2003-01-21RICHFIELD COMMUNITY SERVICES COMMISSION
AGENDA
Tuesday, January 21, 2003 - 7 p.ln.
Wood Lake Nature Center
6710 Lake Shore Drive
Commission Members Regular Staff Liaisons
Gary Ness Rick Jabs Linda Slocum Jim Topitzhofer (Staff Liaison) John Enger (Council)
Robert Dietl Barb Kritzman Gordon Vizecky John Evans (Secretary) Mark Tolvstad (Planning Com)
John Easterwood Maureen Scaglia
Tim Erlander Chad Sharkey
1. Call to Order
2. Approval of Minutes
❑ Regular Meeting of November 19, 2002
3. Public Comment
❑ Opportunity to discuss items not printed on the agenda
4. Action Items
❑ Community Center Remodeling Update (Topitzhofer)
5. Discussion Items
❑ Skate Park Alternatives (Topitzhofer)
❑ Master Plan for Veterans Memorial Park (Topitzhofer)
❑ Youth Athletics Field Usage Survey (Topitzhofer)
❑ 2004-2010 Capital Improvement Budget & Plan (Topitzhofer)
❑ Proposal for Art Center in Richfield (Jabs)
6. Committee Reports
❑ Urban Wildland Half Marathon & 5K (Topitzhofer)
❑ FOWL (Dietl)
❑ Planning Commission (Kritzman)
❑ Richfield Community Human Services Planning Council [RCHSPC] (Slocum)
7. Staff Reports
❑ Recreation Services
• Outdoor Pool Renovation Project (Topitzhofer)
8. Other
❑ Expiring Terms
• Maureen Scaglia
• Tim Erlander
9. Next Meeting
❑ Regular Meeting
Tuesday, February 18, 7:00 p.m.
Richfield Community Center
10. Adjournment
November 19, 2002 Minutes
,+ RICHFIELD COMMUNITY SERVICES COMMISSION MEETING MINUTES
Tuesday, November 19, 2002
Wood Lake Nature Center
Present: Commissioners Chad Sharkey, Rick Jabs, Linda Slocum, Gordon Vizecky, Gary Ness, Maureen Scaglia
Staff John Evans, Lil Hipp
Council Liaison John Enger
Others Audrey Wagner, Betty Peltola (Community Center Inter -Council Members)
Absent: Commissioners Tim Erlander, John Easterwood, Bob Dietl, Barb Kritzman
Planning Commission Liaison
Call to Order
The meeting was called to order by CSC Chair Jabs at 7:00 p.m.
Approval of Minutes
Sharkey moved, seconded by Slocum, to approve the minutes of the October 15 regular meeting. Approved, ayes
all.
Committee Reports
Outdoor Pool Task Force
Evans said that Topitzhofer included a status report in the packets; construction is on schedule.
Richfield Community Human Services Planning Council (RCHSPC)
Slocum reported that the group is examining funding and assessing the South Hennepin service area.
Staff Reports
Community Center Remodeling Project
All group members introduced themselves. Community Center Manager Hipp said that the Community Center
Remodeling Project has progressed to a preliminary floor plan from Jeff Oertel. She said that the project budget is
$376,000 and the Community Center Inter -Council is playing a key role in identifying and meeting the needs and wants
for the facility.
Jeff Oertel, Oertel Architects, presented the preliminary floor plan. Key changes include restoring the vaulted ceiling
in places, moving one office across the lounge to the general room area, new window in the general room, patio outside
the basement doors, sectioned meeting and entry areas in the basement, conversion of the downstairs men's bathroom
to an ADA-compliant family bathroom, conversion of the upstairs janitor's closet to an ADA-compliant restroom and other
changes. Sharkey asked what the approximate budget is for the HVACI ighting/electrical upgrades. Oertel said that these
areas could easily consume $400,000, but the project budget will include cosmetic changes, as well. Sharkey asked how
this will bode for five or ten years down the line. Oertel said that changes can be made that will accommodate future
changes and will sustain the building. Sharkey asked about the title of the land south of the building. Other CSC
members asked for a response to this question. Jabs said that the bathroom designs may be an issue; not having a
men's bathroom in the basement might cause people to go outside or upstairs. Vizecky asked about putting the
downstairs ADA bathroom in the present coat hall area. Scaglia and Sharkey suggested that some aspects of the project
(ADA restroom downstairs) could wait. Peltola said that a newly -remodeled community center shouldn't require a person
to go upstairs to use a bathroom. Oertel said that a new ADA-compliant bathroom downstairs seems to answer all
concerns. Jabs asked about potential funding for converting to ADA-compliance. Hipp said that she'd check it out.
