area of 1/4 mile. When Faircaood Park and Monroe Park were redeveloped, tentative design of Apple Blossom Park included provision of play equipment for small, young children. deed: Why requested: Due to reduced funding available for capital projects, the development of Apple Blossom Park has been dela3-ed from 1989 to its currently scheduled date of 1993. Arena>CIP:Compressors Today's Date: February 5, 1981 PROJECT SUMMARY FORP~1 1988 CAPITAL BUDGET AND CAPITAL IMPROVEMENT PROGRAM 1989-93 CITY OF RICHFIELD, LvIINNESOTa 1. Brief, descriptive name of project: Ice Arena Compressors 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. attach map or drawing, if applicable. 3. Is this project a continuation of an existing project? No If so, what is the city project number? 4. Do other projects have an,y relationship to this project? Yes If so, what is the relationship? See proposed 1988 project 5. In cahat year(s) and with what annual cost is this project proposed to be scheduled? CIB 1988 $ CIP 1991 13,000 CIP 1989 ~ CIP 1992 CIP 1990 $ CIP 1993 6. Based on the following estimates, the cost of this project for phase YTwo, year 1991 (as detailed in question two) is: Planning and Engineering: In-House: Contract: Acquisition of Property-: Construction./Installation:13,000 In-House: $ 1,500 Contract(s): 11,500 Furnishings and Equipment: Contract(s): Quotation(s): Construction Observation: In-House: Contract: Miscellaneous Expenses: Rents and Leases: Advertisement: Office Supplies: Copying: Postage: Mileage: Meetings: Other {please specify): Contingency: TOTAL ESTIMATED COST FOR PHASE #2, 1991 $ 13,000 Use additional sheets as necessary to provide a cost estimate, as outlined above, for each and ever3T phase or year of the project. Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, ?Minnesota Page 2 - Arena Compressors 7. Which, if any, operating budget(s) need to be adjusted annuall,v as a result of this project completion? Ice Arena How much do you estimate the operating budget(s) will be affected (please note reduced expenditures in parenthesis)? First 3-ear personal services: $ First year other services and charges: $ (1,000) First year commodities/supplies: $ First year debt services: $ Additional capital outlay: $ First year transfers: $ First year other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.) Utility Savings 8. What, if any, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? $1,500 9. khat, if any, is the first year estimated operating income, plus or minus, resulting from this project? None 10. khat is the proposed source(s) of funding for this project? User Fees: Special Revenue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable): Federal (specify) State (specify) County (specify) Other (specify) Federal Aid Urban System: Iunicipal State Aid: Tax Increment Financing: Other (please specify}: 13,000 TOTAL ESTIMATED FUNDING FOR PROJECT $ 13,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? Yes If so, indicate the page{s) of the Comp Plan that apply: 153 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible? Ice Arena Arena>CIP:Lights Today's Date: February 5, 1987 PROJECT SUIvIMARY FORM 1988 CAPITAL BUDGET AND CAPITAL ILIPROVEMENT PROGRAM 1989-93 CITY OF RICHFIELD, MINNESOTA 1. Brief, descriptive name of project: Ice Arena Ceiling Lights 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3. Is this project a continuation of an existing project? No If so, what is the city project number? 4.Do other projects have anSr relationship to this project? Ivio If so, what is the relationship? 5. In what ,year{s) and with ~~hat annual cost is this project proposed to be scheduled? CIB 1988 $ CIP 1991 CIP 1989 ~ CIP 1992 CIP 1990 $ 20,000 CIP 1993 6. Based on the following estimates, the cost of this project for year 1990 (as detailed in question two is: Planning and Engineering: In-House: Contract: Acquisition of Property: Construction/Installation:7,000 In-House: $2,500 Contract(s): 4,500 Furnishings and Equipment:12,000 Contracts}: Quotation(s): $12,000 Construction Observation: In-House: Contract: Miscellaneous Expenses:1,000 Rents and Leases: $1,000 Advertisement: Office Supplies: Copying: Postage: Mileage: Meetings: Other (please specify): Contingency: TOTAL ESTIivIATED COST 'r'OR PHASE _, 1990 $ 20,000 Use additional sheets as necessary to provide a cost estimate, as outlined above, for each and every phase or year of the project. Project Summary Form Todayr's Date: FebruarS- 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 2 - Ice Arena Ceiling Lights 7. Which, if any-, operating budgets} need to be adjusted annually as a result of this project completion? Ice Arena Hoc~~ much do you estimate the operating budget(s) will be affected (please note reduced expenditures in parenthesis}? First year personal services: $ First year other services and charges: $ (1,000) First year commodities/supplies: $ First year debt services: $ Additional capital outlay: $ First year transfers: $ First ,year other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.) Utility Savings 8. What,if any, is the in-house labor/equipment credit" for worki ng on this project (noted in question 6 above)? $3,500 9. What,if any, is the first year estimated ope rating income, plus or minus, resulting from this project?None 10. what is the proposed source(s) of funding for this project? User Fees: Special Revenue/Revenue Sharing:20,000 Bonds (circle those applicable}; General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable): Federal (specify) State (specify) County (specify) Other (specify) Federal Aid Urban System: Municipal State Aid: Tax Increment Financing: Other (please specify): TOTAL ESTIMATED FUNDING FOR PROJECT $ 20,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted b~° the Planning Commission? I'es If so, indicate the page(s) of the Comp Plan that apply: 153 12. Which department is responsible for the coordination of this project? Communit3' Services Which division of that department is responsible? Ice Arena Project Summary Form Today's Date: FebruarS• ~, 1987 1988 Capital Budget and Capital Improvement Program 1989/9 City of Richfield, Minnesota Page 3 - Ice arena Ceiling Lights 2. The Richfield Ice Arena is located at 636 East 66th Street. The present ceiling light system consists of 88 fluorescent light fixtures which are rusting and beginning to deteriorate. These fixtures will be 20 ,years old when scheduled for replacement in 1990. City staff is now investigating the type of lighting to install; i.e., fluorescent, metal-halite or a combination. The project will involve removal of the existing fixtures as well as purchase and installation of the new fixtures. The purchase of a hydraulic lift is also included in the project. The lift would be used for future repair of fixtures, changing bulbs and corking on the scoreboard and sound system. Arena>CIP:Toccer Today's Date: February 5, 1987 PROJECT SUMMARY FORM 1988 CAPITAL BUDGET AND CAPITAL I~IPROV'E~IENT PROGRAM 1989-93 CITY OF RICHFIELD, hIINNESOTA 1. Brief, descriptive name of project: Ice Arena Cooling Tower 2.. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3. Is this project a continuation of an existing project? No If so, what is the city project number? 4. Do other projects have any relationship to this project? No If so, cahat is the relationship? 5. In ~~hat year(s) and with what annual cost is this project proposed to be scheduled? CIB 1988 $ CIP 1991 $ 12,000 CIP 1989 ~ CIP 1992 $ CIP 1990 $ CIP 1993 $ 6. Based on the follo~~ing estimates, the cost of this project for year 1991 (as detailed in question two)is: Planning and Engineering: In-House: Contract: Acquisition of Property: Construction/Installation:12,000 In-House: $ 2,000 Contract{s): 10,000 Furnishings and Equipment: Contract{s): Quotation(s): Construction Observation: In-House: Contract: Miscellaneous Expenses: Rents and Leases: Advertisement: Office Supplies: Copying: Postage: Mileage: ieetings Other (please specif3-): Contingency-: TOTAL ESTIMATED COST FOR PHASE _, 1991 $ 12,000 Use additional sheets as necessary to provide a cost estimate, as outlined above, for each and every phase or year of the project. Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 2 - Ice Arena Cooling Tower 7. Which, if any, operating budget(s) need to be adjusted annually as a result of this project completion? None How much do 5-ou estimate the operating budget(s) caill be affected (please note reduced expenditures in parenthesis}? First ,y-ear personal services: $ First year other services and charges: $ First year commodities/supplies: $ First year debt services: $ Additional capital outlay: $ First year transfers: $ First ,y-ear other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.) 8. What, if any, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? $2,000 9. What, if any, is the first year estimated operating income, plus or minus, resulting from this project? None 10. What is the proposed source(s) of funding for this project? User Fees: Special Revenue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable}: Federal (specify) State (specify} Count3- ( specify) Other (specify) Federal Aid Urban System: Municipal State Aid: Tax Increment Financing: Other (please specify): TOTAL ESTIMATED FUNDING FOR PROJECT 12,000 12,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? Yes If so, indicate the page(s) of the Comp Plan that apply: 153 12. Which department is responsible for the coordination of this project? Community Center Which division of that department is responsible? Ice Arena Arena>CIP:Dasherboards Today's Date: February 5, 1987 PROJECT SUNiNiARY FORM 1988 CAPITAL BUDGET AND CAPITAL IMPROVEMENT PROGRAM 1989-93 CITI OF RICHFIELD, MINNESOTA 1. Brief, descriptive name of project:Arena Dasherboards/Glass 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3.Is this project a continuation of an existing project? If so, what is the city project number? 4. Do other projects have any relationship to this project? No If so, what is the relationship? 5. In whaty-ear(s) and with what annual cost is this project proposed to be scheduled? CIB 1988 $ CIP 1991 ~ CIP 1989 ~ CIP 1992 $ CIP 1990 $ CIP 1993 $ 75,000 6. Based on the following estimates, the cost of this project for 5-ear 1993 (as detailed in question two) is: Planning and Engineering:7,500 In-House: Contract: $7,500 Acquisition of Property: Construction/Installation:50,000 In-House: $ 5,000 Contract(s): 45,000 Furnishings and Equipment:17,500 Contract(s): Quotation(s): X17,500 Construction Observation: In-House: Contract: Miscellaneous Expenses: Rents and Leases: Advertisement: Office Supplies: Copying: Postage: hii leage Meetings: Other (please specify): Contingency: TOTAL ESTIMATED COST FOR PHASE _, 1993 $ 75,000 Use additional sheets as necessary to provide a cost estimate, as outlined above, for each and every phase or year of the project. itif O Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 2 - Arena Dasherboards/Glass 7. Which, if any, operating budget(s) need to be adjusted annually as a result of this project completion? None How much do you estimate the operating budget(s) will be affected (please note reduced expenditures in parenthesis)? First year personal services: $ First year other services and charges: $ First year commodities/supplies: $ First year debt services: $ Additional capital outlay: $ First year transfers: $ First year other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.) 8. What, if any, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? $5,000 9. What, if any, is the first year estimated operating income, plus or minus, resulting from this project? ?vTone 10. What is the proposed source(s) of funding for this project? User Fees: Special Revenue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable): Federal (specify) State (specify) County (specify} Other (specify) Federal Aid Urban System: Municipal State Aid: Tax Increment Financing: Other (please specify): TOTAL ESTI:~fATED FUNDING FOR PROJECT 75,000 75,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? I'es If so, indicate the page(s) of the Comp Plan that apply: 153 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible? Ice Arena Pool>GIP:Roof Today's Date: February 5, 1987 PROJECT SUlviriARY FORM 1988 CAPITAL BUDGET AND CAPITAL IMPROVEMENT PROGRAM 1989-93 CITI OF RICHFIELD, MINNESOTA 1. Brief, descriptive project name: Pool Roof/Lifeguard chairs 2.. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3. Is this project a continuation of an existing project? No If so, what is the city- project number? 4.Do other projects have any relationship to this project? No If so, what is the relationship? 5. In t.~hat rear(s) and with what annual cost is this project proposed to be scheduled? CIB 1988 $ CIP 1991 $ CIP 1989 $ 20,000 CIP 1992 $ CIP 1990 $ CIP 1993 $ 6. Based on the following estimates, the cost of this project for year 1989 (as detailed in question two) is: Planning and Engineering: In-House: Contract: Acquisition of Property: Construction/Installation:14,000 In-House: $ 2,000 Contract(s): 12,000 Furnishings and Equipment:6,000 Contract(s): Quotation(s): $6,000 Construction Observation: In-House: Contract: Miscellaneous Expenses: Rents and Leases: Advertisement: Office Supplies: Copying: Postage: Mileage: Meetings: Other (please specify}; Contingency: TOTAL ESTIMATED COST FOR PHASE _, 1989 $ 20,000 Use additional sheets as necessary to provide a cost estimate, as outlined above, for each and every phase or year of the project. Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 2 - Pool Roof/Lifeguard Chairs 7. Which, if any, operating budget(s) need to be adjusted annually as a result of this project completion? None Hoca much do you estimate the operating budget(s) will be affected (please note reduced expenditures in parenthesis)? First year personal services: $ First year other services and charges: $ First year commodities/supplies: $ First year debt services: $ Additional capital outlay-: $ First year transfers: $ First year other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.) 8. What, if any, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? $2,000 9. What, if any, is the firsty-ear estimated operating income, plus or minus, resulting from this project? None 10. What is the proposed source(s) of funding for this project? User Fees: Special Revenue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify} Grants (circle those applicable): Federal (specify) State (specify} County (specify} Other (specify) Federal Aid Urban System: Municipal State Aid: Tax Increment Financing: Other (please specify): TOTAL ESTIMATED FUNDING FOR PROJECT 20,000 20,000 11. Is this project in conformance with the Comprehensive Plan iahich has been adopted by the Planning Commission? I'es If so, indicate the page(s) of the Comp Plan that apply: 153 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible? Ice Arena Pool>CIP:Structure Today's Date: February 5, 1987 PROJECT SUMr1ARY FORM 1988 CAPITAL BUDGET AND CAPITAL IMPROVEMENT PROGRAM 1989-93 CITY OF RICHFIELD, MINNESOTA 1. Brief, descriptive name of project: Pool Structure 2. On a separate sheet, provide detail explaining the location, bacl~ground, purpose and other information about the project. Attach map or drawing, if applicable. 3.Is this project a continuation of an existing project? If so, ~Yhat is the city project number? 4. Do other projects have any relationship to this project? No If so, what is the relationship? 