1965-3399r~ ~~
RESOLUTION N0. 3399
RESOLUTION OR DERINO PREPARATION OF REPORT ON STORM SEWER
CONSTRUCTION IN ALLEY FROM 63RD STREET TO 64TH STREET
BETIIrEEN HUMBOLDT AVENUE AND IRVINO AVENUE
CITY PROJECT NO. 534
WHEREAS IT 18 PROPOSED TO IMPROVE THE FOLLOWINQ ALLEYt
ALLEY LOCATED FROM 63RD STREET TO 64TH STREET BETWEEN
HUMBOLDT AVENUE AND IRy1NQ AVENUE
BY STORM SEWER CONSTRUCTION AND APPURTENANCES THERE70~ AND TO A 58ESS ALL PROPERTY
BENEFITTED FOR ALL OR A PORTION OF THE COST OF THE IMPROVEMENT.
NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF RICHFIELD MINIW
E90TA3
1• THAT THE PROPOSED IMPROVEMENT 8E REFERRED TO ORR~SCHELEN~^MAYERON 8o ASSOCIATES
INC•~ CON ~1LTINQ ENQINEERB~ FOR STUDY AND THAT THEY BE INSTRUCTED TO REPORT TO THE
COUNCIL WITW ALL CONVENIQNT SPEEDS ADVIBINO THE COUNCIL IN A PRELIMINARY WAYS AS TO
WHETHER THE PROp08E0 IMPROVEMENT IS FEASIBLEy THE AREA TO BE ASSESSED AND AS TO WHETHER
IT 6HOULD BEST BE MADE AS PROPOSED OR IN CONNECTION WITH MME OTHER IMPROVEMENT+ AND THE
' ESTIMATED COST OF THE IMPROVEMENT AS RECOMMENDED.
2. THAT THE STORM SEWER IMPROVEMENT LISTED IN THl6 RESOLUTION SHALL HEREAFTER BE
KNOWN A S C I TY PROJECT NO. 534.
3, THAT THE COSTS FOR PRELIMINARY WORK SHALL BE PAID FROM THE CONSTRUCTION FUND
SUCH COSTS TO BE REIMBURSED WHEN FINANCINQ WAS BEEN ACCOMPLISHED FOR THE CONSTRUCTION
OF THIS PROJECT
ADOPTED BY THE CITY COUNCIL OF 7WE CITY OF RICHFIELD THIS 12TH DAY OF APRILs !9650
~~
~_.. m
MAYOR
ATTEST t
c i TY ER K