Peltola said that the new bathrooms and the expanded arts/computer area are key to the needs of the daily users of the
Center. Hipp said that the planning also bears in mind the building's potential as a banquet/reception facility. Scaglia
asked if the on -site liquor ordinance change would be raised again. Enger said that he didn't believe that the Council
would oppose it. Sharkey suggested that more funding be approved (possibly the $100,000 park maintenance fund) for
the Center project. Jabs suggested applying for some of Best Buy's technology grant to the community. Slocum moved,
seconded by Ness, to approve the preliminary floor plans (with ADA-compliant bathrooms on both floors and keeping
coat room in basement) with the understanding that the plans would return for further study and final spec/plan review.
Approved, ayes all.
Adjournment I _
Slocum and Ness moved and seconded to adjournMeeting adjourned at 8:10 p.m.
III a RICHFIELD COMMUNITY SERVICES COMMISSION
EXECUTIVE SUMMI ARY
Meeting Date: January 21, 2003
Agenda Item
Community Center Remodeling Project
Enclosures
Preliminary Floor Plan Report (loose in envelope)
Agenda Section
Action Items
Staff Contact
Jim Topitzhofer
Jeff Oertel of Oertel Architects has completed the enclosed summary report of the preliminary plan
for remodeling improvements of the Community Center. Jeff will present the report at the CSC
meeting. There will be several members of the Inter -Council in attendance, who served on a sub-
committee advising Jeff.
The report outlines the basic concept of the project. Specific items include mechanical
improvements, ADA compliance, kitchen upgrades, computer room, new finishes, lighting
improvements, and new partitions. Cost estimates for the entire project range from $350,000 to
$409,000. Our current budget is $376,000.
It is desirable to carry out the construction work over the summer months. A possible schedule
follows:
January 21
Present preliminary plan & cost estimates to CSC for review.
February 11
City Council considers approval to proceed with plans, specifications & bidding documents.
March 25
Draft of plans & specifications reviewed by Building Official & Bloomington Health Officials.
April 8
City Council considers approval of plans & specifications, & advertisement for bids.
May 1
Bid Opening
May 13
City Council considers approval of bids.
May 27
City Council considers approval of construction contracts.
May 28
Construction Begins
September 15
Construction Completion Deadline
Recommended Action
Recommend Council approval to proceed with plans, specifications & bidding documents.
RICHFIELD COMMUNITY SERVICES COMMISSION
EXECUTIVE SUMTNL-�RY
Meeting Date: January 21, 2003
Agenda Item Agenda Section
YMCA/Tri-City Skate Park Alternative Plan Discussion Items
Attachments Staff Contact
None (plans will be brought to the meeting) Jim Topitzhofer
After three years of planning and preparation, Richfield's venture into a state-of-the-art skate park
was nearing reality. The Cities of Richfield, Bloomington and Edina formed a partnership with the
Southdale YMCA to leverage the amount of resources needed to create a desirable facility.
Numerous planning sessions with a 16-member youth committee produced an awesome design that
featured three in -ground concrete bowls (the first of its kind in the Metro Area). Neighborhood
meetings were conducted to find ways to minimize the impact of facility on the neighborhood. A
beautiful row of mature pine trees was planted to screen the skate park and a cul-de-sac section of
Xerxes Avenue now has prohibited parking to protect the privacy of the neighborhood.
Fundraising was the final task; over $305,000 was raised. Unfortunately, we were notified late fall
that our foundation request for $100,000 from a major corporation was passed up. A search for an
alternative design was conducted with the hope that the project could proceed within our current fund
balance. The initial design was modified to reduce the number of concrete bowls from three to two,
reduce decking surface and eliminate plans for a building. This new design will be presented at the
CSC meeting.
More than forty young citizens of Richfield have been invited to attend the CSC meeting to review the
alternative design. If the Community Services Commission favors the new design, work will
commence on final design, bidding, and construction with the possibility of a new skate park this
summer!
Recommended Action
Discuss and provide feedback. Approve by consensus the commencement of final design, bidding and
construction.