5. In what 3-ear(s) and with what annual cost is this project proposed to be scheduled? CIB 1988 ~ CIP 1991 CIP 1989 5 CIP 1992 60,000 CIP 1990 $ CIP 1993 6. Based on the following estimates, the cost of this project for year 1992 (as detailed in question two is: Planning and Engineering:5,500 In-House: Contract: X5,500 Acquisition of Property: Construction/Installation:53,500 In-House: $ 3,500 Contracts}; 50,000 Furnishings and Equipment; Contract(s): Quotation(s): Construction Observation: In-House: Contract: Miscellaneous Expenses:1,000 Rents and Leases: $800 Advertisement: 100 Office Supplies: 30 Copying: 40 Postage: 30 Mileage: Meetings: Other (please specify): Contingency: TOTAL ESTIMATED COST FOR PHASE , 1992 $ 60,000 Use additional sheets as necessary to provide a cost estimate, as outlined above, for each and every phase or year of the project. No Project Summary- Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City- of Richfield, Minnesota Page 2 - Pool Structure 7. Which, if any°, operating budget(s) need to be adjusted annually as a result of this project completion? None How much do y>ou estimate the operating budget(s) will be affected (please note reduced expenditures in parenthesis)? First year personal services: $ First year other services and charges: $ First year commodities/supplies: $ First year debt services: $ Additional capital outlay: $ First year transfers: $ First year other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.) 8. What, if any, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? $4,300 9. What, if any-, is the first year estimated operating income, plus or minus, resulting from this project:' None 10. What is the proposed source(s) of funding for this project': User Fees: Special Revenue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify-} Grants (circle those applicable}: Federal (specify) State (specify-? County (specify) Other (specify} Federal Aid Urban System: Municipal State Aid: Tax Increment Financing: Other (please specify): TOT.~L ESTI4IATED FUNDING FOR PROJECT 60,000 60,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? Yes If so, indicate the page(s) of the Comp Plan that apply: 153 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible? Ice Arena WLake>CIP:Improvements Today's Date: February 5, 198r PROJECT SUP~IMARY FORM 1988 CAPITAL BUDGET AND CAPITAL IMPROVEMENT PROGRAM 1989-93 CIT`i OF RICHFIELD, MINNESOTA 1. Brief, descriptive name of project: WLNC Improvements 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3. Is this project a continuation of an existing project? No If so, what is the city- project number? 4. Do other projects have any relationship to this project? iv'o If so, what is the relationship? 5. In what year(s) and with what annual cost is this project proposed to be scheduled? CIB 1988 $ CIP 1991 $ CIP 1989 S 55,000 CIP 1992 $ CIP 1990 $ CIP 1993 $ 6. Based on the following estimates, the cost of this project for year 1989 (as detailed in question two) is: Planning and Engineering:2,000 In-House: $2,000 Contract: Acquisition of Property: Construction/Installation:32,000 In-House: $ 4,000 Contract(s): 28,000 Furnishings and Equipment:17,500 Contract(s): Quotation(s): $17,500 Construction Observation: In-House: Contract: Miscellaneous Expenses:200 Rents and Leases: Advertisement: $150 Office Supplies: 20 Copying: 20 Postage: 10 Mileage: Meetings: Other (please specify): Contingency:3,300 TOTAL ESTIMATED COST FOR PHASE _, 1989 $ 55,000 Use additional sheets as necessary to provide a cost estimate, as outlined above, for each and every phase or year of the project. Project Summary- Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 2 - tr'LVC Improvements 7. Which, if any, operating budget(s) need to be adjusted annually as a result of this project completion? None How much do you estimate the operating budget(s) will be affected (please note reduced expenditures in parenthesis):' First year personal services: $ First year other services and charges: $ First year commodities/supplies: $ First ,year debt services: $ Additional capital outlay: $ First ,year transfers: $ First year other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.) 8. What, if any, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? $6,000 9. What, if any, is the first year estimated operating income, plus or minus, resulting from this project? None 10. ~v'hat is the proposed source(s) of funding for this project? User Fees: $ 10,000 Special Revenue/Revenue Sharing: $ 45,000 Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable): Federal (specify) State (specify) County (specify) Other (specify) Federal Aid L'rban System: Municipal State Aid: Tax Increment Financing: Other (please specify): TOTAL ESTIh1ATED FUNDING FOR PROJECT 55,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? Yes If so, indicate the page(s) of the Comp Plan that apply: 120 and Community- Fa.ci'ities section 133-157 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible? Wood Lake WLake>CIP:Energy Today's Date: February 5, 1987 PROJECT SUMMARY" FORM 1988 CAPITAL BUDGET AND CAPITAL IMPROVEMENT PROGRAM 1989-93 CITY OF RICHFIELD, MINNESOTA 1. Brief, descriptive name of project: WL_NC Energy Improvements 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3. Is this project a continuation of an existing project? No If so, what is the city project number? 4. Do other projects have any relationship to this project? No If so, what is the relationship? 5. In what 5-ear(s} and with what annual cost is this project proposed to be scheduled? CIB 1988 $ CIP 1991 42,000 CIP 1989 $ CIP 1992 CIP 1990 $ CIP 1993 6. Based on the following estimates, the cost of this project for year 1991 (as detailed in question two is: Planning and Engineering:1,000 In-House: $1,000 Contract: Acquisition of Property: Construction/Installation:39,000 In-House: Contract(s): $39,000 Furnishings and Equipment: Contract(s): Quotation(s): Construction Observation:500 In-House: $500 Contract: Miscellaneous Expenses:200 Rents and Leases: Advertisement: $150 Office Supplies: 20 Copying: 20 Postage: 10 Mileage: Meetings: Other (please specify): Contingency:1,300 TOTAL ESTIMATED COST FOR PHASE _, 1991 $ 42,000 Use additional sheets as necessary to provide a cost estimate, as outlined above, for each and every phase or year of the project. Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, rlinnesota Page 2 - WLNC Energv Improvements 7. Which, if any, operating budget(s) need to be adjusted annually as a result of this project completion? Wood Lake How much do you estimate the operating budget(s) will be affected (please note reduced expenditures in parenthesis)? First 5-ear personal services: $ First year other services and charges: $ (200) First year commodities/supplies: $ First ,year debt services: $ Additional capital outlay: $ First ,year transfers: $ First year other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.) Utility Savings 8. What,if anS-, is the in-house labor/equipment credit" for worki ng on this project (noted in question 6 above)? $1,500 9. What,if any, is the first year estimated operating income, plus or minus, resulting from this project?None 10. What is the proposed sources} of funding for this project? User Fees: Special Revenue/Revenue Sharing:42,000 Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable): Federal (specify) State (specify) County- ( specify) Other (specify) Federal Aid Urban System: Municipal State Aid: Tax Increment Financing: Other (please specify): TOTAL ESTIMATED FUNDING FOR PROJECT 42,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? Yes If so, indicate the page(s) of the Comp Plan that apply: Community Facilities section 133-157 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible? Wood Lake Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 3 - WLNC Energy Improvements 2. Wood Lake Nature Center is a nature interpretive facility, a special use park located at 735 Lake Shore Drive in the vicinity of 67th Street and Lyndale Avenue South. The Nature Center building(s) was designed with aesthetics rather than energy- use in mind. With its tall ceilings and expanse of windows, it will never be inexpensive to heat and cool. Some improvements have been made; i.e., weather-stripping doors and installing ceiling fans, but more can be done. The greatest energy loss is through the windows. Attempts have been made to reduce this loss by using heavy curtains which are drawn at night. However, these curtains tend to cover the air vents so the warm air blows up along the glass rather than into the room. This project proposes to install energy efficient, motorized external shutters that would be lowered at night. An additional benefit is that shutters would also add to securit3- by protecting the windows from breakage. Other energy improvements are included with the proposed project. The furnace will be 20 5-ears old and the air conditioners will be 18 years old in 1991. More efficient smaller models are now available. These should provide a long range reduction of energy consumption resulting in reduced utility costs. The estimated cast for the phases of the proposed project is: Motorized Shutters $26,000 Furnace, Air Conditioners 16,000 WLake>CIP:Dredge Today's Date: February 5, 1987 PROJECT SUMMARY FORM 1988 CAPITAL BUDGET AND CAPITAL IrIPROVEhIENT PROGRATMI 1989-93 CITY OF RICHFIELD, MINNESOTA 1. Brief, descriptive name of project: WLNC Dredging and Bridge 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3. Is this project a continuation of an existing project? No If so, what is the city project number? 4. Do other projects have any- relationship to this project? No If so, what is the relationship? 5. In what year(s) and with what annual cost is this project proposed to be scheduled? CIB 1988 $ CIP 1991 $ CIP 1989 $ CIP 1992 $ CIP 1990 $ CIP 1993 $ Beyond 1993 $ 220,000 6. Based on the following estimates, the cost of this project for year 1994+ (as detailed in question two)is: Planning and Engineering:4,000 In-House: $1,000 Contract: 3,000 Acquisition of Property: Construction/Installation:175,000 In-House: $ 25,000 Contract(s): 150,000 Furnishings and Equipment:40,000 Contract(s): $40,000 Quotation(s): Construction Observation:800 In-House: $800 Contract: Miscellaneous Expenses:200 Rents and Leases: Advertisement: $150 Office Supplies: 10 Copying: 20 Postage: 20 riileage: Meetings: Other (please specify): Contingency: TOTAL ESTIMATED COST FOR PHASE _, 1994+$ 220,000 Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 2 - WLNC Dredging and Bridge 7. Which, if any, operating budget(s) need to be adjusted annually as a result of this project completion? None How much do 3-ou estimate the operating budget(s) will be affected (please note reduced expenditures in parenthesis)? First year personal services: $ First year other services and charges: $ _ First 5-ear commodities/supplies: $ _ First year debt services: $ Additional capital outlay: $ First year transfers: $ First year other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supriy/capital outlay items needed, etc.} 8. What, if any, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? $26,800 9. What, if any, is the first 5-ear estimated operating income, plus or minus, resulting from this project? None 10. What is the proposed source(s) of funding for this project? User Fees: Special Revenue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify} Grants {circle those applicable): Federal (specify) State (specify) County (specify) Other (specify) Federal Aid Urban System: Municipal State Aid: Tax Increment Financing: Other (please specify): TOTAL ESTIMATED FUNDING FOR PROJECT 220,000 220,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? Yes If so, indicate the page(s) of the Comp Plan that apply: GommunitT: Facilities section 133-157 4 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible? Wood Lake 1 Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 3 - tv'LNC Dredging and Bridge 2. Wood Lake ~'ature Center is a 150 acre nature interpretive site, adjacent to I35W, in the vicinity of 67th Street and Lyndale ,avenue South . tv'ood Lake caas f first dredged in 1969/ i 0 with the goal of creating a diverse marsh habitat of various depths. Since then the marsh has been grocaing in and will eventually become dry land and, therefore, poor habitat if it isn't dredged again. The floating bridge which spans the marsh was completed about the same time. While some repairs have been made and there is continual maintenance, the bridge will need a major overhaul, if not replacement, by- 1994. Both the dredging and the floating bridge are included in the infrastructure study. The estimated breakdown for the aspects of the proposed project: Dredging $154,500 Floating Bridge 65,500 CCenter>CIP:Airconditioning Today-'s Date: February 5, 1987 PROJECT SUMMARY FORM 1988 CAPITAL BUDGET AND CAPITAL I`IPROVEME?v'T PROGRAM 1989-93 CITY OF RICHFIELD, MINNESOTA 1. Brief project name: Community Center Air Conditioning Unit 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3. Is this project a continuation of an existing project? No If so, what is the city project number? 4. Do other projects have any relationship to this project? No If so, what is the relationship? 5. In what year(s) and with cahat annual cost is this project proposed to be scheduled? CIB 1988 $ CIP 1991 $ CIP 1989 $ CIP 1992 $ CIP 1990 $ 35,000 CIP 1993 $ 6. Based on the following estimates, the cost of this project for year 1990 (as detailed in question two)is: Planning and Engineering:500 In-House: $500 Contract: Acquisition of Property-: Construction/Installation:34,000 In-House: Contract(s): $34,000 Furnishings and Equipment: Contract(s): Quotation(s): Construction Observation:300 In-House: Contract: Miscellaneous Expenses:200 Rents and Leases: Advertisement: $ 150 Office Supplies: 10 Copying: 20 Postage: 20 Mileage: Meetings: Other (please specify): Contingency: TOTAL ESTIMATED COST FOR PHASE 1990 $35,000 Use additional sheets as necessary to provide a cost est imate, as outlined above, for each and every phase or year of the project. Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 2 - Community Center Air Conditioning Unit 7. Which, if any, operating budget(s) need to be adjusted annually as a result of this project completion'' None How much do you estimate the operating budget(s) will be affected (please note reduced expenditures in parenthesis)? First year personal services: $ First year other services and charges: $ First year commodities/supplies: $ First year debt services: $ Additional capital outlay: $ First year transfers: $ First ,year other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.) 8. What, if any, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? $500 9. What, if any, is the first year estimated operating income, plus or minus, resulting from this project? None 10. What is the proposed source(s) of funding for this project? User Fees: Special Revenue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable): Federal (specify) State (specify) County (specify) Other (specify) Federal Aid Urban System: Municipal State Aid: Tax Increment Financing: Other (please specify}: 35,000 TOTAL ESTIMATED FUNDING FOR PROJECT $ 35,000 11. Is this project in conformance with the Comprehensive Plan cahich has been adopted by the Planning Commission? Yes If so, indicate the page(s) of the Comp Plan that apply: 153 12. Which department is responsible for the coordination of this project? Community Services Which division is responsible? Community Center CCenter>CIP:Pump Today's Date: February 5, 1987 PROJECT SUMMARY FORi~1 1988 CAPITAL BUDGET AND CAPITAL IMPROVE}TENT PROGRAM 1989-93 CITY OF RICHFIELD, MINNESOTA 1. Brief, descriptive project name: Community Center Sump Pump 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3. Is this project a continuation of an existing project? No If so, cahat is the city- project number? 4.Do other projects have any relationship to this project? Iy'o If so, what is the relationship? 5. In what years} and with what annual cost is this project proposed to be scheduled? CIB 1988 $ CIP 1991 CIP 1989 $ CIP 1992 CIP 1990 $ 12,000 CIP 1993 6. Based on the following estimates, the cost of this project for year 1990 (as detailed in question two is: Planning and Engineering:I50 In-House: X450 Contract: Acquisition of Property-:S Construction/Installation:11,500 In-House: Contract(s); $11,500 Furnishings and Equipment: Contract(s}; Quotation(s): Construction Observation:S In-House: Contract: Miscellaneous Expenses:5 50 Rents and Leases: Advertisement: Office Supplies: $10 Copying : 30 Postage: 10 Mileage: Meetings: Other (please specify): Contingency: TOTAL ESTIMATED COST FOR PHASE _, 1990 $ 12,000 Use additional sheets as necessary to provide a cost estimate, as outlined above, for each and every phase or year of the project. Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 2 - Community Center Sump Pump 7. Which, if any, operating budget(s) need to be adjusted annua115- as a result of this project completion? None How much do you estimate the operating budget(s) will be affected (please note reduced expenditures in parenthesis)? First year personal services: $ First year other services and charges: $ First year commodities/supplies: $ First year debt services: $ Additional capital outlay: $ First year transfers: $ First year other (i.e., depreciation, etc.} $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.) 8. What, if any, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? °34~0~ 9. What, if any, is the first year estimated operating income, plus or minus, resulting from this project? None 10. What is the proposed source(s) of funding for this project? tiser Fees: Special Revenue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable}: Federal (specify) State (specify) County (specify) Other (specify) Federal Aid Urban System: Municipal State Aid: Tax Increment Financing: Other (please specify): 12,000 TOTAL ESTIMATED FUNDING FOR PROJECT $ 12,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? Yes If so, indicate the page(s) of the Comp Plan that apply: 153 12. Which department is responsible for the coordination of this project? Community Services Which division is responsible? Community Center CCenter>CIP:Roof 'I`oday's Date: February 5, 1987 PROJECT SUMPIARY FORM 1988 CAPITAL BUDGET AND CAPITAL II~IPROtiE~iENT PROGRAM 1989-93 CITY OF RICHFIELD, :~1INNESOTA 1. Brief, descriptive name of project: Communitt- Center Roof 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3.Is this project a continuation of an etisting project" If so, what is the city project number? 1. Do other projects have any relationship to this project? No If =o, what is the relationship? In what 3-ear(s) and with ghat annual cost is this project proposed to be scheduled° CIB 1988 $ CIP 1991 s 11,000 CIP 1989 ~ CIP 1992 $ CIP 1990 $ CIP 1993 ~ 6. Based on the following estimates, the cost of this project for rear 1991 (as detailed in question two) is: Planning and Engineering:600 In-House: $600 Contract: Acquisition of Property: Construction/Installation:10,000 In-House: Contract(s): $10,000 Furnishings and Equipment: Contract(s): Quotation(s): Construction Observation:350 In-House: $350 Contract: liscellaneous Elpenses:50 Rents and Leases: Advertisement: Office Supplies: $10 Copying: 15 Postage: 10 Mileage: 15 Meetings: Other (please specify-) ContingencS-: TOTAL ESTI"IATED COST FOR PHASE 1991 $ 11,000 Use additional sheets as necessary to provide a cost estimate, as outlined above, for each and every phase or year of the project. o Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 2 - Community Center Roof 7. Which, if any, operating budget(s) need to be adjusted annually as a result of this project completion? None How much do you estimate the operating budget(s) will be affected (please note reduced expenditures in parenthesis)? First year personal services: $ First year other services and charges: $ First ,year commodities/supplies: $ First year debt services: $ Additional capital outlay: $ First year transfers: $ First year other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.) 8. What, if any, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? $ 950 9. What, if an3-, is the first year estimated operating income, plus or minus, resulting from this project? None 10. What is the proposed source(s) of funding for this project? User Fees: Special Revenue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable): Federal (specify) State (specify) County (specify) Other (specify) Federal Aid Urban System: Municipal State Aid: Tax Increment Financing: Other (please specify): TOTAL ESTIMATED FUNDING FOR PROJECT 11,000 11,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? Yes If so, indicate the page(s) of the Comp Plan that apply: 153 12. Which department is responsible for the coordination of this project? Community Services Which division is responsible? Community Center CCenter>CIP:Furnace Today's Date: February 5, 198r PROJECT SUMMARY FORM 1988 CAPITAL BUDGET AND CAPITAL I~•IPROVE(~IEIviT PROGRAM 1989-93 CITY OF RICHFIELD, MINNESOTA 1. Brief, descriptive project name: Community Center Furnace 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3.Is this project a continuation of an existing project? No If so, what is the city project number? 4. Do other projects have any relationship to this project? No If so, what is the relationship? 5. In what year(s) and with what annual cost is this project proposed to be scheduled? CIB 1988 $ CIP 1991 CIP 1989 $ CIP 1992 15,000 CIP 1990 $ CIP 1993 6. Based on the following estimates, the cost of this project for year 1992 (as detailed in question two is: Planning and Engineering:300 In-House: $300 Contract: Acquisition of Property: Construction/Installation:14,500 In-House: Contract(s): $14,500 Furnishings and Equipment: Contract(s): Quotation{s): Construction Observation:150 In-House: $150 Contract: Miscellaneous Expenses:50 Rents and Leases: Advertisement: Office Supplies: $15 Copying: $20 Postage: $15 Mileage: Meetings: Other (please specify): Contingency: TOTAL ESTIMATED COST FOR PHASE _, 1992 $ 15,000 Use additional sheets as necessary to provide a cost estimate, as outlined above, for each and every phase or year of the project. Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improt-ement Program 1989/93 City of Richfield, Minnesota Page 2 - Community- Center Furnace 7. Which, if any, operating budget(s) need to be adjusted annuall3- as a result of this project completion? None How much do you estimate the operating budget(s) caill be affected (please note reduced expenditures in parenthesis)? First year personal services: $ First 5-ear other services and charges: $ First year commodities/supplies: $ First year debt services: $ additional capital outlay: $ First year transfers: $ First year other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.) 8. What, if any, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? $450 9. What, if any, is the first year estimated operating income, plus or minus, resulting from this project? :vone 10. What is the proposed source(s) of funding for this project? User Fees: Special Revenue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable): Federal (specify) State ( specify-) County (specify) Other (specify) Federal Aid Urban System: Iunicipal State Aid: Tax Increment Financing: Other (please specify): TOTAL ESTIMATED FUNDING FOR PROJECT 15,000 15,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? Yes If so, indicate the page(s) of the Comp Plan that apply: 153 12. Which department is responsible for the coordination of this project? Community Services Which division is responsible? Community Center CCenter>CIP:Dishwasher Today's Date: February 5, 1987 PROJECT SUMMARY FORM 1988 CAPITAL BUDGET AND CAPITAL INIPROVEhIENT PROGRANI 1989-93 CITY OF RICHFIELD, ~1INNESOTA 1. Brief, descriptive project name: Community Center Dishwasher 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3. Is this project a continuation of an existing project? No If so, what is the city project number? 4. Do other projects have any relationship to this project? No If so, what is the relationship? 5. In what years} and with what annual cost is this project proposed to be scheduled? CIB 1988 $ CIP 1991 CIP 1989 $ CIP 1992 CIP 1990 $ CIP 1993 13,500 6. Based on the following estimates, the cost o f this project for year 1993 (as detailed in question two is: Planning and Engineering:450 In-House: $450 Contract: Acquisition of Property: Construction/Installation:12,500 In-House: $ 1,500 Contract(s): 11,000 Furnishings and Equipment: Contract(s): Quotation(s): Construction Observation:500 In-House: $500 Contract: Miscellaneous Expenses:50 Rents and Leases: Advertisement: Office Supplies: $15 Copying: 25 Postage: 10 Mileage: Meetings: Other (please specify): Contingency: TOTAL ESTIMATED COST FOR PHASE _, 1993 $ 13,500 Use additional sheets as necessary to provide a cost estimate, as outlined above, for each and every phase or year of the project. Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 2 - Community Center Dishwasher 7. Which, if any, operating budgets} need to be adjusted annually as a result of this project completion? None How much do you estimate the operating budget(s) will be affected (please note reduced expenditures in parenthesis)? First year personal services: $ First year other services and charges: $ First year commodities/supplies: $ First 5-ear debt services: $ Additional capital outlay: $ First year transfers: $ First year other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.} 8. What, if any, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? $2,450 9. What, if any, is the first year estimated operating income, plus or minus, resulting from this project? None 10. What is the proposed source(s) of funding for this project? User Fees: Special Revenue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify} Grants (circle those applicable): Federal (specify) State {specify) County (specify) Other (specify) Federal Aid Urban System: Municipal State Aid: Tax Increment Financing: Other (please specify): TOTAL ESTIMATED FUNDING FOR PROJECT 13,500 13,500 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? Yes If so, indicate the page(s) of the Comp Plan that apply: 153 12. Which department is responsible for the coordination of this project? Community Services Which division is responsible? Community Center r Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, rlinnesota Page 3 - Community Center Dishwasher 2. When the building that nova houses the Richfield Community Center at 70th and Nicollet Avenue South Baas first constructed in the earl- 1960's, a dishwasher was installed on the lotiaer level of the structure. Six ,years beyond its life expectancy, in 1986 this original dishwasher G:-as brought up to health code at a cost of $2,00. The commercial dishwashing system is required because of meals served at Congregate Dining and the rental of the facility to groups. Due to the age of the dishwasher and the difficulty getting replacement parts, it is anticipated the entire system will need to be replaced. The proposed project has been scheduled for 1993. Streets>CIP:Walls Today's Date: February 5, 198' PROJECT SUhIMARY" FORM 1988 CAPITAL BUDGET AND CAPITAL IriPROVEMENT PROGRAM 1989-93 CITI OF RICHFIELD, MINNESOTA 1. Brief, descriptive name of project:Boulevard Retaining Walls 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3. Is this project a continuation of an existing project? No If so, what is the city project number? 4. Do other projects have any relationship to this project? Yes If so, what is the relationship? See 1988 CIB 5. In what year(s) and with what annual cost is this project proposed to be scheduled? CIB 1988 $ CIP 1991 $ 25,000 CIP 1989 $ CIP 1992 $ CIP 1990 ~ CIP 1993 $ 20,000 6. Based on the following estimates, the cost of this project for phase »2, year 1991 (as detailed in question two) is: Planning and Engineering:1,500 In-House: $1,500 Contract: Acquisition of Propert3-: Gonstruction/Installation:20,000 In-House: Contract(s): $20,000 Furnishings and Equipment: Contract(s): Quotation(s): Construction Observation:1,500 In-House: $1,500 Contract: Miscellaneous Expenses:100 Rents and Leases: Advertisement: $75 Office Supplies: 10 Copying: 10 Postage: 5 Mileage: Meetings: Other (please specify): Contingency:1,900 TOTAL ESTIMATED COST FOR PHASE 2, 1991 $ 25,000 Use additional sheets as necessary to provide a cost estimate, as outlined above, for each and every phase or year of the project. Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 2 - Boulevard Retaining jtialls 7. Which, if any, operating budget(s) need to be adjusted annually as a result of this project completion? None How much do 3-ou estimate the operating budget(s) will be affected (please note reduced expenditures in parenthesis)? First 3-ear personal services: $ First rear other services and charges: $ First year commodities/supplies: $ First year debt services: $ Additional capital outlay: $ First year transfers: $ First ,year other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.) 8. What, if any-, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? $5,000 9. What, if an,y, is the first year estimated operating income, plus or minus, resulting from this project? None 10. What is the proposed source(s) of funding for this project? User Fees: Special Revenue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable): Federal (specify) State (specify) County (specify) Other (specify) Federal Aid Urban System: Municipal State Aid: Tax Increment Financing: Other (please specify): TOTAL ESTI`1ATED FUNDING FOR PROJECT 45,000 S 45,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted b5- the Planning Commission? Yes If so, indicate the page(s) of the Comp Plan that apply: 158 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible? Street Mtc Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Aiinnesota Page 3 - Boulevard Retaining Walls 6. Based on the following estimates, the cost of this project for phase #3, year 193 (as detailed in question tw o) is: Planning and Engineering:1,000 In-House: 51,000 Contract: Acquisition of Property: Construction/Installation:17,000 In-House: Contract(s): $17,000 Furnishings and Equipment: Contract(s): Quotation(s): Construction Observation:1,000 In-House: $1,000 Contract: Miscellaneous Expenses:100 Rents and Leases: Advertisement: $75 Office Supplies: 10 Copying: 10 Postage: 5 Mileage: Meetings: Other (please specify): Contingency-:900 TOTAL ESTIMATED COST FOR PHASE #3, 1993 $ 20,000 Streets>CIP:Asphalt Todai-'s Date: February 5, 1987 PROJECT SL'*~1hIARY FORh1 1988 CAPITAL BUDGET AND CAPITAL IMPROVEMENT PROGRAM 1989-93 CITE OF RICHFIELD, MINNESOTA 1. Brief, descriptive name of project: Asphalt Boulevards 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3. Is this project a continuation of an existing project? No If so, what is the city- project number? 4. Do other projects have any relationship to this project? No If so, cahat is the relationship? 5. In what ,year(s) and with what annual cost is this project proposed to be scheduled? CIB 1988 $ CIP 1991 $ CIP 1989 ~ CIP 1992 $48,000 CIP 1990 $ CIP 1993 $ 6. Based on the follocaing estimates, the cost o f this project for year 1992 (as detailed in question two)is: Planning and Engineering:2,000 In-House: 52,000 Contract: Acquisition of Prap~rty: Construction/Installation:41,000 In-House: Contract(s): 541,000 Furnishings and Equipment: Contract(s): Quotation(s): Construction Observation:2,000 In-House: 52,000 Contract: Miscellaneous Expenses:200 Rents and Leases: Advertisement: $150 Office Supplies: 15 Copying: 20 Postage: 15 Mileage: Meetings: Other (please specify): Contingency:2,800 TOTAL ESTIMATED COST FOR PHASE _, 1992 $ 48,000 Use additional sheets as necessar3T to provide a cost estimate, as outlined above, for each and every phase or year of the project. Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 2 - Asphalt Boulevards 7. Which, if any, operating budget(s) need to be adjusted annually as a result of this project completion? None How much do you estimate the operating budget(s) will be affected (please note reduced expenditures in parenthesis)? First year personal services: $ First rear other services and charges: $ First year commodities/supplies: $ First year debt services: $ Additional capital outlay: $ First year transfers: $ First year other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.) 