2010-21BILL NO. 2010-21
TRANSITORY ORDINANCE N0.1871
AN ORDINANCE AMENDING APPENDIX D
TO THE RICHFIELD CITY CODE; ESTABLISHING A FEE SCHEDULE
FOR CERTAIN PERMITS AND APPLICATIONS
THE CITY OF RICHFIELD DOES ORDAIN:
Section 1. Background
1.01 Appendix D to the Richfield City Code consists of the schedule of fees
adopted by the City Council, including those adopted by resolution and
those adopted by ordinance.
1.02 Minnesota Statutes, Section 462.353 requires that certain fees be adopted
by ordinance. The City Council has previously established certain fees by
Transitory Ordinance No.1868.The City Council has established other fees
by resolution, which resolution is also part of Appendix D.
1.03 The City Council has determined the need to update the schedule of fees
under Transitory Ordinance No.1871.
Section 2. Fee Schedule Adopted
2.01 The fees set forth in the attached Exhibit A are hereby adopted by
ordinance.
2.02 The fees adopted at Section 2.01 of this Ordinance shall be amended only
by ordinance. Any fees established by resolution, other than those
adopted at Section 2.01 of this Ordinance, may be amended from time to
time by resolution of the City Council.
Section 3. Effective date; codification.
3.01 This ordinance is effective as of January 1, 2011.
3.02 A copy of this ordinance shall be included in Appendix D to the Richfield
City Code, immediately prior to the resolution establishing fees.
3.03 This ordinance supersedes Transitory Ordinance No.1868 to the extent
that Transitory Ordinance No.1868is inconsistent with this ordinance.
Adopted by the City Council of the City of Richfield, Minnesota this 12th day
of October, 2010.
1
r4_
Debbie oette ,Mayor
ATTEST:
f ~ ~` ~
Nancy Gibbs, i Clerk
EXHIBIT A
CONSTRUCTION AND RELATED PERMIT FEES AND CHARGES
A. Investigation Fees: Work without a Permit:
Investigation. Whenever any work for which a permit is required by this code has been
commenced without first obtaining said permit, a special investigation shall be made before
a permit may be issued for such work.
Fee. An investigation fee, in addition
permit is then or subsequently issued.
the permit fee required by this code.
the minimum fee set forth in Section
exempt any person from compliance
penalty prescribed by law.
to the permit fee, shall be collected whether or not a
The investigation fee shall be equal to the amount of
The minimum investigation fee shall be the same as
2. The payment of such investigation fee shall not
with all other provisions of this code nor from any
B. Permit fee refunds:
The building official may authorize refunding of not more than 80 percent of the permit fee
paid when no work has been done under a permit issued in accordance with this code.
The building official may authorize refunding of not more than 80 percent of the plan review
fee paid when an application for a permit for which a plan review fee has been paid is
withdrawn or canceled before any plan reviewing is done.
The building official shall not authorize refunding of any fee paid except on written
application filed by the original permittee not later than 180 days after the date of fee
payment.
TYPE OF PERMIT SECTION DESCRIPTION FEE
OR LICENSE REQUIRING
(a) Inspections outside of normal business $60.00
hours (minimum charge -two hours) per hour
(b) Reinspection fees $60.00
(minimum charge $35.00) per hour
(c) Inspections for which no fee is $60.00
specifically indicated (minimum charge - per hour
one-half hour
(d) Additional plan review required by $60.00
changes, additions or revision to plans per hour
(minimum charge -two hours)
(e) Fee to reissue building inspection $35.00
record card
*Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include
supervision,
overhead, a uipment, hour) wa es and frin a benefits of the em to ee involved.
(1) Buildin Permits 400.03- $1 to $500 $35.00
TYPE OF PERMIT SECTION DESCRIPTION FEE
OR LICENSE REQUIRING
400.09 (includes one inspection)
Each additional inspection $35.00
$501 to $2,000 $25.00 for the first $500 plus
$3.25 each additional $100, or
fraction thereof, to and including
$2,000 with a minimum fee of
$35.00.
$2,001 to $25,000 $73.50 for the first $2,000 plus
$14.75 for each additional
$1,000, or fraction thereof, to and
includin $25,000.
$25,001 to $50,000 $415.75 for the first $25,000 plus
$10.75 for each additional
$1,000, or fraction thereof, to and
includin $50,000.
