1965-3417r~~~
RESOLUTION RECEIVING REPORT AND CALLINS HEARING ON MAY 24i`M~
• 1965 ON STORM SEWER CONSTRUCTION IN ALLEY BETWEEN CLINTON
AVENtlE AND 4TH AVENUE FROM 73RD STREET TO 74TH STREET.
CITY PROJECT N0. 533
CLERKS FILE N0. 7557
WHEREAS PURSUANT TO RESOLUTION OF THE COUNCIL ADOPTED AN THE 12TH DAY OF APRIL
1965 A REPORT HAS BEEN PREPARED BY ORR~SCMELEN•MAYERON do ASSOCIATES INC. (CONSULT
IN8 ENBINEER9) WITH REFERENCE TA STORM SEWER CONSTRUCTION AS DESIQNATED IN RESOLUTION
No. 3406 AND THIS REPORT WAS RECEIVED BY THE COUNCIL ON APRIL 26TH 1965 CLERKS
FILE N0. 7557.
TERMINI
LOCATION FROM TO
ALLEY BETWEEN CLINTON AVENUE 73RD STREET A POINT APPROXIMATELY 2301 30UTM
ANO 4TH AVENUE OF THE CENTERLINE OF 73RD STREET
73RD STREET ALLEY BETWEEN 3RD AVENUE
CLINTON AVENUE
AND 4TH AVENUE
SOW THEREFORE, BE IT RE SO LVED BY THE CITY COUNCIL OF THE CITY OF RICWFIELD~
M 1 NNf=SOTAi
i• TWAT TWE COUNCIL CONSIDER THE IMPROVEMENT OF SUCH STORM SEWER CONSTRUCTION
1N ACCOFDANCE WITH THE REPORT AND THE A99ESSMENT OF THE FOLLOWING LOTS IN SECTION 34~
T. 28~ R. 24L
LOT 1 AND LOTS 14 THROUGH 24~ BLOCK I~ BLAIR~3 WOODDALE 3RD ADDITION
LOTS 1 THROUGH 11•~ ANO LOTS 14 THROUGH 24y BLOCK 2~ BLAIR~S WOODDALE 3RD AOD.
LOTS 1 THROUGH 24~ BLOCK 3~ BLAIR~S WOODDALE 3RD ADDITION
LOTS I THROUGH I1~ BLOCK 4~ BLAIR~S WOODDALE 3RD ADDITION
LOTS 6,TIAROUBH 16~ BLOCK I~ WILLIAM JESSUP~S ADDITION
LOTS 3 THROUGH 8~ $LOCK 2~ WILLIAM JE33UPtS ADDITION
THE SOUTH 327• AF TWE N• E. ~ OF THE S. E• ~ OF TWE N• E• ~ AF
SEC. 34, T. 28~ R. 24. •
FOR ALL OR A PORTION OF THE COST OF-THE IMPROVEMENT AT AN ESTIMATED TOTAL" COST OF
THE IMPROVEMENT OF $10530.00.
2. A PUBLIC.HEARI`N8 SHALL BE HELD ON SUCH PROP09ED IMPROVEMENT ON TWE 24TH
DAY CF MAY 1965 (N THE COUNCIL CHAMBERS OF THE CITY HALLS AT 7L15 P.M. AND THE
CLERK SHALL 81VE PUBLISHED NOTICE OF SUCH HEARING AND IMPROVEMENT AS REQUIRED BY
LAW.
PASSED BY THE CITY COUNCIL THIS 26TH DAY OF APRILS 1965•
v
ATTEST:
~.
~ ~~
~~