Loading...
2010-16CITY OF RICHFIELD BILL NO. 2010-16 AN ORDINANCE RELATING TO EROSION AND SEDIMENTATION CONTROL REGULATIONS; AMENDING SECTIONS 428.03, 428.05, 428.11 and 428.13 OF THE RICHFIELD CITY CODE THE CITY OF RICHFIELD DOES ORDAIN: Section 1. Subsection 428.03 of the Richfield City Code is amended to read as follows: 428.03. Administration. The City Council hereby designates the Building Official as the Administrator of this Section. Erosion control plans shall be reviewed and approved under the existing building permit process. Applications for a permit shall include information reauired by this Code. Applications for a permit for projects within the Minnehaha Creek Watershed District jurisdiction shall include anv additional information reauired for an application under Minnehaha Creek Watershed District. Rule B. A fee in addition to the building permit fee is not required for erosion control plan review. Section 2. Subsection 428.05 of the Richfield City Code is amended to read as follows: 428.05. Performance standards for erosion and sedimentation control. The design, testing, installation, and maintenance of erosion and sediment control operations and facilities shall adhere to the standards and specifications contained in the Minnesota Pollution Control Agency's handbook of best management practices entitled, "Protecting Water Quality in Urban Areas" dated 1989, as amended.-, or if a facility or measure is not addressed in that handbook. then to the provisions of the "Erosion and Sediment Control Manual" (Hennepin Conservation District. 1989, as revised. Section 3. Subsection 428.11 of the Richfield City Code is amended to read as follows: 428.11. Erosion control plans. Subdivision 1. Land disturbing activities not exempt from this Section shall be required to have an approved erosion control plan on file with the City prior to commencement of construction. Subd. 2. The erosion control plan shall contain all information necessary for the City Engineer to determine that adequate erosion control and sedimentation measures are proposed. The plan shall include a topographic map showing existing and proposed contours, location of any natural water courses, storm sewers, and drainage ways. The extent of the land disturbing activity and any erosion control measures shall be shown on the submitted erosion control plan. Unless otherwise authorized by the administrator the following information shall be submitted with the site map and grading plan: (a) Existing and proposed topography of the site showing contour intervals of no less than two 2~ feet. (b) Contour lines extending beyond the property boundaries for a distance sufficient to show the relationship between on- site and off-site drainage, "~ ~+ ;n n„ ,.~~o io~~ +h~n ~ nn foo+ (c) Property lines shown in true location with respect to topographic information on the plan. (d) Location and graphic representation of all existing and proposed natural and man-made drainage facilities. (e) Detailed plans of any surface and sub-surface drainage devices, walls, cribbing, dams, and other devices to be constructed with or as part of the proposed work and a map showing the drainage area and the estimated runoff of the areas served by any drain. (f) Location and graphic representation of proposed excavation, fill, on-site storage of soil and other earth material, and on- site disposal of earth material. (g) Location of proposed final surface runoff,. erosion and sediment control measures. (h) Quantity, in cubic yards, of soil or earth material to be excavated, filled, stored or otherwise utilized on-site. (i) Outline of the methods to be used to clear vegetation and to store and dispose of cleared vegetative matter. Q) Proposed sequence and schedule of excavation, filling, and other land disturbing and filling activities, and soil or earth material storage or disposal. 2 (k) Location of any buildings or structures on the property where the work is to be performed and the location of any buildings or structures on adjacent properties that are within fifteen (15) feet of the property line of the subject property or that may be affected by the proposed grading operations. (I) A narrative report summarizing the proposed erosion control measures shall be submitted. This report shall describe the timing of the installation, phasing, stabilization of all erosion control structures, and maintenance and eventual removal of all erosion control structures. (m) For land disturbina activities within the Minnehaha Creek Watershed District jurisdiction. anv other information reauired for an aaalication by Minnehaha Creek Watershed District, Rule B. Section 4. Subsection 428.13 of the Richfield City Code is amended to read as follows: 428.13. Maintenance of erosion control measures. Subdivision 1. It shall be responsibility of the owner/developer to maintain all erosion control structures in a condition that will ensure continuous functioning of those devices. If, after the installation of the erosion control structure, the City Engineer determines that additional measures are needed, they shall be installed at the expense of the owner. Subd. 2. Any erosion or sediment that runs off or blows off the site onto adjoining properties, City streets, storm sewer, etc. shall be the responsibility of the owner or developer for clean-up and restoration. If the owner fails to properly clean up or restore all areas affected by erosion, the City will hire a contractor to complete the work and bill the owner for the expenses associated with the clean-up, tkx. °°"~°°~T ~w ~^" ;~ d~~~";~t°~~s-or~c~~~~"~aao~~. Failure to maintain these measures shall be a violation of this Section. Subd. 3. The Citv may reauire an applicant to provide a bond or other financial auarantee in form satisfactory to the Citv to auarantee the installation and maintenance of erosion control measures and compliance with the reauirements of this Section. 3 Section 5. This ordinance is effective in accordance with section 3.09 of the Richfield City Charter. Passed by the City Council of the City of Richfield, Minnesota this 14tH day of September, 2010. ebbie Goettel, Mayor ATTEST: Nancy Gibbs ity Clerk