8. What,if any, is the in-house labor/equipment credit" for worki ng on this project (noted in question 6 above)? $4,000 9. What,if any, is the first year estimated ope rating income, plus or minus, resulting from this project?None 10. What is the proposed source(s) of funding for this project? User Fees: Special Revenue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable): Federal (specifyy) State (specify) County {specify) Other (specify) Federal Aid Urban System: Municipal State Aid:48,000 Tax Increment Financing: Other (please specify): TOTAL ESTIMATED FUNDING FOR PROJECT 48,000 11. Is this project in conformance with the Comprehensive Plan c~hich has been adopted by the Planning Commission? Yes If so, indicate the page(s) of the Comp Plan that apply: 158 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible? Street Mtc Engineering>CIP:Penn/I494/76Today's Date: FebruarS> 5, 1987 PROJECT SU~1h1ARY FORM 1988 CAPITAL BUDGET AND CAPITAL IMPROVEh1ENT PROGRAM 1989-93 CITY OF RICHFIELD, ~IIN~ESOTA 1. Brief, descriptive name of project: Penn/I494-76th Street 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3. Is this project a continuation of an existing project? No If so, what is the city project number? 4. Do other projects have anS> relationship to this project? No If so, what is the relationship? 5. In what year(s) and with what annual cost is this project proposed to be scheduled? CIB 1988 ~ CIP 1991 $ CIP 1989 S 5,000,000 CIP 1992 $ CIP 1990 ~ CIP 1993 $ 6. Based on the following estimates, the cost of this project for year 1989 (as detailed in question tc.-o)is: Planning and Engineering:800,000 In-House: S 20,000 Contract: 780,000 Acquisition of Property:500,000 Construction/Installation:3,700,000 In-House: Contract(s): $3,700,000 Furnishings and Equipment: Contract(s): Quotation(s): Construction Observation: In-House: Contract: Miscellaneous Expenses: Rents and Leases: Advertisement: Office Supplies: Copying: Postage: Mileage: Meetings: Other (please specif;.>): Contingency: TOTAL ESTIMATED COST FOR PHASE _, 1989 ~ 5,000,000 Use additional sheets as necessary to provide a cost estimate, as outlined above, for each and every phase or year of the project. Project SummarS- Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 2 - Penn/I494-76th Street 7. Which, if any, operating budget(s) need to be adjusted annually as a result of this project completion? v'one Ho~a much do ,you estimate the operating budget(s) will be affected (please note reduced expenditures in parenthesis)? First year personal services: $ First 3-ear other services and charges: $ First year commodities/supplies: $ First year debt services: $ Additional capital outlay: $ First year transfers: $ First year other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdocan of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.} 8. What, if any, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? X20,000 9. What, if any, is the first year estimated operating income, plus or minus, resulting from this project? None 10. What is the proposed source(s) of funding for this project? User Fees: Special Revenue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable): Federal (specify) State (specify) County, Hennepin $1,000,000 Other (specify) Federal Aid Urban System: Municipal State Aid: Tax Increment Financing: Other: City of Bloomington TOTAL ESTIMATED FUNDING FOR PROJECT 1,000,000 3,000,000 550,000 450,000 5,000,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? I'es If so, indicate the page(s) of the Comp Plan that apply: 195 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible?Engineering A Engineering>CIP:Railroad Today's Date: February 5, 1987 PROJECT SU~IrIARY FORM 1988 CAPITAL BUDGET AND CAPITAL IMPROVE~IENT PROGRAM 1989-93 CITY OF RICHFIELD, CIINNESOTA 1. Brief, descriptive name of project: Railroad Signals 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3. Is this project a continuation of an existing project? No If so, cahat is the city project number? 4. Do other projects have any relationship to this project? No If so, cahat is the relationship? _ 5. In what 3~ear(s) and c.*ith what annual cost is this project proposed to be scheduled? CIB 1988 S CIP 1991 CIP 1989 ~ CIP 1992 CIP 1990 $ 70,000 CIP 1993 6. Based on the following estimates, the cost of this project for year 1990 (as detailed in question two i s: Planning and Engineering: In-House: Contract: Acquisition of Property: Construction/Installation:70,000 In-House: Contract(s): $10,000 Furnishings and Equipment: Contract(s): Quotation{s): Construction Observation: In-House: Contract: Miscellaneous Expenses: Rents and Leases: Advertisement: Office Supplies: Copying: Postage: Mileage: Meetings: Other (please specify}: Contingency: TOTAL ESTIMATED COST FOR PHASE _, 1990 $ 70,000 Use additional sheets as necessary to provide a cost estimate, as outlined above, for each and every phase or year of the project. Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 2 - Railroad Signals 7. Which, if any, operating budget(s) need to be adjusted annually as a result of this project completion? None How much do rou estimate the operating budget(s) will be affected iplease note reduced expenditures in parenthesis)? First rear personal services: $ First 5-ear other services and charges: $ First year commodities/supplies: $ First year debt services: $ Additional capital outlay: $ First year transfers: $ First year other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.) 8. What, if any, is the in-house labor/equipment "credit" for working on this project {noted in question 6 above)? None 9. What, if an3~, is the first year estimated operating income, plus or minus, resulting from this project? None 10. What is the proposed source(s) of funding for this project? User Fees: Special Revenue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable): Federal (specify) Program Unknown State (specify) County (specify) Other (specify) Federal Aid Urban System: Municipal State Aid: Tax Increment Financing: Other (please specify-): TOTAL ESTI:~}ATED FUNDING FOR PROJECT 70,000 70,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? Yes If so, indicate the page(s) of the Comp Plan that apply: 198 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible?Engineering Engineering>CIP:Bus Today's Date: February 5, 1987 PROJECT SUM?~1ARY FORM 1988 CAPITAL BUDGET AND CAPITAL I`SPROVEMENT PROGRAM 1989-93 CITY OF RICHFIELD, MINNESOTA 1. Brief, descriptive project name: 66th Street Bus Turnaround 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3.Is this project a continuation of an existing project? No If so, what is the city- project number? 4. Do other projects have any relationship to this project? No If so, what is the relationship? 5. In what year(s) and with what annual cost is this project proposed to be scheduled? CIB 1988 S CIP 1991 $ CIP 1989 S CIP 1992 $ CIP 1990 S -10 , 000 CIP 1993 $ 6. Based on the following estimates, the cost of this project for year 1990 (as detailed in question two) i s: Planning and Engineering:6,000 In-House: 56,000 Contract: Acquisition of Property: Construction/Installation:34,000 In-House: Contract(s): $34,000 Furnishings and Equipment: Contract(s): Quotation(s): Construction Observation: In-House: Contract: Miscellaneous Expenses: Rents and Leases: Advertisement: Office Supplies: Copying: Postage: Mileage: Meetings: Other (please specify-}: Contingency: TOTAL ESTIMATED COST FOR PHASE _, 1990 $ 40,000 Use additional sheets as necessary to provide a cost estimate, as outlined above, for each and every phase or year of the project. Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 2 - 66th Street Bus Turnaround 7. Which, if any, operating budget{s) need to be adjusted annually as a result of this project completion? None How much do you estimate the operating budget(s) will be affected {please note reduced expenditures in parenthesis)? First year personal services: $ First year other services and charges: $ First year commodities/supplies: $ First year debt services: $ Additional capital outla3T; $ First year transfers: $ First year other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply-/capital outlay items needed, etc.) 8. What, if any, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? $6,000 9. What, if any, is the first year estimated operating income, plus or minus, resulting from this project? None 10. What is the proposed source(s) of funding for this project? User Fees: Special Revenue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable): Federal (specify) State (specify} County (specify) Other (specify) Federal Aid Urban S3-stem: Municipal State Aid: Tax Increment Financing: Other (please specify-): TOTAL ESTIy1ATED FUNDING FOR PROJECT 5 40,000 40,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? Yes If so, indicate the page{s} of the Comp Plan that apply: 216 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible?Engineering Engineering>CIP:Portland/66 Today's Date: February 5, 1987 PROJECT SUMMARY FORM 1988 CAPITAL BUDGET AND CAPITAL IMPROVEMENT PROGRAM 1989-93 CITY OF RICHFIELD, MINNESOTA 1. Brief, descriptive project name: Portland/66th Intersection 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3. Is this project a continuation of an existing project? No If so, what is the city project number? 4. Do other projects have any relationship to this project? No If so, what is the relationship? 5. In what year(s) and with what annual cost is this project proposed to be scheduled? CIB 1988 $ CIP 1991 CIP 1989 $ CIP 1992 CIP 1990 $ 1,000,000 CIP 1993 6. Based on the follo~.~ing estimates, the cost of this project for year 1990 (as detailed in question two i s: Planning and Engineering:150,000 In-House: $ 15,000 Contract: 135,000 Acquisition of Property:200,000 Construction/Installation:650,000 In-House: Contract(s): $650,000 Furnishings and Equipment: Contract(s): Quotation(s): Construction Observation: In-House: Contract: Miscellaneous Expenses: Rents and Leases: Advertisement: Office Supplies: Copying: Postage: Mileage: Meetings: Other (please specify): Contingency: TOTAL ESTIriATED COST FOR PHASE _, 1990 $ 1,000,000 Use additional sheets as necessary to provide a cost estimate, as outlined above, for each and every phase or year of the project. Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 2 - Portland/66th Intersection 7. Which, if any, operating budget{s) need t;o be adjusted annuall3- as a result of this project completion? None How much do you estimate the operating budgets} will be affected (please note reduced expenditures in parenthesis)? First year personal sere-ices: $ First year other services and charges: $ First year commodities/supplies: $ First year debt services: $ Additional capital outlay: $ First year transfers: $ First year other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.) 8. What, if an3-, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? $15,000 9. What, if any, is the first 3-ear estimated operating income, plus or minus, resulting from this project? None 10. What is the proposed source(s) of funding for this project? L'ser Fees Special Revenue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable): Federal (specify} State (specifyy-) County, Hennepin: $750,000 Other (specify-) Federal Aid Urban S3-stem: funicipal State Aid: Tax Increment Financing: Other (please specify-): 750,000 250,000 TOTAL ESTIMATED FL'NDI\G FOR PROJECT $ 1 , 000 , 000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? Yes If so, indicate the page(s) of the Comp Plan that apply: 195 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible?Engineering Engineering>CIP:Frontage Today's Date: February 5, 1987 PROJECT SUMMARY" FORri 1988 CAPITAL BUDGET .YND CAPIT.YL I~IPROVErIENT PROGRAi~1 1989-93 CITY' OF RICHFIELD, MINNESOTA 1. Brief, descriptive project name:Frontage Road Reconstruction 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3. Is this project a continuation of an existing project? No If so, what is the city project number? 4.Do other projects have any relationship to this project? No If so, what is the relationship? 5. In what year(s) and with what annual cost is this project proposed to be scheduled? CIB 1988 $ CIP 1991 275,000 CIP 1989 $ CIP 1992 275,000 CIP 1990 $ 275,000 CIP 1993 275,000 6. Based on the following estimates, the cost of this project for phase #1, year 1990 (as detailed in qu estion two) is: Planning and Engineering:37,500 In-House: $37,500 Contract: Acquisition of Property: Construction/Installation:237,500 In-House: Contracts}; $237,500 Furnishings and Equipment: Contract(s): Quotation(s): Construction Observation: In-House: Contract: Miscellaneous Expenses: Rents and Leases: Advertisement: Office Supplies: Copying: Postage: Mileage: Meetings: Other (please specify): Contingency: TOTAL ESTI?~IATED COST FOR PHASE #1, 1990 $ 275,000 Use additional sheets as necessary to provide a cost estimate, as outlined above, for each and every phase or year of the project. Project Summary Form Today's Date: February 5, 1981 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 2 - Frontage Road Reconstruction 7. Which, if any, operating budget(s) need to be adjusted annually as a result of this project completion? None How much do you estimate the operating budget(s) c.ill be affected (please note reduced expenditures in parenthesis)? First year personal services: $ First rear other services and charges: ~ First year commodities/supplies: $ First year debt services: $ Additional capital outlay-: $ First year transfers: $ First year other (i.e., depreciation, etc.) ~ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.) 8. What, if any, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)?$150,000 9. What, if any, is the first year estimated operating income, plus or minus, resulting from this project? None 10. What is the proposed source(s) of funding for this project? User Fees: Special Revenue/Revenue Sharing: Bonds (indicate those applicable) General Obligation/Revenue Special Assessment $130,000 Other (specify) Grants (circle those applicable}: Federal (specify} State (specify) MNDoT County (specify) Other (specify) Federal Aid Urban System: Municipal State Aid: Tax Increment Financing: Other (please specify): 130,000 350,000 620,000 TOTAL ESTIMATED FUNDING FOR PROJECT ~ 1,I00,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? Yes If so, indicate the page(s) of the Comp Plan that apply: 214 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible?Engineering Project SummarS- Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 CitS- of Richfield, Minnesota Page 3 - Frontage Road Reconstruction 6. Based on the following estimates, the for phase n2, ,y-ear 1991 (as det;ailed Planning and Engineering: In-House: X37,500 Contract: Acquisition of Property: Construction/Installation: In-House: Contract(s): $237,500 Furnishings and Equipment: Contract(s): Quotation(s): Construction Observation: In-House: Contract: Miscellaneous Expenses: Rents and Leases: Advertisement: Office Supplies: Copying: Postage: Mileage: Meetings: Other (please specify): Contingency: cost of this project in question two) is: 37,500 237,500 TOTAL ESTIMATED COST FOR PHASE #2, 1991 $ 275,000 Project Summary Form Toda~-'s Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989J93 City of Richfield, Minnesota Page ~ - Frontage Road Reconstruction 6. Based on the following estimates, the for phase ~3, year 1992 (as detailed Planning and Engineering: In-House: S37,500 Contract: Acquisition of Property-: Construction/Installation: In-House: Contract(s): $237,500 Furnishings and Equipment: Contract(s): Quotation(s): Construction Observation: In-House: Contract: Miscellaneous Expenses: Rents and Leases: Advertisement: Office Supplies: Copying: Postage: Mileage: Meetings: Other (please specify): Contingency: cost of this project in question two} is: 37,500 237,500 TOTAL ESTITMIATED COST FOR PHASE #3, 1992 $ 275,000 Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 5 - Frontage Road Reconstruction 6. Based on the following estimates, the for phase =;4, year 1993 (as detailed Planning and Engineering: In-House: $3'i,500 Contract: Acquisition of Property: Construction/Installation: In-House: Contract(s): $237,500 Furnishings and Equipment: Contract(s): Quotation(s): Construction Observation: In-House: Contract: Miscellaneous Expenses: Rents and Leases: Advertisement: Office Supplies: Copying: Postage: Mileage: Meetings: Other (please specify): Contingency: cost of this project in question two} is: 37,500 237,500 TOTAL ESTIMATED COST FOR PHASE r4, 1993 $ 275,000 1~ Engineering>CIP:Streets Toda~-'s Date: February 5, 1981 PROJECT SU~iMARI' FORM 1988 CAPITAL BUDGET AND CAPITAL IMPROVEMENT PROGRAi~1 1989-93 CITY OF RICHFIELD, MINNESOTA 1. Brief, descriptive name of project: Resurface Streets 2,. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3. Is this project a continuation of an existing project? No If so, what is the city project number? 4. Do other projects have any relationship to this project? No If so, what is the relationship? 5. In what year(s) and with what annual cost is this project proposed to be scheduled? CIB 1988 $ CIP 1991 CIP 1989 $ CIP 1992 CIP 1990 $ CIP 1993 1,000,000 Beyond 1993 9,000,000 6. Based on the follocaing estimates, the cost of this project for ,y-ears 1993 and be~-ond (as detailed in question two) is: Planning and Engineering: In-House: Contract: Acquisition of Property: Construction/Installation: In-House: Contract(s): Furnishings and Equipment: Contracts}: Quotations}: Construction Observation: In-House: Contract: Miscellaneous Expenses: Rents and Leases: Advertisement: Office Supplies: Copying: Postage: Mileage: Meetings: Other {please specify): Contingency: TOTAL ESTIMATED COST FOR PHASE _, 1993+ $10,000,000 Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 2 - Resurface Streets 7. Which, if an3-, operating budgets} need to be adjusted annually as a result of this project completion? None How much do you estimate the operating budgets} will be affected (please note reduced expenditures in parenthesis)? First year personal services: $ First year other services and charges: $ First year commodities/supplies: $ First year debt services: $ Additional capital outlay: $ First year transfers: $ First year other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply-/capital outlay items needed, etc.) 8. What, if any, is the in-house labor/equipment "credit" for caorking on this project (noted in question 6 above)? N/A 9. 10 trhat, if any, is the first year estimated operating income, plus or minus, resulting from this project? None tdhat is the proposed source(s) of funding for this project? User Fees: Special Revenue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment $7,000,000 Other (specify) Grants (circle those applicable): Federal (specify) State (specify} County (specify) Other (specify) Federal Aid Urban System: Municipal State Aid: Tax Increment Financing: Other (please specify): TOTAL ESTIMATED FU?vTDING FOR PROJECT 7,000,000 3,000,000 10,000,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted b5- the Planning Commission? des If so, indicate the page(s) of the Comp Plan that apply: 211 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible?Engineering Project Summary Form Today's Date: February 5, 198i 1988 Capital Budget and Capital Improvement Program 1989/93 CitS- of Richfield, Minnesota Page 3 - Resurface Streets 2. Life expectancy of Richfield's residential streets is about 20 rears. The existing streets were constructed between 1912 and 1917. This means the first resurfacing may be needed in the early 1990's. The city staff is investigating state-of-the-art methods for maintaining and resurfacing streets. The condition has been monitored since construction. However, nondestructive testing and computerized record ~ieeping will help determine the optimum time for resurfacing. This street resurfacing will likely be the next major improvement to directly affect the general residential population. Major funding will be needed through special assessments. Streets>CIP:Cover Today's Date: February- 5, 1987 PROJECT SUMriARY FORM 1988 CAPITAL BUDGET AND CAPITAL IMPRO~E~IENT PROGRA~1 1989-93 CITY OF RICHFIELD, `1INNESOTA 1. Brief, descriptive name of project: Salt Storage Cover 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3. Is this project a continuation of an existing project? Yes If so, what is the city project number? See 1988 CIB 4. Do other projects have any relationship to this project? No If so, what is the relationship? 5. In what year(s) and with what annual cost is this project proposed to be scheduled? CIB 1988 $ CIP 1991 $ CIP 1989 $ 6,000 CIP 1992 $ CIP 1990 $ CIP 1993 $ 6. Based on the following estimates, the cost of this project for phase ~2, year 1989 (as detailed in question two) is: Planning and Engineering:175 In-House: $175 Contract: Acquisition of Property:N/A Construction/Installation:5,250 In-House: Contract(s): $5,250 Furnishings and Equipment:N/A Contract(s): Quotation(s): Construction Observation:250 In-House: $250 Contract: Miscellaneous Expenses:75 Rents and Leases: Advertisement: Office Supplies: $15 Copying: $30 Postage: $20 Mileage: Meetings: Computer: $10 Contingency:250 TOTAL ESTIMATED COST FOR PHASE #2, 1989 $ 6,000 Lse additional sheets as necessary to provide a cost estimate, as outlined above, for each and every phase or year of the project. Project Summar3- Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 CitS- of Richfield, :Minnesota Page 2 - Salt Storage Cover 7. Which, if an3-, operating budget(s) need to be adjusted annually as a result of this project completion? None How much do you estimate the operating budget(s) will be affected (please note reduced expenditures in parenthesis)? First 3-ear personal services: $ First year other services and charges: $ First year commodities/supplies: $ First year debt services: $ Additional capital outlay: $ First year transfers: $ First year other {i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply-/capital outlay items needed, etc.) 8. What, if any-, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? $425 9. What, if any, is the first year estimated operating income, plus or minus, resulting from this project? None 10. What is the proposed source(s) of funding for this project? L`ser Fees Special Revenue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable) Federal (specify) State ( specify-) County (specify) Other (specify) Federal Aid Urban SS-stem: Municipal State Aid: Tax Increment Financing: Other (please specify-): TOTAL ESTI`1ATED FtiNDING FOR PROJECT 6,000 6,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? Yes If so, indicate the page(s) of the Comp Plan that apply: 151 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible? Street Mtc Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, 4Tinnesota Page 3 - Salt Storage Cover 2. At the Central Garage, located as indicated on the attached map at i7th Street and Pillsbury Avenue South, there are two storage facilities, one for salt and the other for sa.l.t and sand mixtures used for ice control during the winter season. The salt material has a building referred to as the "Salt Shed". This keeps the salt from absorbing moisture during rain or heavy wet snows ~,~hich make the salt virtually impossible to use. The second mixture of salt and sand is currently stored outside in a three sided bin with no cover, leaving it exposed to rain and snow t:hich, in turn, causes leaching of the salt from the mixture and a salt brine runoff. This project proposes to cover this area to protect this commodity from the elements and thereby comply with the Environmental Pollution Control regulations. Buildings>CIP:Energy Today's Date: February ~, 198i PROJECT SU:~Iy1ARY FORA 1988 CAPITAL BUDGET AND CAPITAL IhIPROVEMENT PROGRAM 1989-93 CITY OF RICHFIELD, MINNESOTA 1. Brief, descriptive name of project: Energy Improvements 2. On a separate sheet, provide detail e:~plaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3. Is this project a continuation of an existing project? I'es If so, what is the city project number? City Project i5~0 4.Do other projects have any relationship to this project? ~o If so, ghat is the relationship? 5. In what year(s) and with what annual cost is this project proposed to be scheduled? CIB 1988 S CIP 1991 10,000 CIP 1989 5 10,000 CIP 1992 10,000 CIP 1990 $ 10,000 CIP 1993 10,000 6. Based on the following estimates, the cost of this project for year 1989 (as detailed in question tt:o is: Planning and Engineering:300 In-House: $300 Contract: Acquisition of Property: Construction/Installation:9,000 In-House: $ 650 Contract(s): 8,350 Furnishings and Equipment:S Contracts}; Quotation(s): Construction Observation:50 In-House: $50 Contract: Miscellaneous Expenses: Rents and Leases: Advertisement: Office Supplies: Copying: Postage: Ti leage Meetings: Other (please specify): Contingency:650 TOTAL ESTIMATED COST FOR PHASE _, 1989 $ 10,000 Use additional sheets as necessary to provide a cost estimate, as outlined above, for each and every phase or year of the project. Project Summary Form Today's Date: February ~, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, `iinnesota Page 2 - Energy Impro~-ements 7. ~tihich, if an5-, operating budget(s) need to be adjusted annually as a result of this project completion? Gov. Bldgs How much do 3-ou estimate the operating budget{s) will be affected (please note reduced expenditures in parenthesis)? First year personal services: $ First year other services and charges: S (1,000) First year commodities/supplies: $ First 3-ear debt services: $ Additional capital outlay-: $ First year transfers: S First year other (i.e., depreciation, etc.) S On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.} Utility Savings 8. What, if any-, i `.he in-house labor/equipment "credit" for working on this project (noted in question 6 above)? $5,000 9. what, if any, is the first year estimated operating income, plus or mii.us, resulting from this project? `one 10. 4vhat is the proposed source{s) of funding for this project? User Fees: ~ Special Revenue/Revenue Sharing: S 50,000 Bonds (circle those applicable): $ General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable): $ Federal (specify) State (specify) County- ( specify-) Other (specify) Federal Aid L"rban System: $ Municipal State Aid: $ Ta;c Increment Financing: $ Other (please specify): $ TOTAL ESTI`IATED FU\DI~G FOR PROJECT $ 50,000 11. Is this project in conformance c~ith the Comprehensive Plan cahich has been adopted by the Planning Commission? Yes If so, indicate the page(s) of the Comp Plan that apply: 150 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible? Gov. Bldgs Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, :Minnesota Page ~ - Energy Improvements 6. Based on the folloc.=ing estimates, the cost of this project for rear 1990 (as detailed in question two) is: Planning and Engineering:300 In-House: X300 Contract: Acquisition of Property:s Construction/Installation:9,000 In-House: ~ 650 Contract(s): 8,350 Furnishings and Equipment: Contract(s): Quotation(s): Construction Observation:0 In-House: X50 Contract: Miscellaneous E:~penses: Rents and Leases: Advertisement: Office Supplies: Copying: Postage: Mileage: Meetings: Other (please specify): Contingency:650 TOTAL ESTIMATED COST FOR PHASE _, 1990 10,000 Pro.}ect Summary Form Toda,y-'s Date: February ~, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 Cit3- of Richfield, Minnesota Page ~ - Energy- Improvements 6. Based on the following estimates, the cost of this project for rear 1991 (as detailed in question two) is: Planning and Engineering:300 In-House: X300 Contract: Acquisition of PropertS-: Construction/Installation:9,000 In-House: $ 650 Contracts}: 8,350 Furnishings and Equipment: Contracts}: Quotation(s): Construction Observation:50 In-House: S50 Contract: Miscellaneous Expenses: Rents and Leases: Advertisement: Office Supplies: Copying: Postage: Mileage: Meetings: Other (please specify): Contingency:650 TOTAL ESTIMATED COST FOR PHASE _, 1991 $ 10,000 Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, `iinnesota Page 6 - Energy Improvements 6. Based on the following estimates, the for year 1992 (as detailed in question Planning and Engineering: In-House: 5300 Contract: Acquisition of Propert3-: Construction/Installation: In-House: S r;50 Contract(s): 8,350 Furnishings and Equipment: Contract(s): Quotation(s): Construction Observation: In-House: `350 Contract: Miscellaneous Expenses: Rents and Leases: Advertisement: Office Supplies: Copying: Postage: Mileage: Meetings: Other (please specify): Contingenc3-: cost of this project two) is: S 300 9,000 50 5 650 TOTAL ESTIMATED COST FOR PHASE _, 1992 $ 10,000 Project Summar3r Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 7 - Energy Improvements 6. Based on the following estimates, the cost of this project for year 1993 (as detailed in question two) is: Planning and Engineering:300 In-House: 5300 Contract: Acquisition ~:~f Property-: Construction/Installation:9,000 In-House: $ 650 Contract(s): 8,350 Furnishings and Equipment: Contract(s): t~uotation(s): Construction Observation:50 In-House: $50 Contract: tiliscellaneous E:.penses: Rents and Leases: advertisement: Office Supplies: Copying: Postage: 41i leage Meetings: Other (please specify-); Contingency:650 TOTAL ESTIMATED COST FOR PHASE _, 1993 $ 10,000 Buildings>CIF:Fire/Boiler TodaS-'s Date: Febrt.iary 5, 1987 PROJECT SL:~I~IARI' FOP, `1 1958 CAPITAL BliDGET .-AND C:~PIT.~I. I~1PRO~~E:`IE':v'T PROGRAM 1989-93 CITY OF RICHFIELD, MINNESOTA 1. Brief, descripti.-e name of project: Fire Station II Boiler 2, On a separate sheet, pro~-ide detail explaining the location, background, purpose and other information about the project. attach map or drawing, if applicable. 3. Is this project a continuation of an existing project? No If so, what is the city project number? Do other projects have any relationship to this project`' '~To If so, ~~~hat is the relationship? In what years} and with what annual cost is this project proposed to be scheduled? CIB 1988 S CIP 1991 25,000 CIP 1989 5 CIP 1992 CIP 1990 ~ CIP 1993 6. Based on the following estimates, the cost of this project for rear 1991 (as detailed in question t~~o is: Plannin, end Engineering:00 In-House: $500 Contract: Acquisition of PropertS-: Construction/Installation:5,000 In-House: Contract(s): $5,000 Furnishings and Equipment:17,000 Contract(s): $11,000 Quotation(s): Construction Observation:500 In-House: $500 Contract: Miscellaneous Expenses:500 Rents and Leases: 5200 Advertisement: 150 Office Supplies: 50 Copying: 50 Postage: 50 Mileage: Meetings: Other (please specify): Contingency:500 TOTAL ESTIMATED COST FOR PHASE 1991 $ 25,000 L"use additional sheets as necessary to provide a cost estimate, as outlined above, for each and ever3T phase or year of the project. Project Summary- Form Toda,y-' s Date : February 5 , 198 r 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 2 - Fire Station II Boiler 7. Which, if any, operating budget(s) need to be adjusted annually as a result of this project completion? tione How much do you estimate the operating budget(s) will be affected (please note reduced expenditures in parenthesis)? First year personal sere-ices: ~ First year other services and charges: $ First 5-ear commodities/supplies: ~ First 3-ear debt services: $ additional capital outlay: ~ First year transfers: S First year other (i.e., depreciation, etc.) ~ On a separate sheet of paper, provide a breakdown of any- items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.) 