Loading...
12-14-1983 BidCITY OF RICHFIELD Bid Opening December 14, 1983 Muck Excavation and Granular Fill -Richfield Lake Pursuant to requirements of Resolution No. 1015, a meeting of the Administrative Staff was called by Sylvia Bergh, City Clerk, who announced that the purpose of the meeting was to receive, open and read aloud, bids for Muck Excavation and Granular Fi11 - Richfield Lake, as advertised in the official newspaper on November 23, 1983. Fresent: Don Fondrick, Community Services Director Ron Rankin, Administrative Services Director Michael Eastling, City Engineer Tom Ferber, Engineering Division Representative Art Bailey, Engineering Division Representative Mary Ruhme, Recreation Supervisor/Designer Sandy Rosenow, Administrative Assistant, Community Services Sylvia Bergh, City Clerk 1 The following bids were submitted and read aloud: BIDDER BID SECURITY AMOUNT Barry Construction Co., take Wilson,,MN 5% Bid Bond X159,429.00 Carl Bolander & Sons, St. Paul ~ 5% Bid Bond $140,475.00 Prior Lake Aggregate, Inc, Prior Lake 5% Bid Bond $128,215.00 Veit & Corm an Ro ers, MN 5% Sid Bord $143,620.0 D. W. Blattner & Sons, Avon, MN 5% Bid .Bond $127,960.00 M. Danner Trucking, Inver Grove Weights 5% Bid Bond $161,945.00 Ulangerin, Inc., Bloomington 5% Bid Bond $165,845.00_ Bussing B~ ros. Trucking, Long Lake., MN 5% Bid Bond $134,402.50 G. L. Contracting, Wopkins 5% Bid Bond $174,237.50 Barber Construction Co., Inc., Minnetonka 5% Bid Bond $167,863.50 Crossings, T.nc.., Prior Lake 5% Bid Bond $131,250.00 Fark Construction Co., Minneapolis 5% Bid Bond _ $149,970.20 .,.. W & G Rehbein Bros., Wuao, MN 5% Bid Bond $143.,915.00 Julian M. Johnson Construction., Blaine 5% Bid Bond $ 96,299.80 The City Clerk announced that the bids would be tabulated and considered at the special city counci l meeting of t'°^°^'~'°~ ' ° ' °4'