Loading...
05-17-1963 Bid1 VILLAGE OF RICHFIELD BidvOpen ing May 17s 1961 Raw Water Main & Appurtenant Work Village Proj. #490 Pursuant to requirements of Resolution No, 1015, a meeting of the administra0 Live staff was held in the Village Hali, 6700 Portland Ave., at i1s30 A..M. on Friday, May 17, 1963. The mee Ling was called to order by the village manager who announced that the purpose of the meeting was to receive, open and read aloudesealed bids on raw water trarnsmission main, Village Pro3. #4908 as advertised in the of- ficial newspaper an April 25, 1963. Presents 0, R, Van Kreveien, manager Leo Jolly, village engineer Robert Schaefer, admin. asst. Lee Poultere fire chief 1 The clerk presented a total of seven bids and called for outstanding ones, None were fortFxcoming. The following bids were opened and read aloudo BIDDER BID SECURITY . TOTAL BID Nodlund Construction Coe, Inc. B. Be 5% $788750,00 Richard Lund, repre s. Orfei & Sons, Inc. BBB. S°!o 938736,40 Fred Jonas, repres. Phelps-Drake, Inc. BOBe 59'. 888836,10 Jim Hazlett, repres, McDonaldmLuben & Associates B,B. 5% 1378441,5® R, McDonald, repres, Knuds®nm5eurer, I11Ce BpBe ~y d'!0 758367.50 A. Knudson, repres. ter Lametti Construction Coe Pe B„B. 5%. 82831®.70 s Frank Laske, repre sp Barbarossa & Sonse Inc. Belle 5~ 768314858 Dick Keelings repre se The manager announced that the bids would be tabulated and considered at the council mee tinge Mondays May 278 19638 Florence M. Paulsone Sec°y 1 VILLAGB OP RICHFIELD BidmOpening May 17, 1963 1 1 Deep Well Vertical Pumps #3, 4, 5, & 6 Village Prod. #489 Pursuant to requirements of Resolution No, 1015, a meeting of the adminis® trative staff was held in the Village Hat 1, 6?00 Portland Ave., at 11°30 AoMO, May 17, 1963. The meeting was ealied to order by the village manager who announced that. the purpose of the meeting was to receivep open and read aloudo sealed bides on deep well vertical, pumps #3, 4, 5 and 6, Viila.ge Pro30 #489, as advertised in the official newspaper on April 250 1963, Presents 0. R. Van Krevelen, manager Leo Joilyo village engineer Lee Poulter, fire chief Robert Schaefer, admin. asst, The clerk preserved a total of seven bids and ask ed for outstanding-.ones. None were forthcoming. The following bids were opened and read aloud: Add ~ deduct per BIDDER BID SECURITY TOTAL BID 10 f t0 section Jack Pischet We11 & Pump Co. 5~ B.B. $21,800.00 $185000 ea. welb J. Pischer, repres0 McCarthy t~elr Co, 5% B.B. 18,724010 161050 ea. weii Sterling Norbeck, repres0 Crane & Ordway Co. CertoCkO 1098000 21,935000 144000 ea0 weii Don Gardner, repres0 Bergeson®Caswell IncO B.B. 50I. 20,493000 210.00 ea0 well Arthur Hart, repres0 _ LayneQMinnesota Co. B.Bo 5% 21,735000 170000 ea0 well Marren Lindeke, repres. Keyes bell Drilling Coo BoB. 5°I• 18,999000 155000 ea0 well Bill Voss, repres. Mueller Bros. Contractors Cert.CkO 1200000 23,970000 130000 ea0 weii Ivan Sine ii, re pres. The manager announced that the bids would be tabula ted and a~nsidered at the council meeting, Monday, May 27, 19630 Po M. Paulson, Secretary D