RICHFIELD COMMUNITY SERVICES COMMISSION
EXECUTIVE SUMMARY
Agenda Item
Veterans Park Master Plan
Attachments
Site Map of Veterans Park
Meeting Date: January 21, 2003
Agenda Section
Discussion Items
Staff Contact
Jim Topitzhofer
Veterans Memorial Park is Richfield's second-largest park. This 108-acre treasure is classified as a
community park, designed to serve the entire community. The park currently provides for a wide range of
recreational uses, including walking, jogging, bicycling, inline skating, birding, nature observance, farmers'
market, indoor skating at the ice arena, swimming at the outdoor pool, miniature golf, picnics at the shelter,
aerobics in the park building, and playing at Richfield's largest set of play equipment. Veterans Park also
accommodates large community events, including the Richfield Fourth of July Celebration, Cattail Days, and
the upcoming Urban Wildland Half Marathon. The blending of so many uses requires thorough planning.
There are several items related to Vets Park that will be appearing before the Community Services
Commission that require careful planning, including
1) Planting locations and selection of 24 trees to replace trees removed from the outdoor pool construction.
2) Relocation of the Fourth of July Celebration's carnival and street dance.
3) Expansion of the Ice Arena parking lot.
At an earlier meeting, the Community Services Commission suggested the recruitment of a few CSC
members to create a sub -committee to work on a master plan for Vets Park. Now is the time to do so (NOTE:
three new CSC members will be starting their terms at the next meeting).
Jim Topitzhofer will provide additional information at the meeting.
Recommended Action
Discuss, provide feedback and determine a course of action for a Vets Park Sub -Committee.
RICHFIELD COMMUNITY SERVICES COMMISSION
o
EXECUTIVE SUMMARY
Meeting Date: January 21, 2003
Agenda Item Agenda Section
Youth Athletics Field Usage Survey Discussion Items
Attachments Staff Contact
Completed Surveys Jim Topitzhofer
Representatives from all youth organizations in Richfield that use outdoor fields were sent an
invitation to a meeting scheduled on February 4, 2003, 7:00 p.m., at the Community Center. The
purpose of this meeting is to begin discussion on future needs of each sport and to plan further
improvements to youth athletic facilities, including Lincoln Park.
To prepare for the meetings, surveys were sent to each association representative requesting
information on field usage and participant data. These surveys are attached for review.
Rick Jabs, Community Services Chair, will be attending the meeting and invites interested
Commission members to do the same.
Recommended Action
Review and provide feedback.
Richfield Athletic Facilities Usage Survey
The following survey is being sent to the various athletic organizations to gather information about the
different groups that use Richfield's athletic facilities. The results of this survey will be utilized by the
Community Services Commission to assess the usage and needs of these facilities.
Association/Organization Name )�j ` r�
Contact Name ��-�t- K�''YT Phone Number
Jl
articipant Gender
LA Male ❑ Female ❑ Both
Participant Age Range S- 1 Z-
Number of Participants Over Last Five Years (list each year) Soo Say �7S yiS
Last Year's Percentage Breakdown of Resident and Non -Resident
Resident 9S Non -Resident s
Games/Activities Played on Weekdays yS Weekends S
Regular Season Length // �t%=�tJs Tournaments
Time Alotted for Each Game/Activity
Which field(s) do you use for practice?'S z v L �-���"�� SC 1/ f % ,q✓arGaB/ c
Which field(s) do you use for games/activities?If IT:7
�sr ✓��/ 1�n/coL�
Last Year's Fee Structure 41 10 T%� 8a`- �` q �+�{,�< �• .^ ?�
Scholarships Awarded? /P&4- c v/ A-L40
Do you anticipate participant numbers to increase or decrease? ST;Z A2y
By how much? U`') T1
Explain: 'ZirJ:-aLs/ /�iQs 4 V✓f� ��� �� /�C
Please attach a list of your board members and their phone numbers.
Thank you for your time'
s
Richfield Athletic Facilities Usage Survey
The following survey is being sent to the various athletic organizations to gather information about the
different groups that use Richfield's athletic facilities. The results of this survey will be utilized by the
Community Services Commission to assess the usage and needs of these facilities.
Association/Organization Name 11 L Ll t
Contact Name �—C2f r�% /<E 44V Phone Number S / �C S�
Participant Gender
❑ Male ❑ Female ❑ Both
Participant Age Range
Number of Participants Over Last Five Years (list each year)
Last Year's Percentage Breakdown of Resident and Non -Resident
Resident do O Non -Resident
Games/Activities Played on Weekdays_ Weekends X
Regular Season Length Ali': /— T"A/ Tournaments'V
Time Alotted for Each Game/Activity ? — 2 V
Which field(s) do you use for practice? 4 p�" n�° �I�O ' ' 0°` 1 �O"i 2 yn do
( 14�iY c}�yzl3 Id.