$50,001 to $100,000 $682.50 for the first $50,000 plus
$7.50 for each additional $1,000,
or fraction thereof, to and
includin $100,000.
$100,001 to $500,000 $1,053.50 for the first $100,000
plus $6.00 for each additional
$1,000, or fraction thereof, to and
includin $500,000.
$500,001 to $1,000,000 $3,427.75 for the first $500,000
plus $5.00 for each additional
$1,000, or fraction thereof, to and
includin $1,000,000.
1,000,001 and up $5,945.25 for the first $1,000,000
plus $4.00 for each additional
$1,000, or fraction thereof.
(2) Driveway, 515.05 (no permit fee for sidewalks) $ 35.00
Parking Area
Permits
(3) Swimming 420.00 Permanent or portable pools are based on
building permit fees with a minimum of $ 35.00
TYPE OF PERMIT SECTION DESCRIPTION FEE
OR LICENSE REQUIRING
(4) Plan Review Fee 400.03- 35% of building permit fee for one and two family dwelling
400.09 detached garages and basement remodels
65% of building permit fee for all other building permits,
except no fee for the following:
(a)Existing single family dwelling minor nonstructural
alterations.
(b)Single and two family dwelling repair and maintenance
work.
(c)Commercial and industrial repair and maintenance work
Plan review fee not exceeding $1,000 or where plans are not required.
for similar
buildings Maximum 25% of permit fee based on Minnesota State
Building Code 1300.0160
(5) Contractors Charged once each time a contractor $ 5.00
License applies for permit(s)
Verification Fee
(6) Moving - 845 Moving Permit Fee $ 50.00
Buildings
(7) Structure 400.00- (a) Commercial
Demolition 400.09 Demolition cost as per Building Permit
Schedule with a minimum of $ 50.00
(b) Dwelling
One or two story $ 50.00
Residential -Garage and lesser $ 35.00
structure
TYPE OF
PERMIT SECTION
DESCRIPTION
FEE
REQUIRING
OR LICENSE
(8) Plumbing 400.03- Residential
Permit 400.09 Minimum Fee 2% of Total Job cost with a minimum $ 35.00
of
(includes one inspection)
$ 35.00
Each additional inspection
(9) Plumbing 400.03- Commercial/Industrial/Multi-family Based on Total
Permit 400.09 Job cost
2% of Estimated Job cost with a minimum of $ 45.00
(includes one inspection)
Each additional inspection $ 35.00
Plan Review 10% of permit fee when the job
cost exceeds $50,000
(10) Electrical 400.03- Residential
Permit 400.09 (a) Minimum Fee which includes one $ 35.00
inspection $ 35.00
(b) Each additional Inspection $ 150.00
TYPE OF
PERMIT SECTION
DESCRIPTION
FEE
OR LICENSE REQUIRING
(c) Complete Wiring Fee:
Single Family Dwelling and each dwelling
unit of a two family dwelling and includes not
more than three inspections. $ 55.00
(d) New Service - up to 200 amps $ 45.00
(e) Temporary Service - (for construction)
(f) Installation, addition alteration, or repair $ 8.00
of each circuit or feeder $ 55.00
Swimmin ool or exterior hot tub
(11) Electrical 400.03- Commercial, Industrial and multiple dwellings
Permit 400.09 (more than two units) and Technology systems:
Commercial Minimum Fee which includes one inspection $ 45.00
Each additional inspection $ 35.00
(a) Based on total job cost
- 2% of estimated job cost with a minimum $ 45.00
of
- Over $50,000 -Fee/ $1,000.00
plus 1 1/2% of cost over $50,000.00 $ 185.00
(b) Traffic Signals: Per Intersection
(c) Fire Alarm: Based on 3/4% of cost of $ 45.00
electrical job to customer with a minimum of
(d) Carnivals, festivals and similar events $ 110.00
plus $35.00 for each service on generator
(12) Electrical 400.03- Based on 2% of cost of electrical job to
Permit 400.09 customer with a minimum of $ 45.00
Si ns (separate electrical permit required for si ns)
(13) Residential 400.03- Central Systems and Additions, Alterations and
Heating, 400.09 Repairs $ 35.00
Ventilating, 1 1/2% estimated cost with a minimum of
Air (Includes one inspection) $ 35.00
Conditioning Each additional inspection
and
Refrigeration
$ 45.00
Commercial Central Systems and Additions, Alterations and
Heating, Repairs
Ventilating, 1 1/2% estimated cost with a minimum of
Air
Conditioning
and
Refrigeration Plan Review of 10% of permit fee when the job
cost exceeds $50,000.
