Loading...
2010-21BILL NO. 2010-21 TRANSITORY ORDINANCE N0.1871 AN ORDINANCE AMENDING APPENDIX D TO THE RICHFIELD CITY CODE; ESTABLISHING A FEE SCHEDULE FOR CERTAIN PERMITS AND APPLICATIONS THE CITY OF RICHFIELD DOES ORDAIN: Section 1. Background 1.01 Appendix D to the Richfield City Code consists of the schedule of fees adopted by the City Council, including those adopted by resolution and those adopted by ordinance. 1.02 Minnesota Statutes, Section 462.353 requires that certain fees be adopted by ordinance. The City Council has previously established certain fees by Transitory Ordinance No.1868.The City Council has established other fees by resolution, which resolution is also part of Appendix D. 1.03 The City Council has determined the need to update the schedule of fees under Transitory Ordinance No.1871. Section 2. Fee Schedule Adopted 2.01 The fees set forth in the attached Exhibit A are hereby adopted by ordinance. 2.02 The fees adopted at Section 2.01 of this Ordinance shall be amended only by ordinance. Any fees established by resolution, other than those adopted at Section 2.01 of this Ordinance, may be amended from time to time by resolution of the City Council. Section 3. Effective date; codification. 3.01 This ordinance is effective as of January 1, 2011. 3.02 A copy of this ordinance shall be included in Appendix D to the Richfield City Code, immediately prior to the resolution establishing fees. 3.03 This ordinance supersedes Transitory Ordinance No.1868 to the extent that Transitory Ordinance No.1868is inconsistent with this ordinance. Adopted by the City Council of the City of Richfield, Minnesota this 12th day of October, 2010. 1 r4_ Debbie oette ,Mayor ATTEST: f ~ ~` ~ Nancy Gibbs, i Clerk EXHIBIT A CONSTRUCTION AND RELATED PERMIT FEES AND CHARGES A. Investigation Fees: Work without a Permit: Investigation. Whenever any work for which a permit is required by this code has been commenced without first obtaining said permit, a special investigation shall be made before a permit may be issued for such work. Fee. An investigation fee, in addition permit is then or subsequently issued. the permit fee required by this code. the minimum fee set forth in Section exempt any person from compliance penalty prescribed by law. to the permit fee, shall be collected whether or not a The investigation fee shall be equal to the amount of The minimum investigation fee shall be the same as 2. The payment of such investigation fee shall not with all other provisions of this code nor from any B. Permit fee refunds: The building official may authorize refunding of not more than 80 percent of the permit fee paid when no work has been done under a permit issued in accordance with this code. The building official may authorize refunding of not more than 80 percent of the plan review fee paid when an application for a permit for which a plan review fee has been paid is withdrawn or canceled before any plan reviewing is done. The building official shall not authorize refunding of any fee paid except on written application filed by the original permittee not later than 180 days after the date of fee payment. TYPE OF PERMIT SECTION DESCRIPTION FEE OR LICENSE REQUIRING (a) Inspections outside of normal business $60.00 hours (minimum charge -two hours) per hour (b) Reinspection fees $60.00 (minimum charge $35.00) per hour (c) Inspections for which no fee is $60.00 specifically indicated (minimum charge - per hour one-half hour (d) Additional plan review required by $60.00 changes, additions or revision to plans per hour (minimum charge -two hours) (e) Fee to reissue building inspection $35.00 record card *Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, a uipment, hour) wa es and frin a benefits of the em to ee involved. (1) Buildin Permits 400.03- $1 to $500 $35.00 TYPE OF PERMIT SECTION DESCRIPTION FEE OR LICENSE REQUIRING 400.09 (includes one inspection) Each additional inspection $35.00 $501 to $2,000 $25.00 for the first $500 plus $3.25 each additional $100, or fraction thereof, to and including $2,000 with a minimum fee of $35.00. $2,001 to $25,000 $73.50 for the first $2,000 plus $14.75 for each additional $1,000, or fraction thereof, to and includin $25,000. $25,001 to $50,000 $415.75 for the first $25,000 plus $10.75 for each additional $1,000, or fraction thereof, to and includin $50,000. $50,001 to $100,000 $682.50 for the first $50,000 plus $7.50 for each additional $1,000, or fraction thereof, to and includin $100,000. $100,001 to $500,000 $1,053.50 for the first $100,000 plus $6.00 for each additional $1,000, or fraction thereof, to and includin $500,000. $500,001 to $1,000,000 $3,427.75 for the first $500,000 plus $5.00 for each additional $1,000, or fraction thereof, to and includin $1,000,000. 1,000,001 and up $5,945.25 for the first $1,000,000 plus $4.00 for each additional $1,000, or fraction thereof. (2) Driveway, 515.05 (no permit fee for sidewalks) $ 35.00 Parking Area Permits (3) Swimming 420.00 Permanent or portable pools are based on building permit fees with a minimum of $ 35.00 TYPE OF PERMIT SECTION DESCRIPTION FEE OR LICENSE REQUIRING (4) Plan Review Fee 400.03- 35% of building permit fee for one and two family dwelling 400.09 detached garages and basement remodels 65% of building permit fee for all other building permits, except no fee for the following: (a)Existing single family dwelling minor nonstructural alterations. (b)Single and two family dwelling repair and maintenance work. (c)Commercial and industrial repair and maintenance work Plan review fee not exceeding $1,000 or where plans are not required. for similar buildings Maximum 25% of permit fee based on Minnesota State Building Code 1300.0160 (5) Contractors Charged once each time a contractor $ 5.00 License applies for permit(s) Verification Fee (6) Moving - 845 Moving Permit Fee $ 50.00 Buildings (7) Structure 400.00- (a) Commercial Demolition 400.09 Demolition cost as per Building Permit Schedule with a minimum of $ 50.00 (b) Dwelling One or two story $ 50.00 Residential -Garage and lesser $ 35.00 structure TYPE OF PERMIT SECTION DESCRIPTION FEE REQUIRING OR LICENSE (8) Plumbing 400.03- Residential Permit 400.09 Minimum Fee 2% of Total Job cost with a minimum $ 35.00 of (includes one inspection) $ 35.00 Each additional inspection (9) Plumbing 400.03- Commercial/Industrial/Multi-family Based on Total Permit 400.09 Job cost 2% of Estimated Job cost with a minimum of $ 45.00 (includes one inspection) Each additional inspection $ 35.00 Plan Review 10% of permit fee when the job cost exceeds $50,000 (10) Electrical 400.03- Residential Permit 400.09 (a) Minimum Fee which includes one $ 35.00 inspection $ 35.00 (b) Each additional Inspection $ 150.00 TYPE OF PERMIT SECTION DESCRIPTION FEE OR LICENSE REQUIRING (c) Complete Wiring Fee: Single Family Dwelling and each dwelling unit of a two family dwelling and includes not more than three inspections. $ 55.00 (d) New Service - up to 200 amps $ 45.00 (e) Temporary Service - (for construction) (f) Installation, addition alteration, or repair $ 8.00 of each circuit or feeder $ 55.00 Swimmin ool or exterior hot tub (11) Electrical 400.03- Commercial, Industrial and multiple dwellings Permit 400.09 (more than two units) and Technology systems: Commercial Minimum Fee which includes one inspection $ 45.00 Each additional inspection $ 35.00 (a) Based on total job cost - 2% of estimated job cost with a minimum $ 45.00 of - Over $50,000 -Fee/ $1,000.00 plus 1 1/2% of cost over $50,000.00 $ 185.00 (b) Traffic Signals: Per Intersection (c) Fire Alarm: Based on 3/4% of cost of $ 45.00 electrical job to customer with a minimum of (d) Carnivals, festivals and similar events $ 110.00 plus $35.00 for each service on generator (12) Electrical 