Which field(s) do you use for games/activities? 54rr,�!.
Last Year's Fee Structure 3 Y/-• 0ed5 v /` //S" yr• o (`(' "//c
�, _ J 0/1 /e ducz cr
Scholarships Awarded? Ij�} �z?r r C /c/1 t_ d
r � ,c > c/gvc! �z„'
Do you adicipate parlIticipant ri=bers to increase or decrease? Q/�9/'� x, 44 e SQm
By how much?
Explain: �X z // . C 5 -r
Please attach a list of your board members and their phone numbers.
Thank you for yourfimel
Richfield Athletic Facilities Usage Survey
The following survey is being sent to the various athletic organizations to gather information about the
different groups that use Richfield's athletic facilities. The results of this survey will be utilized by the
Community Services Commission to assess the usage and needs of these facilities.
Assoc iation/OrganizationName i%c ���/</ ���5 -��:� e�=s✓,.�, c/�
Contact Name 6u5%i : ),, I -4,n
Participant Gender
❑ Male M Female ❑ Both
Participant Age Range
Phone Number
Number of Participants Over Last Five Years (list each year) �:S 6 Y5
Last Year's Percentage Breakdown of Resident and Non -Resident
Resident 96 4 Non -Resident_
Games/Activities Played on Weekdays v� Weekends S
Regular Season Length Y/noll /AJ Tournaments S-(,
Time Alotted for Each Game/Activity � Y� %l,s
Which field(s) do you use for practice? 4AC01n //ells
Which field(s) do you use for gameslactivities? h I Coln
Last Year's Fee Structure .d130 -1O)U
Scholarships Awarded? J
Do you anticipate participant numbers to increase or decrease?
By how much?
Explain:
J
P!ease attach a list of your board members and their phone numbers.
Thank you for your !imel
Richfield Athletic Facilities Usage Survey
The following survey is being sent to the various athletic organizations to gather information about the
different groups that use Richfield's athletic facilities. The results of this survey will be utilized by the
Community Services Commission to assess the usage and needs of these facilities.
AssociationlOrgaan/nization Name I� d C N
Contact Name Phone Number(,i�-)
Participant Gender
Q Male ❑ Female ❑ Both
Participant Age Range /G, to 0
Number of Participants Over Last Five Years (list each year) _� L 31, 3 k 3 &_ 3L
Last Year's Percentage Breakdown of Resident and Non -Resident
Resident 3 i�, Non -Resident o
Games/Activities Played on Weekdays Weekends X
Regular Season Length - X// Tournaments a
Time Allotted for Each Game/Activity
Which field(s) do you use for practice?
Which field(s) do you use for games/activities?
Last Year's Fee Structure
Scholarships Awarded? 7
Do you anticipate participant numbers to increase or decrease?
By how much? ?
Explain:
%fir? V .4bDc,b- - -- - -
Pease =ach a lisf of your bcard members and .heir phone numbers-
iiiank you ,`or your time'
j Richfield Athletic Facilities Usage Survey
u..+rwwW..udW.uu�.
The following survey is being sent to the various athletic organizations to gather information about the
different groups that use Richfield's athletic facilities. The results of this survey will be utilized by the
Community Services Commission to assess the usage and needs of these facilities.
i
Association/Organization Name
Contact Name -Do Le G Kl-e l S"t ber (p /Z-,FH 6-SZ(1Z
J 6L'o fie.; - Participant Gender / t
P � ? o� f itfC�� ro l� �2ecL�
❑ Male ❑ Female 1 Both q ACC "�P:)
Participant Age Range S� / !�� G4G'r ` �1 i� Pnf Szt ��rlS,(Z{'ctch -
li Q
Number of Participants Over Last Five Years (list each year)
),-t.