(14) Sign 415.01- (a) Temporary sign permit $ 35.00
Installation 415.11 (b) Permanent sign (any size) $ 100.00
Building permit is required for sign support
structures Fees based on building permit fee
TYPE OF SECTION
PERMIT DESCRIPTION FEE
REQUIRING
OR LICENSE
schedule
BOLD represents added/amended fees
ZONING. LAND USE AND RELATED CHARGES
TYPE OF PERMIT SECTION DESCRIPTION FEE
OR LICENSE REQUIRING
(1) Planned Unit 542 (a) $500 plus $5/ $1,000 of project value up
Development to a maximum fee of $ 3,500.00
(b) PUD Plan Amendment fee -major $ 550.00
(c) PUD Plan Amendment fee -minor $ 350.00
(2) Site Plan Review 547 (a) $500 plus $.50 / $1,000 of project value
to a maximum fee of $ 3,500.00
(b) Major amendment $ 500.00
(c) Minor amendment $ 350.00
(3) Variance 547 Residential $ 400.00
Non Residential $ 600.00
Extension $ 75.00
Variance Appeal Residential and Non Residential $ 225.00
(4) Conditional Use 547 (a) $500 + $.50/$1,000 of project value to a
Permit maximum fee of $ 3,500.00
(b) Major amendment $ 500.00
(c) Minor amendment $ 350.00
(5) Interim Use 547 $ 500.00
Permit
(6) `Zoning District 547 $ 500.00
Chan e
(7) *Subdivision 500.01- $ 500.00
Approval 500.05
Subdivision $ 350.00
Waiver 500.05-Subd.
2
(8) Street Vacation 820 $ 350.00
(9) Appeal to Board 547 $ 350.00
of Adj. & Appeals
(10) Special $ 350.00
Request to City
Council
(11) Zoning $ 50.00
Compliance
TYPE OF PERMIT SECTION DESCRIPTION FEE
OR LICENSE REQUIRING
Letter
(12) Comprehensive $ 600.00
Plan Amend.
(13) Plat: $ 500.00
preliminary &
final
*Any additional expense of notification necessitated by applicants request for continuance will be
charged to the applicant.
BOLD represents added/amended fees
PUBLIC WORKS FEES
TYPE OF PERMIT
OR LICENSE SECTION
REQUIRING DESCRIPTION FEE
(8) Utility Services
Sanitary Sewer 700.05 All land uses
New Service $ 100.00
Repair $ 100.00
Disconnect $ 100.00
Replacement $ 100.00
Water Service 715.01 All land uses
New Service $ 100.00
Repair $ 100.00
Disconnect $ 100.00
Replacement $ 100.00
Turn on/off $ 50.00
Meter Installation $ 50.00
Private Hydrant $ 50.00
Storm Sewer 720 All land uses
New Service $ 100.00
Repair $ 100.00
Disconnect $ 100.00
Replacement $ 100.00
FIRE SERVICES FEES
TYPE OF PERMIT
OR LICENSE SECTION
REQUIRING DESCRIPTION FEE
(6) Fire Based on Building Permit fee schedule with
Extinguishing a minimum of: $ 50.00
System Permit
Plan review fee: 65% of building permit fee,
except no fee for the following:
(a no char a for valuation of $1,000 or less
(7) Fire Alarm Based on Building Permit fee schedule with
Systems a minimum of: $ 50.00
Plan review fee: 65% of building permit fee,
except no fee for the following:
(a) no char a for valuation of $1,000 or less
(8) Flammable or Tanks (installation or modification $ 150.00
Combustible
Liquid or Gas Installation or alteration of piping
Storage Tanks Each unit or dispenser $ 50.00
and Piping
Under round Tank Removal $ 100.00/Tank
MISCELLANEOUS FEES
TYPE OF PERMIT
OR LICENSE SECTION
REQUIRING DESCRIPTION FEE
(3) Antenna 426 (a) CWTS antenna permit application fee $ 100.00
Commercial (b) Antenna permit fee for additional $ 35.00
Wireless antennas added to an existing antenna
Telecommunicati location
on
Service CWTS)
BOLD represents added/amended fees