8. What, if an3-, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? $1,200 9. What, if anS-, is the first year estimated operating income, plus or minus, resulting from this project? \one 10. What is the proposed source(s) of ftanding for this project? LTser Fees Special Revenue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable): Federal (specify-} State (specify) Count3- ( specify-) Other (specify} Federal aid Urban System: Municipal State :~,id: Ta:c Increment Financing: Other (please specify-): M 25,000 TOTAL ESTI~1aTED FL\DI:~G FOR PROJECT ~ 25,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? Yes If so, indicate the page(s) of the Comp Plan that apply: 150 t 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible? Gov. Bldgs J Buildings>CIP:Doors TodaS-'s Date: February ~, 1987 PROJECT St'~1MARY FOR~`1 1988 CAFITAL BUDGET Av'D C.~PIT.=~L I~iPRO~ E^IE:vTT PROGR:~~1 1989-93 CITY OF RICHFIELD, ~~IINNESOTA 1. Brief, descr.i.ptive name of project: Garage Overhead Doors 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project, Attach map or drawing, if applicable. 3. Is this project a continuation of an existing project? '~o If so, what is the cit3- project number? 4. Do other projects have any relationship to this project' '~o If so, shat is the relationship? 5. In what year(s) and with what annual cost is this project proposed to be scheduled? CIB 1988 $ CIP 1991 $ 44,000 CIP 1989 $ CIP 1992 $ CIP 1990 $ CIP 1993 $ 6. Based on the following estimates, the cost of this project for year 1991 (as detailed in question two)is: Planning and Engineering:100 In-House: 5400 Contract: Acquisition of Property: Construction/Installation:42,500 In-House: $ 1,000 Contracts}: 41,500 Furnishings and Equipment: Contract(s): Quotation(s): Construction Observation:100 In-House: $100 Contract: liscellaneous Expenses: Rents and Leases: Advertisement: Office Supplies: Copying: Postage: Mileage: Meetings Other (please specify): Contingency:1,000 TOTAL ESTIMATED COST FOR PHASE _, 1991 $ 44,000 Use additional sheets as necessary to provide a cost estimate, as outlined above, for each and every phase or year of the project. Project Summary Form 'Today's Date: Februar3. 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 2 - Garage Overhead Doors 7. [which, if any, operating budget(s) need to be adjusted annually as a result of this project completion? ~~one How much do you estimate the operating budget(s) will be affected (please note reduced expenditures in parenthesis)? First year personal services: ~ First year other sere-ices and charges: ~ First year commodities/supplies: ~ First year debt services: Additional capital outlay-: W First year transfers: S First year other (i.e., depreciation, etc.) On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.) 8. [what, if any, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? $1,500 9. +~hat, if an;,-, is the first year estimated operating income, plus or minus, resulting from this project? 'wone 10. [chat is the proposed source(s) of funding for this project? user Fees: Special Revenue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable): Federal (specify) State (specify-) Count3- (specify) Other (specify-) Federal Aid Lrban System: Municipal State Aid: Tax Increment Financing: Other (please specify-): TOTAL ESTIhiATED FliivTDING FOR PROJECT 44,000 44,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? Yes If so, indicate the page(s) of the Comp Plan that apply: 150 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible? Gov. Bldgs Buildings>CIP:CH/Boiler TodaS-'s Date: February ~, 1987 PROJECT SL~I:`iARI FORA 1988 CAPITAL BUDGET ADD CAPITAL IMPROVEMENT FROGRAi'I 1989-93 CITI' OF R.iC'riFIELD, ~1INNESOTA 1. Brief, descriptive name of project: City Hall Boiler 2. On a separate sheet, provide detail etplaining the location, background, purpose anc'•_ ot.lier information about the project. Attach map or drat.-irig, ii applicable. 3. Is this project a continuation of an etiisting project'' No If so, chat is the cit3- project number? 4.Do other projects have any relationship to this project:' ;~~o If so, :hat is the relationship? 5. In what gear(s) and with what annual cost is this project proposed to be scheduled? CIS 1988 S CIP 1991 CIP 1989 S CIP 1992 1_5,000 CIP 1990 S CIP 1993 6. i3ased on the folloc~ing estimates, the cost of t)iis project for rear 1992 (as detailed in question two is: Planning and Engineering:4C0 In-House: G-400 Contract: Acquisition of Propertz-: Construction/Installation:30,000 In-House: S 400 Contract(s): 29,600 Furnishings and Equipment: Contract(s): Quotation(s): Construction Observation:200 In-House: 5200 Contract: iiscellaneous Etpenses: Rents and Leases: Advertisement: Office Supplies: Copying: Postage: tilileage: Meetings: Other (please specify): Contingency:1,400 TOTAL ESTI`lATED COST FOR PHASE _, 1992 $ 15,000 lise additional sheets as necessary- to provide a cost estimate, as outlined above, for each and every phase or year of the project. Project Summary Form Today's Date: February- 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, ;Iinnesota Page 2 - City Hall Boiler 7. Which, if any, operatin.~ budget(s) need to be adjusted annually as a result of this project completion? None How much do you estimate the operating budget(s) ~~°ill be affected (please note reduced elpenditures in parenthesis)? First year personal services: $ First year other services and charges: $ First year commodities/supplies: $ First year debt services: $ Additional capital outlay: $ First 5-ear transfers: $ First year other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, suppl3-/capital outlay- items needed, etc.) 8. trhat, if any, is the in-house labor/equipment "credit" for taorking on this project (noted in question 6 above)? $1,000 9. Sr'hat, if any, is the first year estimated operating income, plus or minus, resulting from this project? None 10. What is the proposed source(s) of funding for this project? Lser Fees: Special Revenue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable): Federal (specify) State (specify-) County (specify) Other (specify) Federal Aid Urban System: Iunicipal State Aid: Taxi Increment Financing: Other (please specify): 15,000 TOTAL ESTIi~1ATED FU\TDING FOR PROJECT $ 15,000 11. Is this project in conformance ~.-ith the Comprehensive Plan which has been adopted by the Planning Commission? Yes If so, indicate the page(s) of the Comp Plan that apply-: 150 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible? Gov. Bldgs Buildings>CIP:Roof Today's Date: February- 5, 1981 PROJECT SU:~I:~1ARI' FORM 1988 CAPITAL BliDGET .^. `D CAPITAL I`IPRO~%E^~EL'T PROGRAM 1989-93 CITI OF RICHFIELD, ^fItiNESOTA 1. Brief, descriptive name of project: C'ent.ral Garage Roof 2_. Or. a separate sheet, provide detail eZ.plaining the locution, bac?aground, purpose and other information about the project. Attach map or dra~.~ing, if applicable. 3.o 4. Do other projects have any- relationship to this project? \o If so, what is the relationship? 5. In what 5-ear(s) and with what annual cost is this project proposed to be scheduled? CIB 1988 $ CIP 1991 CIP 1989 ~ CIP 1992 50,000 CIP 1990 $ CIP 1993 6. Based on the following estimates, the cost of this project for year 1992 (as detailed in question two is: Planning and Engineering:5 100 In-House: 5400 Contract: Acquisition of Property: Construction/Installation:48,300 In-House: Contract(s): 548,300 Furnishings and Equipment: Contract(s): Quotation(s): Construction Observation:200 In-House: $200 Contract: Miscellaneous Expenses:100 Rents and Leases: Advertisement: ~ 70 Office Supplies: 10 CopS-ing : 10 Postage: 10 1i leage Meetings: Other (please specify): Contingency:1,000 TOTAL ESTI^1ATED COST FOR PHASE _, 1992 $ 50,000 Use additional sheets as necessary to provide a cost estimate, as outlined above, for each and every phase or year of the project. Is this project a continuation of an existing project? I f so , cahat i s the c its- project number? Project Summary- Form Today's Date: February 5, 198i 1988 Capital Budget and Capital Improvement Program 1989/93 CitS- of Richfield, Minnesota Page 2 - Central Garage Roof 7. Which, if any, operatinb budgets} need to be adjusted annually as a result of this project completion? None Hoca much do you estimate the operating budget(s) will be affected (please note reduced expenditures in parenthesis)? First year personal services: $ First year other services and charges: $ First 5-ear commodities/supplies: $ First year debt services: $ Additional capital outlay: $ First year transfers: $ First year other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay- items needed, etc.) 8. What, if any, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? X600 9. What, if any, is the first year estimated operating income, plus or minus, resulting from this project? ':one 10. What is the proposed source(s) of funding for this project? User Fees: Special Rei-enue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable): Federal (specify-) State (specify} County (specify) Other (specify} Federal Aid Urban SS-stem: Municipal State Aid: Tax Increment Financing: Other (please specify): TOTAL ESTI`IATED FUNDING FOR PROJECT 50,000 50,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? Yes If so, indicate the pages} of the Comp Plan that apply-: 150 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible? Gov. Bldgs ater>CIP:Highservice Today's Date: February: 2, 1987 PROJECT SUi`itiTAR~' FORM 1988 CAPITAL BUDGET AND CAPITAL IMPROVEMENT PROGRAIvI 1989-93 CITY CF RICHFIELD, MINNESOTA 1. Brief, descriptive name of project: High Service Pump 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3. Is this project a continuation of an existing project? Yes If so, what is the city project number? 703-1581 (1987 CIB) Do other projects have an3- relationship to this project? No If so, what is the relationship? 5. In what years} and with what annual cost is this project proposed to be scheduled? CIB 1988 $ CIP 1991 $ CIP 1989 $ 20,000 CIP 1992 $ CIP 1990 $ 20,000 CIP 1993 ~ 6. Based on the following estimates, the cost of this project for phase ~3, year 1989 (as detailed in question tw o) is: Planning and Engineering:250 In-house: 5250 Contract: Acquisition of Property:N/A Construction/Installation:300 In-House: $300 Contract(s): Furnishings and Equipment:19,050 Contract(s): $19,050 Quotation(s): Construction Observation:300 In-House: $300 Contract: Miscellaneous Expenses:100 Rents and Leases: $50 Advertisement: $30 Office Supplies: Copying: $15 Postage: $ 5 Mileage: Meetings: Other (please specify): Contingency:N/A TOTAL ESTIMATED COST FOR PHASE ~3, 1989 $ 20,000 See page 3 for response to question six, phase four, 1990. Project Summary Form Today's Date: February 2, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, :Minnesota Page 2 - High Service Pump 7. Which, if an5-, operating budget(s) need to be adjusted annually as a result of this project completion? Water Mtc. How much do you estimate the operating budget(s) will be affected (please note reduced expenditures in parenthesis)? First year personal services: $ First 5-ear other services and charges: $ (100} First 5-ear commodities/supplies: $ (200) First year debt services: $ Additional capital outlay: $ First year transfers: $ First ,y-ear other (i.e., depreciation, etc.} $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.) Utility/Repairs 8. What, if an3-, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? $1,800 9. what, if any, is the first 5-ear estimated operating income, plus or minus, resulting from this project? None 10. what is the proposed source(s) of funding for this project? User Fees: $ 40,000 Special Revenue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable): Federal (specify) State (specify) County (specify) Other (specify) Federal aid Urban System: rlunicipal State Aid: Tax Increment Financing: Other (please specify): TOTAL ESTIMATED FUhDItiG FOR PROJECT $ 40,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted b5- the Planning Commission? Yes If so, indicate the page(s) of the Comp Plan that apply: 113-119 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible? Water Mtc. Project Summary Form Today's Date: February 2, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 3 - High Service Pump 6. Based on the following estimates, the for phase =4, Sear 1990 (as detailed Planning and Enginef,ring: In-House: X250 Contract: Acquisition of Property: Construction/Installation: In-House: X300 Contract(s): Furnishings and Equipment; Contract(s): X19,050 Quotation(s): Construction Observation: In-House: X300 Contract: Miscellaneous Expenses: Rents and Leases: X50 Advertisement: $30 Office Supplies: Copying: X15 Postage: $ 5 Mileage: Meetings: Other (please specify): Contingency: cost of this project in question two) is: 2~0 N/A 300 19,050 300 100 A TOTAL ESTIMATED COST FOR PHASE #4, 1990 $ 20,000 Water>CIP:Deadends Today's Date: February 5, 1987 PROJECT SL'~:~I~IARI' FORTMI 1988 CAPITAL BUDGET AND CAPITAL Il`IPROVEMENT PROGRAM 1989-93 CITI' OF RICHFIELD, MINNESOTA 1. Brief, descriptive name of project: Loop Dead Ends 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3. Is this project a continuation of an existing project? ~'es If so, what is the city project number? 703-1580 (1987 CIB) 4. Do other projects have any- relationship to this project? No If so, what is the relationship? 5. In cahat year(s) and c~*ith what annual cost is this project proposed to be scheduled? CIB 1988 5 CIP 1991 $ CIP 1989 ~ 30,000 CIP 1992 ~ CIP 1990 ~ 30,000 CIP 1993 $ 6. Based on the follocaing estimates, the cost of this project for phase =3, year 1989 (as detailed in question tw o} is: Planning and Engineering:2,000 In-House: 52,000 Contract: Acquisition of Property:N/A Construction/Installation:10,000 In-House: 510,000 Contract(s): Furnishings and Equipment:15,000 Contract(s): $15,000 Quotation(s): Construction Observation:N/A In-House: Contract: Miscellaneous Expenses:3,000 Rents and Leases: $2,300 Advertisement: $ 150 Office Supplies: $ 20 Copying: $ 200 Postage: $ 100 Mileage: $ 200 Meetings: $ 30 Other (please specify}: Contingency:N/A TOTAL ESTIMATED COST FOR PHASE #3, 1989 $ 30,000 See Page 3 for Phase #4, 1990 of project to loop dead ends. Project Summary Form Today's Date: February 5, 198i 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 2 - Loop Dead Ends 7. Which, if any, operating budgets} need to be adjusted annually as a result of this project completion? None How much do you estimate the operating budget(s) will be affected (please note reduced expenditures in parenthesis}? First year personal services: $ First 3-ear other services and charges: $ First year commodities/supplies: $ First year debt services: $ Additional capital outlay: $ First year transfers: $ First year other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply-/capital outlay items needed, etc.) 8. What, if any, is the in-house labor/equipment "credit" for taorlcing on this project (noted in question 6 above)? $28,600 9. What, if any, is the first year estimated operating income, plus or minus, resulting from this project? None 10. What is the proposed source(s) of funding for this project? User Fees: $ 60,000 Special Revenue/Re~-enue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable): Federal (specify) State (specify) County (specify} Other (specify) Federal Aid Urban System: Municipal State Aid: Tax Increment Financing: Other (please specify): TOTAL ESTIMATED FUNDI:vG FOR PROJECT $ 60,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? Yes If so, indicate the page(s) of the Comp Plan that apply: 113-119 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible? Water Mtc. Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, ~Sinnesota Page 3 - Loop Dead Ends 6. Based on the following estimates, the for phase .