1952-20r
RES~LUTIQBT N0. 2A
1
$~f1LUTSfl1T ACCEPTTCJG AND APPROVTl~1G PRLLIl~TARY' PLANS AND CGST ESTI-
A~TF~S ON PROPOSED STREET IPD'ROVII~TT FRQJECT N0. 124; t~tDERING A1~D
FILING `l'HERYOF; DF.~IE~AT~G THE SAFE AND ORDERING A iG THEREtiAT
BE ST BESt~V~ by the Village Council of the. Village of Richfield as
folla~sa
1. That the preliminax'y plans and .oust estimates for. _a general program of
street surfacing of all village-owed streets shall includ®a
Part 1. Oiling street surfaces openetrat3on method)
Part 2. • Oiling street surfaces ~ed..to a depth. of two inches)
part 3. ~'p~atig bituminous seal coat on e~sting blacktop streets,
prepared pursuant to a previous resolution of this Oouncil passed on April ].l~, 1952,
are hereby accepted, approved and ordered placed. on file in the. office of one Vil..
lags Clerks given Fhgineer~s Project No. 12$, and kept open. to public inspectLon.
2• That said improvements $ha7.1 he~aftsr be kr10Ti~n as Stsreet Improvement
Pro3®ct No. 128. . ,
3. Thai in case ,said improvements shall be made; that part of the total
cost thereof repraeentrig benefits .received as h@~after deterYnined by the Vil-
],age Council w3,]].1 be assessed against every assessable lot,'•piece, or pares~l of
land abutting on all village-owned ~~~~ets, based upon the benefits received.
- !~. That at the Village Na].1 in the ~ Village of Richfield, at 8 s00 o t cloak P.M,
~ the 30th day of dune, 1958, the Village Council.will_~e_t and hold a public
hearing on said proposed improvements; and that the Village _~lerk is hereby author..
ized and directed to publish noti.oe of said hearing. as. required by lair.
Motion to adopt the foregoing resolutioa mss seconded bg Trustee Lindeberg.
All members voted in favor thereof, and said resolution mss declared duly passed
and adopted.
Passed by the Village Council
ATTESTa
Leto Tr~t~oa~J
the 27th day of May, 1952.
~~~
Fred. C. Rel
1