Loading...
09-24 Bill No. 2024-09 Transitory 19.40 RedlineCity of Richfield September 24, 2024 County of Hennepin State of Minnesota BILL NO. 2024-X TRANSITORY ORDINANCE NO. 19-XX Motion By: Seconded By: AN ORDINANCE AMENDING APPENDIX D TO THE RICHFIELD CITY CODE; ESTABLISHING A FEE SCHEDULE FOR CERTAIN PERMITS AND APPLICATIONS THE CITY OF RICHFIELD DOES ORDAIN: Section 1. Background 1.01 Appendix D to the Richfield City Code consists of the schedule of fees adopted by the City Council, including those adopted by resolution and those adopted by Ordinance. 1.02 Minnesota Statutes, Section 462.353 requires that certain fees be adopted by Ordinance. The City Council has previously established certain fees by Transitory Ordinance No. 19.31. The City Council has established other fees by resolution, which resolution is also part of Appendix D. 1.03 The City Council has determined the need to update the schedule of fees under Transitory Ordinance No. 19.31. Section 2. Fee Schedule Adopted 2.01 The fees set forth in the attached Exhibit A are hereby adopted by Ordinance. 2.02 The fees adopted at Section 2.01 of this Ordinance shall be amended only by Ordinance. Any fees established by resolution, other than those adopted at Section 2.01 of this Ordinance, may be amended from time to time by resolution of the City Council. Section 3. Effective date; codification. 3.01 This Ordinance is effective in accordance with Section 3.09 of the City Charter. 3.02 This Ordinance shall take effect January 1, 2025. 3.03 A copy of this Ordinance shall be included in Appendix D to the Richfield City Code, immediately prior to the resolution establishing fees. 3.04 This Ordinance supersedes Transitory Ordinance No. 19.31. City of Richfield September 24, 2024 County of Hennepin State of Minnesota Adopted by the City Council of the City of Richfield, Minnesota this 24 day of September 2024. VOTING AYE VOTING NAY Supple, Mary Supple, Mary Christensen, Sharon Christensen, Sharon Hayford O’Leary, Sean Hayford O’Leary, Sean Trautmann, Simon Trautmann, Simon Whalen, Ben Whalen, Ben Mary B. Supple, Mayor ATTEST: Michelle Friedrich, City Clerk City of Richfield September 24, 2024 County of Hennepin State of Minnesota EXHIBIT A. CONSTRUCTION AND RELATED PERMIT FEES AND CHARGES A. Investigation Fees: Work without a Permit: Investigation. Whenever any work for which a permit is required by this code has been commenced without first obtaining said permit, a special investigation shall be made before a permit may be issued for such work. Fee. An investigation fee, in addition to the permit fee, shall be collected whether or not a permit is then or subsequently issued. The investigation fee shall be equal to the amount of the permit fee required by this code. The minimum investigation fee shall be the same as the minimum fee set forth in Section 2. The payment of such investigation fee shall not exempt any person from compliance with all other provisions of this code nor from any penalty prescribed by law. B. Permit fee refunds: The building official may authorize refunding of not more than 80 percent of the permit fee paid when no work has been done under a permit issued in accordance with this code. The building official may authorize refunding of not more than 80 percent of the plan review fee paid when an application for a permit for which a plan review fee has been paid is withdrawn or canceled before any plan reviewing is done. The building official shall not authorize refunding of any fee paid except on written application filed by the original permitted not later than 180 days after the date of fee payment. Type of Permit or License Section Requirin g Description Fee (1) Building Permits 400.03 — 400.09 Fee Schedule to follow MN Statute 326B.153 + State Surcharge 326B.148 https://www.revisor.mn.gov/statutes/cite/326 B.153 Except values of $1-$2,000, the fee is $65.00 https://www.revisor.mn.gov/statutes/cite/326 