`~, year 1y90 (as detailed Planning and Engineering: In-House: 52,000 Contract: Acquisition of Propert3-: Construction/Installation: In-House: $10,000 Contract(s): Furnishings and Equipment: Contract(s): $15,000 quotation(s): Construction Observation: In-House: Contract: Iiscellaneous E:~penses Rents and Leases: $2,300 Advertisement: $ 150 Office St.rpplies: $ 20 Copying: $ 200 Postage: $ 100 Mileage: $ 200 Meetings: $ 30 Other (please specify): ContingencS>: cost of Y,his project in question two) is: 2 , 0 0 0 5 ~'/A S 10,000 5 15,000 N/A 3,000 N/A TOTAL ESTIMATED COST FOR PHASE n4, 1990 $ 30,000 Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 4 - Loop Dead Ends 2. This a project to complete the looping of dead ends in the water distribution system for purposes of providing better flow and fire protection in areas where the water lines run into dead end streets. Reference attached map cahich locates sites of dead ends to be looped between the years of 1987 and 1990. ater>CIP:Backc.ash Today's Date: February 5, 1987 PROJECT SL'^IMARI FORM 1988 CAPITAL BliDGET A~;D C:=.FIT.~L I~IPRO~~E~IELT PROGRAM 1989-93 CIT~° OF RICHFIELD, ^IINNESOTA 1. Brief, descriptive name of project: Backwash Pump 2_. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3. Is this project a continuation of an existing project? No If so, what is the city- project number? 4. Do other projects have any relationship to this project? No If so, .hat is the relationship? 5. In what year(s) and with what annual cost is this project proposed to be scheduled? CIB 1988 ~ CIP 1991 $ CIP 1989 5 CIP 1992 $ CIP 1990 S 20,10`1 CIP 1993 $ 6. Based on the follocaing estimates, the cost of this project for year 1990 (as detailed in question two is: Planning and Engineering:100 In-House: X100 Contract: Acquisition of Property:N/A Construction/Installation:100 In-House: $100 Contract(s): Furnishings and Equipment:19,900 Contract(s): $19,900 Quotation(s): Construction Observation:N/A In-House: Contract: Miscellaneous Expenses:N/A Rents and Leases: Advertisement: Office Supplies: Copying: Postage: Mileage: Meetings: Other (please specify-): Contingency-:N/A TOTAL ESTI^1ATED COST FOR PHASE _, 1990 $ 20,100 lise additional sheets as necessary to provide a cost estimate, as outlined above, for each acid every phase br year of the project. Project Summary Form Today's Date: February ~, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 2 - Backwash Pump 7. jtihich, if any, operating budget(s) need to be adjusted annuall3- as a result of this project completion? None How much do you estimate the operating budget(s) till be affected (please note reduced expenditures in parenthesis)? First 3-ear personal services: $ First year other services and charges: $ First year commodities/supplies: $ First year debt services: $ Additional capital outlay: First year transfers: $ First year other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to b~ hired, supply/capital outlay- items needed, etc.) 8. What, if any, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? $Z00 9. What, if any-, is the first year estimated operating income, plus or minus, rc=sulting from this project? None 10. What is the proposed source(s) of funding for this project? User Fees: $ 20,100 Special Revenue/Revenue Sharing:5 Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable): Federal (specify) State (specify) County (specify) Other (specify) Federal Aid L'rban System: Municipal State Aid: Tam Increment Financing: Other (please specify): TOTAL ESTIMATED FUNDING FOR PROJECT $ 20,100 11. Is this project in conformance with the Comprehensive Plan cahich has been adopted b3- the Planning Commission? Yes If so, indicate the page(s) of the Comp Plan that apply-: 113-119 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible? Water Mtc. Water>CIP:Slaker Today's Date: February. 5, 198i PROJECT SUNI^1ARI' FORM 1988 CAPITAL BUDGET AND CAPITAL I`IPROVENIENT PROGRAM 1989-93 CITY OF RICHFIELD, MINNESOTA 1. Brief, descriptive name of project: Lime Slaker 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drac.ing, if applicable. 3. Is this project a continuation of an existing project? No If so, what is the city project number? 4. Do other projects have any relationship to this project? No If so, what is the relationship? 5. In what year(s) and with what annual cost is this project proposed to be scheduled? CIB 1988 $ CIP 1991 $ CIP 1989 $ CIP 1992 $ 45,000 CIP 1990 $ CIP 1993 $ 6. Based on the following estimates, the cost of this project for year 1992 (as detailed in question t~ao)is: Planning and Engineering:5 1,000 In-House: $1,000 Contract: Acquisition of Property:N/A Construction/Installation:10,000 In-House: $10,000 Contract(s): Furnishings and Equipment:32,000 Contract(s): $32,000 Quotation(s): Construction Observation: In-House: Yes Contract: 4liscellaneous Expenses:1,000 Rents and Leases: Advertisement: Office Supplies: Copying: Postage: Mileage: Ieetings Other (please specify): Contingency:1,000 TOTAL ESTIMATED COST FOR PHASE 1, 1992 $ 45,000 Use additional sheets as necessary to provide a cost estimate, as outlined above, for each and every phase or year of the project. Project Summary Form Today's Date: Februar~r 5, 1987 1988 Capital Budget and Capital Improvement Frogram 1989/93 City of Richfield, Minnesota Page 2 - Lime Slaker 7 which, if an3-, operating budget(s) need to be adjusted annually as a result of this project completion:' None How much do you estimate the operating budget(s) will be affected (please note reduced expenditures in parenthesis)? First year personal services: $ First year other services and charges: $ First year commodities/supplies: $ First 3-ear debt services: $ Additional capital outlay: First 3-ear transfers: ~ First ;;ear other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdown of any items noted above.; i.e., description of additional personnel to be hired, suppl3-/capital outlay- items needed, etc.) 8. t,~hat, if any, is the in-house labor/equipment credit" for. working on this project (noted in question 6 a bove)? $11,000 9. jtihat, if any, is the first year estimated oper ating income, plus or minus, resulting from this project?None 10. ~4hat is the proposed source(s) of funding for this project? User Fees:45,000 Special Revenue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special assessment Other (specify) Grants (circle those applicable): Federal (specif~•) State (specify) County (specify) Other (specify) Federal aid Urban S~-stem: Sunicipal State Aid: Tax Increment Financing: Other (please specify): TOTAL ESTI:`1aTED FUNDING FOR PROJECT 45,000 11. Is this project in conformance ~.~ith the Comprehensive Plan which has been adopted by the Planning Commission? Yes If so, indicate the page(s) of the Comp Plan that apply: iiZ_i7o 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible? Water Mtc. Water>CIP:tvash Today's Date: February 5, 1981 PROJECT SUMMARY FORM 1988 CAPITAL BUDGET AND CAPITAL I~iPRO~~ENIENT PROGRAM 1989-93 CITY OF RICHFIELD, MINNESOTA 1. Brief, descriptive name of project: Air Filter Wash 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3.Is this project a continuation of an existing project? ~o If so, what is the city project number? 4. Do other projects have any relationship to this project? No If so, ghat is the relationship? 5. In c.;hat ;:ear(s) and with what annual cost is this project proposed. to be scheduled? CIB 1988 $ CIP 1991 CIP 1989 ~ CIP 1992 75,000 CIP 1990 ~ CIP 1993 75,000 6. Based on the following estimates, the cost of this project for year 1992 (as detailed in question two is: Planning and Engineering:10,000 In-House: $5,000 Contract: 5,000 Acquisition of Property: Construction/Installation:15,000 In-House: $15,000 Contract(s): Furnishings and Equipment:49,750 Contract(s): $49,750 Quotation(s): Construction Observation: In-House: Contract: Nliscellaneous Expenses:250 Rents and Leases: Advertisement: $175 Office Supplies: 25 CopS-ing : 35 Postage: 15 Mileage: Meetings: Other (please specif3-): Contingenc3T: TOTAL ESTIMATED COST FOR PHASE _, 1992 $ 75,000 Use additional sheets as necessary to provide a cost estimate, as outlined above, for each and every phase or year of the project. Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 2 - Air Filter tv'ash 7. Which, if an5-, operating budget(s) need to be adjusted annually as a result of this project completion? None Ho~a much do you estimate the operating budgets} will be affected (please note reduced expenditures in parenthesis)? First year personal services: $ First 5-ear other services and charges: $ First year commodities/supplies: $ First year debt services: $ Additional capital outlay: $ First year transfers: $ First year other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, suppl3-/capital outlay- items needed, etc.) 8. What, if any, is the in-house labor/equipment "credit" for aorlcing on this project (noted in question 6 above)? $36,000 9. What, if any, is the first year estimated operating income, plus or minus, resulting from this project? None 10. ~tihat is the proposed source(s) of funding for this project? User Fees: $ 150,000 Special Revenue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable): Federal (specify) State (specify) County (specify) Other (specify) Federal Aid Urban System: Municipal State Aid: Tax Increment Financing: Other (please specify): TOTAL ESTIMATED FUIvTDING FOR PROJECT $ 150,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? Yes If so, indicate the page(s) of the Comp Plan that apply: 113-119 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible? Water Mtc. Project Summary Form Today's Date: February 5, 1981 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 3 - Air Filter ~~ash 6. Based on the following estimates, the for year 1993 tas detailed in question Planning and Engineering: In-House: Contract: acquisition of Property: Construction/Installation: In-House: X15,000 Contract(s): Furnishings and Equipment: Contract(s): 555,000 Ruotation(s): Construction Observation: In-House: 51,000 Contract: Miscellaneous E:~penses: Rents and Leases: Advertisement: Office Supplies: $25 Copying: 35 Postage: 15 Mileage: Meetings: Other (please specify): Contingency-: cost of this project two) is: 15,000 55,000 1,000 75 3,925 TOTAL ESTIMATED COST FOR PHASE _, 1993 $ 75,000 Water>CIP:~r'ells Today's Date: February- 5, 198"i PROJECT SliyI~1ARY F OR~I 1988 CAPITAL BUDGET AND CAPITAL IMPRO~'EhIENT PROGRAivI 1989-93 CITY OF RICHFIELD, jlIti~vESOTA 1. Brief, descriptive name of project,: Well Pumps 2. On a separate sheet, provide detail explaining the location, background, purpose and other information about the project. Attach map or drawing, if applicable. 3. Is this project a continuation of an existing project? No If so, c.~hat is the city- project number? 4. Do other projects have any relationship to this project? h'o If so, what is the relationship? 5. In what year(s) and with cahat annual cost is this project proposed to be scheduled? CIB 1988 ~ CIP 1991 20,000 CIP 1989 S 20,000 CIP 1992 20,000 CIP 1990 $ 20,000 CIP 1993 22,000 6. Based on the following estimates, the cost of this project for k'ell ?2, rear 1989 {as detailed in que stion tc~o is: Planning and Engineering:100 In-House: S100 Contract: Acquisition of Property:V'/A Construction/Installation:19,550 In-House: Contract(s): $19,550 Furnishings and Equipment:N/A Contract(s): Quotation(s): Construction Observation:100 In-House: S100 Contract: Miscellaneous Expenses:250 Rents and Leases: Advertisement: $100 Office Supplies: $ 20 Copying: $100 Postage: $ 30 Mileage: Meetings: Other (please specify): Contingency:N/A TOTAL ESTIMATED COST FOR WELL #2, 1989 $ 20,000 See pages 3, 4, 5 and 6 for subsequent years. Project Summary Form Today's Date: February o, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 Gity of Richfield, Minnesota Page 2 - Well Pumps 7. Which, if any, operating budget(s) need to he adjusted annually as a result of this project completion? Water Mtc. How much do you estimate the operating budget(s) twill be affected (please note reduced expenditures in parent:hesis)? First 3-ear personal services: ~ First year other services and charges: $ (100) First year commodities/supplies: $ (200) First year debt services: $ Additional capital outlay: $ First year transfers: $ First year other (i.e., depreciation, etc.} $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.) Utilities/Repair 8. ~Yhat, if any, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? 1 000 9. ~r'hat, if an3-, is the first year estimated operating income, plus or minus, resulting from this project? None 10. What is the proposed sources} of funding for this project? User Fees: $ 102.000 Special Revenue/Revenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable): Federal (specify) State (specify) County (specify) Other (specify) Federal Aid Urban System: Iunicipal State Aid: Tam Increment Financing: Other (please specify): TOTAL ESTIMATED FUNDING FOR PROJECT $ 102,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? Yes If so, indicate the page(s) of the Comp Plan that apply: 113-119 12. Which department is responsible for the coordination of this project? Community Services Which division of that department is responsible? Water Mtc. Project Summary Form Today's Date: Februa.rti- 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 3 - Well Pumps 6. Based on the follo4aing estimates, the cost, of this project for Well 3 , rear 1990 ( as detailed in question t~ao )is Planning and Engineering:100 In-House: $100 Contract: Acquisition of Property:y N/A Construction/Installation:19,550 In-House: Contract(s): $19,550 Furnishings and Equipment:A Contract(s): Quotation(s): Construction Observation:100 In-House: $100 Contract: Miscellaneous Expenses:250 Rents and Leases: Advertisement: $100 Office Supplies: $ 20 Copying: $100 Postage: $ 30 riileage yieetings Other (please specify): Contingency:N/A TOTAL ESTIMATED COST FOR WELL ~3, 1990 $ 20,000 Project Summary Form 'Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page ~ - Well Pumps 6. Based on the follohirig estimates, the for Well ;:5, year 1991 (as detailed in Planning and Engineering: In-House: S100 Contract: Acquisition of Property: Construction/Installation: In-House: Contract(s): $19,550 Furnishings and Equipment: Contract(s): Quotation(s): Construction Observation: In-House: 5100 Contract: Miscellaneous Expenses: Rents and Leases: advertisement: $100 Office Supplies: $ 20 CopS-ing : $100 Postage: $ 30 hii leage Meetings: Other (please specify): Contingency: cost of this project question t~~o ) is 5 100 N/A 19,550 N/A 100 250 N/A TOTAL ESTI,IATED COST FOR WELL #5, 1991 $ 20,000 Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City- of Richfield, Minnesota Page 5 - Well Pumps 6. Based on the following estimates, the cost of this project for Well #4, Sear 1992 (as detailed in question two)is: Planning and Engineering:100 In-House: 5100 Contract: acquisition of Property:V/A Construction/Installation:19,~~0 In-House: Contract(s): $19,550 Furnishings and Equipment:N/A Contract(s): Quotation(s): Construction Observation:100 In-House: $100 Contract: Miscellaneous Expenses:250 Rents and Leases: advertisement: $100 Office Supplies: $ 20 Cop~-ing : $ 100 Postage: $ 30 1i leage : Seetings Other (please specify): Contingency-:N/A TOTAL ESTIMATED COST FOR YdELL #4, 1992 $ 20,000 Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, Minnesota Page 6 - Well Pumps 6. Based on the follocaing estimates, the cost of this project for Well n7, year 1993 (as detailed in question t~ao)is: Planning and Engineering:100 In-House: $100 Contract: Acquisition of Property:N/A Construction/Installation:21,550 In-House:. Contract(s): $21,550 Furnishings and Equipment:N/A Contract(s): Quotation(s): Construction Observation:100 In-House: $100 Contract: Miscellaneous Expenses:250 Rents and Leases: Advertisement: $100 Office Supplies: $ 20 CopS-ing : $100 Postage: $ 30 r1i leage Meetings: Other (please specif3-): Contingency:N/A TOTAL ESTIMATED COST FOR WELL ff7, 1993 $ 22,000 Project Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City of Richfield, `linnesota Page 7 - Well Pumps 2. The proposed projects} are a continuation of a preventative maintenance program for replacing one well pump each rear. We have found this prevents untimely breakdowns during thie high pumping Summer season. The operating cost main be reduced slightly due to high efficiency of the pumps. Richfield has seven well pumps. The proposed schedule is: 1989: Well *2, located in Nicollet Park, 63rd and \icollet 1990: Well :~3, located in Legion Lake Park, behind water plant 1991: t4e11 =~, located in Legion Lake Park, north of Ice Arena 1992: Well ~~, located in Legion Lake Park, 64th and Oakland 1993: Well »7, located immediately in front of plant on Portland See the attached map for location. WATER MAINS 5 ~ ~ K T ~. ~ ,. >: ~+: ,'. .. n 1 ~ ~ ? F d t ~ e ~ _ ~ ~ .. .. i, ,s" a ~ ~ _ ~ ~ ~ ~ 3 ~ ~ ; 3 12/31/85 t _ _ _ ~ r .. _ D ., w.., NA /!. / \ i~ / Mw A, ara~s:z:sr rr ro~~(rw.tl 4~ w._ ~ I r ror n WATER MAIN MAP LEGEND t ~ r rn, a o~..