400.03- Based on 2% of cost of electrical job to Permit 400.09 customer with a minimum of $ 45.00 Si ns (separate electrical permit required for si ns) (13) Residential 400.03- Central Systems and Additions, Alterations and Heating, 400.09 Repairs $ 35.00 Ventilating, 1 1/2% estimated cost with a minimum of Air (Includes one inspection) $ 35.00 Conditioning Each additional inspection and Refrigeration $ 45.00 Commercial Central Systems and Additions, Alterations and Heating, Repairs Ventilating, 1 1/2% estimated cost with a minimum of Air Conditioning and Refrigeration Plan Review of 10% of permit fee when the job cost exceeds $50,000. (14) Sign 415.01- (a) Temporary sign permit $ 35.00 Installation 415.11 (b) Permanent sign (any size) $ 100.00 Building permit is required for sign support structures Fees based on building permit fee TYPE OF SECTION PERMIT DESCRIPTION FEE REQUIRING OR LICENSE schedule BOLD represents added/amended fees ZONING. LAND USE AND RELATED CHARGES TYPE OF PERMIT SECTION DESCRIPTION FEE OR LICENSE REQUIRING (1) Planned Unit 542 (a) $500 plus $5/ $1,000 of project value up Development to a maximum fee of $ 3,500.00 (b) PUD Plan Amendment fee -major $ 550.00 (c) PUD Plan Amendment fee -minor $ 350.00 (2) Site Plan Review 547 (a) $500 plus $.50 / $1,000 of project value to a maximum fee of $ 3,500.00 (b) Major amendment $ 500.00 (c) Minor amendment $ 350.00 (3) Variance 547 Residential $ 400.00 Non Residential $ 600.00 Extension $ 75.00 Variance Appeal Residential and Non Residential $ 225.00 (4) Conditional Use 547 (a) $500 + $.50/$1,000 of project value to a Permit maximum fee of $ 3,500.00 (b) Major amendment $ 500.00 (c) Minor amendment $ 350.00 (5) Interim Use 547 $ 500.00 Permit (6) `Zoning District 547 $ 500.00 Chan e (7) *Subdivision 500.01- $ 500.00 Approval 500.05 Subdivision $ 350.00 Waiver 500.05-Subd. 2 (8) Street Vacation 820 $ 350.00 (9) Appeal to Board 547 $ 350.00 of Adj. & Appeals (10) Special $ 350.00 Request to City Council (11) Zoning $ 50.00 Compliance TYPE OF PERMIT SECTION DESCRIPTION FEE OR LICENSE REQUIRING Letter (12) Comprehensive $ 600.00 Plan Amend. (13) Plat: $ 500.00 preliminary & final *Any additional expense of notification necessitated by applicants request for continuance will be charged to the applicant. BOLD represents added/amended fees PUBLIC WORKS FEES TYPE OF PERMIT OR LICENSE SECTION REQUIRING DESCRIPTION FEE (8) Utility Services Sanitary Sewer 700.05 All land uses New Service $ 100.00 Repair $ 100.00 Disconnect $ 100.00 Replacement $ 100.00 Water Service 715.01 All land uses New Service $ 100.00 Repair $ 100.00 Disconnect $ 100.00 Replacement $ 100.00 Turn on/off $ 50.00 Meter Installation $ 50.00 Private Hydrant $ 50.00 Storm Sewer 720 All land uses New Service $ 100.00 Repair $ 100.00 Disconnect $ 100.00 Replacement $ 100.00 FIRE SERVICES FEES TYPE OF PERMIT OR LICENSE SECTION REQUIRING DESCRIPTION FEE (6) Fire Based on Building Permit fee schedule with Extinguishing a minimum of: $ 50.00 System Permit Plan review fee: 65% of building permit fee, except no fee for the following: (a no char a for valuation of $1,000 or less (7) Fire Alarm Based on Building Permit fee schedule with Systems a minimum of: $ 50.00 Plan review fee: 65% of building permit fee, except no fee for the following: (a) no char a for valuation of $1,000 or less (8) Flammable or Tanks (installation or modification $ 150.00 Combustible Liquid or Gas Installation or alteration of piping Storage Tanks Each unit or dispenser $ 50.00 and Piping Under round Tank Removal $ 100.00/Tank MISCELLANEOUS FEES TYPE OF PERMIT OR LICENSE SECTION REQUIRING DESCRIPTION FEE (3) Antenna 426 (a) CWTS antenna permit application fee $ 100.00 Commercial (b) Antenna permit fee for additional $ 35.00 Wireless antennas added to an existing antenna Telecommunicati location on Service CWTS) BOLD represents added/amended fees