B.148 (2) Driveway, Parking Area Permits 515.05 (no permit fee for sidewalks) $4065.00 (3) Swimming 420.00 Permanent or portable pools are based on $5565.00 City of Richfield September 24, 2024 County of Hennepin State of Minnesota building permit fees with a minimum of (4) Plan Review Fee 400.03 — 400.09 25% for decks/porches, gazebos, bathroom remodels, etc. 35% of building permit fee for one and two family dwelling basement remodels Plan review fee for similar buildings 65% of building permit fee for all other building permits, except no fee for the following: (a) Existing single family dwelling minor nonstructural alterations. (b) Single and two family dwelling repair and maintenance work. (c) Commercial and industrial repair and maintenance work not exceeding $1,000.00 or where plans are not required. Plan Review fee for similar buildings Maximum 25% of permit fee based on Minnesota State Building Code 1300.0160 (5) Contractor License Verification Fee contractor applies for permit(s) $5.00 (6) Moving- Buildings 845 Moving Permit Fee $65.00 (7) Structure Demolition 400.00 — 400.09 (a) Commercial Demolition cost as per Building Permit Schedule with a minimum of $65.00 (b) Residential Demolition Dwelling One or two story Residential—Garage and lesser structure $65.00 $40.00 City of Richfield September 24, 2024 County of Hennepin State of Minnesota (8) Plumbing Permit 400.03 — 400.09 400.03 — 400.09 Residential Minimum Fee 2% of Total Job cost with a minimum of (includes one inspection) $5565.00 Each additional inspection $5565.00 (9) Plumbing Permit 400.03 — 400.09 400.03 — 400.09 Commercial/Industrial/M ulti-family Based on Total Job cost 2% of Estimated Job cost with a minimum of(includes one inspection) $65.00 Each additional inspection $65.00 (10) Electrical Permit 400.03 — 400.09 400.03 — 400.09 Residential (a) Minimum Fee which includes one inspection $55.00 (b) Each additional Inspection $55.00 (c) Complete Wiring Fee: Single-family Dwelling and each dwelling unit of a two family dwelling and includes not more than three inspections. $175.00 (d) New Service—up to 200 amps $100.00 (e) Temporary Service— (for construction) $55.00 (f) Sub Panel $55.00 (g) Installation, addition alteration, or repair of each circuit or feeder $10.00 (h) Swimming pool or exterior hot tub $55.00 (11) Electrical Permit Commercia l (12) 400.03 — 400.09 400.03 — 400.09 Commercial, Industrial and multiple dwellings(more than two units) and Technology systems: $55.00 City of Richfield September 24, 2024 County of Hennepin State of Minnesota Electrical Permit Signs Minimum Fee which includes one inspection Each additional inspection $55.00 (a) Based on total job cost - 2% of estimated job cost with a minimum of - Over $50,000 ? Fee/$1,000.00 plus 1% of cost over $50,000.00 $55.00 (b) Traffic Signals: Per Intersection $185.00 (c) Fire Alarm: Based on ¾% of cost of electrical job to customer with a minimum of $55.00 (d) Carnivals, festivals and similar events plus $35.00 for each service on generator $110.00 (13) Solar Photovoltai c System Rating* Based on 2% of cost of electrical job to customer with a minimum of (separate electrical permit required for signs) 400.03 — 400.09 0—5,000 watts $65.00 5,001—10,000 watts $150.00 10,001—20,000 watts $200.00 20,001—30,000 watts $250.00 30,001—40,000 watts $300.00 (14) Residential Heating, Ventilating, Air Conditionin g and Refrigeratio n Commercia l Heating, Ventilating, Air 400.03 — 400.09 Central Systems and Additions, Alterations and Repairs 1½% estimated cost with a minimum of (Includes one inspection) $5565.00 City of Richfield September 24, 2024 County of Hennepin State of Minnesota Conditionin g and Refrigeratio n Each additional inspection Central Systems and Additions, Alterations and Repairs 1½% estimated cost with a minimum of $5565.00 $65.00 (15) Sign Installation 415.01 — 415.11 (a) Temporary sign permit (b) Permanent sign (any size) Building permit is required for sign support structures fees based on building permit fee schedule $5565.00 $125.00 (16) Temporary Certificate of Occupancy 400 A temporary Certificate of Occupancy may be issued before completion of the entire work covered by the permit, provided the Chief Building Official deems that the building is safe to occupy $200.00 Plus a letter of credit or cash escrow equal to 125% of the remaining City Code requirements ZONING, LAND USE AND RELATED CHARGES Type of Permit or License Section Requiring Description Fee (1) Planned Unit Development 542 (a) $1,000 plus $5/$1,000 of project value (construction cost) up to a maximum fee of $5,000.00 (b) Major PUD Plan Amendment— $1,000 plus $5/$1,000 of project value (construction cost) up to a maximum fee of $5,000.00 (c) Minor PUD Plan Amendment $400.00 (2) Site Plan Review 547 (a) $500 plus $5/$1,000 of project value (construction cost) to a maximum fee of $3,500.00 City of Richfield September 24, 2024 County of Hennepin State of Minnesota (b) Major amendment—$500 plus $5/$1,000 of project value (construction cost) to a maximum fee of $3,500.00 (c) Minor amendment $350.00 (3) Variance 547 Residential $350.00 Non Residential $500.00 Variance Appeal Residential and Non Residential $350.00 (4) Conditional Use Permit 547 (a) $500 + $5/$1,000 of project value (construction cost) up to a maximum fee of $3,500.00 (b) Major amendment—$500 + $5/$1,000 of project value (construction cost) up to a maximum fee of $3,500.00 (c) Minor amendment $350.00 (5) Interim Use Permit 547 $500 1,000 plus $100/year monitoring fee up to a maximum fee of $1,0001,500.00 (6) *Zoning District or Code Text Change 547 $1,0002,000.00 (7) *Subdivision Approval 500.01— 500.05 $500.00 Subdivision Waiver 500.05- Subd. 2 $350.00 (8) Street/Easement Vacation 820/State Statute $5001,000.00 (9) Appeal to Board of Adj. & Appeals 547 $350.00 (10) Special Request to City Council $350.00 (11) Zoning Compliance Letter $65.75.00 (12) Comprehensive Plan Amend. $1,000.00 (13) Plats* 500 Preliminary/Final Plat $775.00 (14) Sketch Plan Review $350.00 (15) Extension Extension of a Land Use Approval (rezoning, site plan approval, conditional use permit, variance, etc.) beyond its original approval period $250.00 (16) Escrow Administration Fee $50100.00 City of Richfield September 24, 2024 County of Hennepin State of Minnesota (17) Special Exception Review for Fences or Walls 509.15 Subd.13 A special fence exception may be issued per the restrictions of Section 509.15 for corner lots or through lots. $250.00 (18) Public Tree Planting Fund 544.03 Subd.8 For the planting of trees in public parks or public boulevards. $160.00 per caliper inch. *Any additional expenses incurred by the City in the course of processing a request will be charged to the applicant. FIRE SERVICES FEES Type of Permit or License Section Requiring Description Fee (6) Fire Extinguishing System Permit Based on Building Permit fee schedule with a minimum of: Plan review fee: 65% of building permit fee, except no fee for the following: (a) no charge for valuation of $1,000 or less $50.00 (7) Fire Alarm Systems Based on Building Permit fee schedule with a minimum of: Plan review fee: 65% of building permit fee, except no fee for the following: (a) No charge for valuation of $1,000 or less $50.00 (8) Flammable or Combustible Liquid or Gas Storage Tanks and Piping Tanks (installation or modification) $150.00 Installation or alteration of piping Each unit or dispenser $50.00 Underground Tank Removal $100.00/Tank MISCELLANEOUS FEES Type of Permit or License Section Requiring Description Fee (3) Antenna Commercial Wireless Telecommunication Service (CWTS) 425 & 544 (a) CWTS antenna permit application fee $100.00 (b) Antenna permit fee for additional antennas added to an existing antenna location or replacement of existing antennas at a location $35.00