~ ......~... .....~...~.. OFFICIAL MAP OF r ~~IT Y Q)1~ RICHFIEL.D HENNEPIN COUPfTY, MINNESOTA Pudic Ntxks Department Engineering Division o ._ _m ,yL_~• uu C'71R"'-~~' n. n .".. ..._ e a ., Pro.jects>i01-=I814:CIP/Boiler Today's Date: Februar~• 5, 1981 PROJECT SL:~1`1ARI FORM 1988 CAPITAL BUDGET AND CAPITAL I~IPROVE~IENT PROGRAM 1989-93 CITI~ ~?F RIC}IFIELD, :`]I~\ESOT.'. 1. Brief, descripti-,-e name of project: I:~-ndale Liquor Boiler 2. On a separate sheet, provide detail explaining the location, background, purposr~ and other information about t}~e pro,ject. attach map or drawin<, if applicable. 3. Is this project a continuation of an existing project? do If so, what is the city project number? Do other projects have any relationship to this project? \o If so, what is the relationship? 5. In what ,year(s) and c;ith ghat annual cost is this project proposed to he scheduled? CIB 1988 ~ CIP 1991. CIP 1989 :~ CIP 1992 ~ CIP 1990 S CIP 1993 S 20,G00 6. Based on the folloc;in~ estimates, the cost of this project for phase = rear 1~~93 (as detailed in question two) is: F'lannin<, and in~ineerin~':S 1,000 In-House : S 1 , 0~0 Contract: acquisition of Propert-r: Construction/Installation:16,500 In-House: Contract(s): S16,500 Furnishins and Equipment: Contract(s): t~uotation(s>: Construction Observation:1,000 In-House: 51,000 Contract: Miscellaneous E:~penses:500 Rents and Leases: $350 Advertisement: 100 Office Supplies: 20 Copying: 2p Postae: 10 Ii leage Meetings: Ot.}ier ( please specify) Contingency-:1 , 000 TOTAL ESTI'~IATED COST FCR PHASE _, 1993 $ 20,000 tine additional sheets as necessarS- to provide a cost estimate, as outlined above, for each and every- phase or year of the project. Project Summary- Form Today's Date: February- ;~, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 City- of Richfield, Minnesota Page 2 - Lyndale Ligi.ror Boiler 7. ltihich, if any, operating budget(s) need to be adjusted annually as a result of this project? Lynd.ale Liquor How much do you estimate the operating budget(s) will be affected (please note reduced expenditures in parenthesis)`' First 5-ear personal services: $ First year other services and charges: $ (1.,000) First year commodities/supplies: $ First tear debt services: $ Additional capital outlay°: $ First year transfers: First year other (i.e., depreciation, etc.) $ On a separate sheet of paper, provide a breakdown of any items noted above; i.e., description of additional personnel to be hired, supply-/capital outlay- items needed, etc.) Utility Savings 8. ~~hat, if any, is the in-house labor/equipment "credit" for working on this project (noted in question G above)? X2,350 9. ttihat, if any, is the first year estimated operatin' income, plus or minus, resulting from this project? ,'one 10. tdhat is the proposed sour.ce(sj of funding for this project? User Fees: Special Revenue/Revenue Sharing:20,000 Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable): Federal (specify) State (specifyy) County (specify) Other (specify) Federal Aid Urban System: Municipal State Aid: Tam Increment Financing: Other (please specify}: TOTAL ESTIMATED FULTDING FOR PROJECT 20,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission? Yes If so, indicate the page{s} that apply: 1=18 and Section Tt~o, Special Revenue Funds of the 1982-198G (~apital Pro~'ram 12. Which department is responsible for the coordination of this project? Liquor Stores Which division of that department is responsible? Admin. r Pro.jects> i01-X81-I:CIP:Roof i"odat's Date: Fe't>ruar~- .~, 198 PROJECT SUS[^IAR~' FORM 88 CAPITAL Bt;DGET A'•~D CAPITAi. ~I?'RO~"E~IE'~T F'CGR.~.'~i 1989-93 i ITS- c>F' R.ICHFIELD, :'II'I;\ESOT.~ 1. Brief, descriptive name of project: L;:-n~ial.e L.igu~;r Rcof On a separate sheet., provide detail explaining' thF location, background, purpose :~na other it:formation about th<= project. Attach map or drac.ing, if applicable. 3. Is this project a continuation of an existing project? `.tio If so, chat. is the city project number`' In chat ;:ear (s) and with c.-hat annual cost is this project proposed to be sorieduled" IB 1988 $ CIP 1.991 CIP 1989 ~ CIP 1992 CIP 1990 r_IP 1993 X0,000 6. L3ased on the following' estimates, the cost of this project for phase rear 1993 (as detailed. in question two) is: Planning and Enineering:S x,000 In-House Contract: $5,000 Acquisition of Propertc: Construction/Installation:50,000 In-House: Contract(s): $50,000 Furnishings and Equipment: Contract(s): Quotation(s): Construction Observation:S 1,500 In-House: $1,500 Contract: Miscellaneous ExpensF_~s:S 00 Rents and Leases: X350 dvert,isement : 150 Office Supplies: Coprin~: Postage: Mileage: Meetings Other (please specify-) Contingency:3,000 Do other projects have an.y- relationship to this project'' do If so, ~-:hat is the relationship' TOTAL ESTIMATED COST FOR PHASE _, 1993 $ 60,000 Use additional sheets as necessary to provide a cost estimate, as outlined above, for each <~nd ever3T phase or year of the project. Froject Summary Form Today's Date: February 5, 1987 1988 Capital Budget and Capital Improvement Program 1989/93 Citi- of Richfield, ^iinnesota Fage 2 - Lyndale Liquor Roof 7. On a khich, if any, operating budget(s) need to be adjusted annually as a result, of this project. completion? None How much do ~-ou estimate the operating budget(s) will be affected- (please note reduced expenditures in parenthesis)? First year personal services: .$ First year other services and charges: $ First rear commodities/supplies: $ First year debt services: $ Additional capital outlay: First tear transfers: $ First Sear other (i.e., depreciation, etc.) $ separate sheet of paper, provide a breakdown of any items noted aboi-e; i.e., description of additional personnel to be hired, supply/capital outlay items needed, etc.) 8. what, if any, is the in-house labor/equipment "credit" for working on this project (noted in question 6 above)? X1,850 9. j+~hat, if any, i=. the first year estimated operating income, plus or minus, resulting from this project? None 10. khat is the proposed source(s) of funding for this project? User Fees: Special Revenue/R.evenue Sharing: Bonds (circle those applicable): General Obligation/Revenue Special Assessment Other (specify) Grants (circle those applicable): Federal (specify) State ( specify-) County (specify-) Other ( specifyy-) Federal Aid L'rban System: Municipal State Aid: Tax Increment Financing: Other (please specify-): TOTAL ESTIMATED FUNDING FOR PROJECT 60,000 60,000 11. Is this project in conformance with the Comprehensive Plan which has been adopted by the Planning Commission`' ~'es If so, indicate the page(s) of the Comp Plan that apply: 148 and Section Two of ~ ' ~ '- 986 C'a~~i t; ~n~~ram 12. i3hich department is responsible for the coordination of this project'' Liquor Stores Which division of that department is responsible? Admin. C I T Y O F R I C H F I E L D, M I N N E S O T A C O M M U N I T Y D E V E L O P M E N T D E P A R T M E N T Item ~~~, Information letter ~k10 Agenda of February 24, 1987 Planning Commission City of Richfield Issue Statement: Planning Commission Bylaws Sackground• At the January 27, 1987 Planning Commission meeting the Planning Commission proposed to make no changes to the Planning Commission Bylaws. Recommendation: It is recommended that the Planning Commission consider and approve the attached Planning Commission Bylaws. Alternative Recommendation: The alternative recommendation is to not approve the Cylaws and suggest changes for consideration at the regular commission meeting on March 24, 1987. Respectfully suCmitted, t..."'' Rick Jopke City Planner RJ/ils BYLAWS AND RULES OF PROCEDURE OF THE CITY PLANNING COMMISSION RICHFIELD, MINNESOTA The following bylaws and rules of procedure are adopted by the City Planning Commission to facilitate the performance of its duties and functions as empowered under Chapter III, Part VII, Section 3.68, Subdivision 1-9 of the city ordinance code. PART I. MEETINGS Section 1. Regular Meetings Regular meetings of the Planning Commission shall be on the fourth Tuesday of each month commencing at 7:30 PM in the council chamfers of the city hall. Section 2. General Planninq Meetings The second Tuesday of every month shall be reserved for discussing and deliberating on general planning matters related to the proper development and future well-being of the community. Section 3. Special Meetings Special meetings of the Planning Commission can be called by the chairperson and one member or by three members of the commission or at the request of the city council. Notice, designating the time and place of the meetings, shall be given to all members not less than twenty-four (24) hours in advance thereof. Section 4. Deadline for Hearing Items The Planning Commission will accept all applications to be heard before it, no later than fifteen working days preceding the regular Planning Commission meeting. Upon written notice to the community development director prior to the Planning Commission meeting, an application may be withdrawn. Once an application is withdrawn, it must be refiled with the Community Development Department, City of Richfield, before any Planning Commission hearing is held. Section 5. Quorum Five members of the Planning Commission shall constitute a quorum for the transaction of business. No action shall be taken in the absence of a quorum with the exception that the Planning Commission members present may take testimony for use at a later meeting at which a quorum is present, an may adjourn a meeting to a later time without further notice. Section 6. Voting At all meetings of the Planning Commission, each member attending shall be entitled to case one vote. Voting shall be by voice and an affirmative vote of a majority of those present shall be necessary for the passage of any matter before the Planning Commission, except as otherwise provided in these bylaws. Section 7. Proceedings a) b) Format of Meeting At a regular meeting of the Planning Commission, the following format shall be followed in conducting the business of the meeting. 1) Roll Call 2) Approval of Minutes 3) Regular Business and 4) New Business 5) Old Business 6) Adjournment Public Hearing Items Public Hearing The purpose of a hearing is to collect information and facts in order for the commission to develop a planning recommendation for the City Council. At a public hearing the following procedure shall be followed for each case for which a public hearing is held: 1) Chair shall state the case to be heard. 2) Chair shall call upon the Community Development Director or designee to present the staff report. 3) Chair shall ask the applicant to present his/her case. 4) Members of the Planning Commission shall be allowed to question the applicant about his/her proposal. 5) Interested persons may address the commission, giving relevant information regarding the proposal before the commission. 2- PART II. ORGANIZATION Section 1. Election of Officers At the first regular meeting in February of each year, the commission shall hold an organization meeting and elect from its memCership a chairperson, vice- chairperson, and secretary. Each member shall cast a Callot for the member he/she wishes to he chose chairperson. If no one received a majority of all the members of the commission, Calloting shall continue until one member receives majority support. Vice- chairperson and secretary shall Ce elected from the remaining members by the same procedure. If the chairperson resigns from office Cefore the next regular organization meeting, the vice-chairperson shall automatically Cecome acting chairperson. If Coth chairperson and vice-chairperson resign, the secretary shall Become acting chairperson. In any instance, where an officer of the commission resigns or retires from office a new officer shall he elected to the vacated position at the next regular meeting of the commission. If the chairperson, vice-chairperson, and secretary are absent from a meeting, the commission shall elect a temporary chairperson Cy voice vote. In the event that the secretary is assent from a meeting, the chairperson shall appoint a member of the commission to approve the minutes of that meeting. Section 2. Tenure The chairperson, vice-chairperson, and secretary shall take office immediately following their election and hold office until their successors are elected and assume office. Section 3. Duties of Officers The duties and powers of the officers of the Planning Commission shall he as follows: a) Chairperson 1) Presides over all meetings of the commission. 2) Appoints committees and performs such other duties as may be ordered by the commission. 4- 3) Signs documents of the commission. 4) Sees that all actions of the commission are properly taken. 5) Calls special meetings of the commission in accordance with these bylaws. 6) '+Vorks with appropriate city staff in organizing agendas of all general Planning Commission meetings. b) Vice-Chairperson Performs all of the duties and responsibilities of the chairperson in his/her absence. c) Secretary 1) Assumes duties and responsibilities of the chairperson when both chairperson and vice- chairperson are absent. 2) Keeps the minutes of the meetings of the commission in an appropriate minute book 3) Signs all minutes of the commission as well as other official documents of the commission. PART III. MISCELLANEOUS Section 1. Suspension of Rules The commission may suspend any of these rules by a 2/3 vote of those members present. Section 2. Amendments .. These rules may be amended at any regular meeting by a 2/3 majority of the members of the commission, provided that the amendment was presented and written into the minutes of a previous meeting. Section 3. Review The contents of these bylaws and rules of procedure should be comprehensively reviewed, evaluated, and modified where necessary, at the organization meeting held in r=ebruary of each year. 5- C I T Y O F C O M M U N I T Y R I C H F I E L D, M I N N E S O T A D E V E L O P M E N T D E P A R T M E N T Item ~b5 Information Letter X611 Agenda of February 24, 1987 Planning Commission City of Richfield Issue Statement: Election of chairperson, vice-chairperson and secretary. Background- The Bylaws require that the Planning Commission hold an annual organizational meeting and elect from its membership a chairperson, a vice-chairperson, and secretary at the first regular meeting in February. The Bylaws (Part II, Organization) require that the chairperson receive a majority vote. The vice-chairperson and secretary shall be elected from the remaining members with the same procedure. The chairperson, vice-chairperson, and secretary are to take office immediately on election and hold office until their successors are elected next year. The chairperson is responsible for conducting all Planning Commission meetings and public hearings. The chairperson is also responsible for working with the city administration in the planning function. The vice-chairperson is responsible for the duties of the chairperson in the event the chairperson is absent. The secretary is responsible for the minutes of the Planning Commission. Recommendation: It is recommended that the commission elect a chairperson, vice- chairperson, and a secretary. Respectfully submitted, c~ `~ Rick Jopke City Planner RJ/jls