Last Year's Percentage Breakdown of Resident and Non -Resident
er
Resident Non -Resident,
Games/Activities Played on Weekdays k Weekends
�' Wte kS fLo 4cw. — 'T Q!!C
Regular Season Lengt J!7n lSQ Vd � [roumaments/_[j,T� rows /65 i
weetr-5- d-of-f�eC--, rct�,ccly C�� Y-AaAt[-i XerC2Wee c
Time Allotted for Each Game/Activity/1fc. -t kr
�L �IOKr�
pOna lctSon
Which field(s) do you use for practice?: §P /�,a(�
Which field(s) do you use for games/activities? I/on[I%c�Sorl �/lri,5/J017, AQSd�ti�i _k42
Last Year's Fee Structure 4;- Q I�kwtwu �� SLID / s ifrlas uH �c-�) << e,-M tX(,f —60
Yes,
/ �raOwe- Co u.10
�Q
Scholarships Awarded? Yes , l l /)0/q rj,,,,si A d e � , /teexl
Do you anticipate participant numbers to increase or decrease? T�itY (LOCl/,_' 7p sl g 7Lf c
By how much? �hr!if � %li p�i t-5 C//
Explain: �ue %l67 i"e- l 61 CI ✓'Pc1
is l'/ h
5'P erg /q fin 4 ✓-e r �c�S 7L
Please attach a list of your board members and their phone numbers.
Thank you for your time'
Richfield Athletic Facilities Usage Survey
i I I 11 �I I III�I
The following survey is being sent to the various athletic organizations to gather information about the
different groups that use Richfield's athletic facilities. The results of this survey will be utilized by the
Community Services Commission to assess the usage and needs of these facilities.
Association/Organization Name
Contact Name 4/JwZ-L/ ��T Phone Number �f,!z - �7o 3
Participant Gender
t�- Male ❑ Female ❑ Both
Participant Age Range / —
Number of Participants Over Last Five Years (list each year) 1;74-5 /moo i/o
Last Year's Percentage Breakdown of Resident and Non -Resident
Resident L Non -Resident
Games/Activities Played on Weekdays// 0.95 Weekends
Regular Season Length`T /(/aJ Toumaments Nov
Time Alotted for Each Game/Activity _5;3�/�z AW � -
Which field(s) do you use for practicez�,l ,","w f�o��i�o� •�, f/��y
Which field(s) do you use for games/activities?i�
Last Year's Fee Structure s, 7_5 - xj
Scholarships Awarded?
Do you anticipate participant numbers to increase or decrease?
By how much?
Explain:
Please attach a fist of your board members and their phone numbers.
Thank you for your time/
RICHFIELD COMMUNITY SERVICES COMMISSION
EXECUTIVE SUAIMXRY
Meeting Date: January 21, 2003
Agenda Item Agenda Section
2004-2010 Capital Improvement Budget & Plan Discussion Items
Attachments Staff Contact
Table with Parks and Recreation Items Jim Topitzhofer
It is time now to begin the process to revisit the Capital Improvement Plan, which is a perpetual
seven-year plan that is revised on an annual basis. Specifically related to park improvements, the
CIP includes major projects such as the Outdoor Pool Renovation, Community Center Remodeling,
Tri-CityiYMCA Skate Park, and smaller projects in parks.
The attached summary is a revision of the park -related projects from the 2004-2010 Capital
Improvement Plan (CIP), which shows the eight -year internal loan funding the Outdoor Pool
Renovation Project (notice that the pool expenditures decrease each year from 2004 to 2010, as the
loan is paid off from Liquor Store proceeds). As we revisit the CIP and develop our 2004-2010 plan,
this loan will be a fixed item, not subject to change. In addition, two remaining loan payments for the
second ice sheet at the Arena must also remain fixed in the plan.
The Community Services Commission has a past practice of dedicating $100,000 of the CIP towards
non -operating park improvements each year (i.e. tennis court resurfacing, new roof for park shelters
and bituminous path resurfacing). Assuming the Commission wishes to continue contributing this
amount each year, available CIP funds for the next seven years are as follows:
2004 2005 2006 2007 2008 2009 2010
$59,736 $167,000 $73,000 1 $179,000 $187,144 $194,746 1 $202,356
Given these parameters, Recreation Services Staff are requesting initial direction from the
Community Services Commission, which will be incorporated into a proposed plan to be presented to
the CSC at the February 18 meeting, discussed at a joint meeting with the Planning Commission on
March 24 and formally approved in April.
Recommended Action j
Review, discuss and prepare for formal approval in April. J
Pool
Arena 2nd Sheet Payment
Parks Maintenance
Community Center
Wood Lake Prairie Rest.
Wood Lake Carpet & Office
Wood Lake Roof
Wood Lake Fence
Ice Arena Ceiling Beams
Ice Arena Cooling Tower
2004 Capital Improvement Budget
2005-2010 Capital Improvement Plan
250,866
243,264
235,662
228,060 220,458 212,856 205,254 197,644
97,000
98,000
100,000
100,000
100,000
100,000 100,000 100,000 100,000 100,000
85,000
11,000
121,000
45,000
15,500
55,000
35,000
Lincoln Field & Other 3,634 4,736
TOTAL 500,000 500,000
73,940 179,542 187,144 194,746 202,356
502,662 500,000 500,000 500,000 500,000 500,000
RICHFIELD COMMUNITY SERVICES COMMISSION
EXECUTIVE SUMMARY
Meeting Date: January 21, 2003
Agenda Item Agenda Section
Proposal for Art Center in Richfield Discussion Items
Attachments Contact
Memo from Mary Wertz to Rick Jabs Rick Jabs
Rick Jabs received a memo from Richfield resident Mary Wertz that proposes the construction of an
art center in Richfield. The memo, attached here, includes details of Ms. Wertz's ideas for such a
facility. Rick brings the suggestion to the CSC for further discussion and feedback.
Recommended Action
Discuss and provide feedback.
JAN-10-2003 09:11 R o, L LPBOPRTORIES 612 374 5426 P.02
To: Rick
From: Mary Gertz
'R Arr CpnrPr
With Richfield such a great family place, I think that an art center would be a great addition. This
could carer ro families and children, with services for individuals, groups, scouts, youth
organizations, parents and teachers.
I see after school and weekend classes in drawing, painting, sculpture and crafts_ 1 also see the
center offering holiday workshops seasonally. In the summer, an arc camp could be offered for
grade schoolers. Training sessions could be offered for people who work with children, like
teachers, chuxch volunteers, scout leaders and others. The studio could be a grear place for
birrhday parties, scout meetings, and family get togecbers.
The location could be an existinb storefront, wirh good parking a: c? act s wi ity. A single level
storefront would be handicapped accessible, and highly visible. The "build out" could be simple and
not particularly expensive.
Most art classes are not expensive to present. Only ceramics requires expensive equipment, and
this need not be included in the initial development. Since a picture is worth a thousand words, I
have included a little sketch of one possible layout.
There would be multiple benefits. Edina and Bloomington have art centers, and such a service
would be attractive to Richfield residents. I think that a special niche regarding this kind of
resource in Richfield would be that is could carer to kids and families. I envision
it as a place where creativity and art is accessib.
non -threatening. Using the studio for groups t
do not otherwise have a space to make a little
mess and create artful events would enhance
the quality of life in the area.
J t111 1V CV VJ lJJ•11 11 ♦. L LnLVe��rVr-.�V�
The art center could build on other community activities, like the Historic society, or the vision
program. Events involving historic crafts, Brainstorming and creativity, and public art installations
could be hosred by the art center.
I think it would be great to have a little air gallery, where arc center participants or others could
display work for display or sale. The gallery could also include items of local flavor, like "Richfield"
clothing, poster style maps (current or historic) and the like.
Some thoughts on a budget might include:
Rent $24,000
Director
$30,000
Instructors
$30,000
Materials
$20,000
Marketing
$10,000
Revenues would come from class fees, gallery sales, and studio rental. At $10 per person, 11,000
participants per year, or 1000 per month would be necessary. This is unreasonable, so a sponsor,
city funds, or fund raising would be necessary to operate the center. I think char annual revenues
of $40,000 may be possible. This would include:
2 weekly group events averaging $100 each.
10,000
Class offering, with 5-10 classes offered each periods, 10 students each,
6 week sessions, 50 students per period, $45 average cost,
8 sessions annually 18,000
6 Holiday Workshops, 30 participants each 3,000
Gallery sales 5,000
Summer Camp, 60 participants, $50 each 3,000
Selling "memberships" is a standard way of rasing operating funds, and would be compensated with
special events, discounts, and recognition. It is impossible to estimate start up costs, without a
space in mind.
I hope this give you some idea of my concept, and that it is interesting to you.
If you have questions, please let me know.
Storage
STUDIO
1
Sl p and woA sWlons Sfora� work slabons
1 I j
Gallery and Reception
Store from windows
A storefront with window would attract
attention.
The gallery/reception area would only have co
he staffed part time.
The studio would have flexible work space ,
for large and small groups, with a maximum
capacity of at least 30.
The Build out could be simple. Plain walls
will a simple gallery banging system (to allow
for flexible display with wall damage.) would
he inexpensive. The storage work area could
be build from prefab kitchen style cabinets.
The studio space would be open for
maximum flexibility. It could include a
divider to allow two groups to work at one
time, but this would not be necessary.