91-7737R98 RESOLUTION NO. 7737 RESOLUTION RELATING TO I35W ENVIRONMENTAL IMPACT STATEMENT DELAY AND SPLIT OF ENVIRONMENTAL IMPACT STATEMENT INTO TWO PORTIONS WHEREAS, the Minnesota .Department of Transportation (MnDOT), Metropolitan Council and Federal Highway Administration (parties) have been preparing an Environmental Impact Statement (EIS) for I35W from I494 south for several. years; and and WHEREAS, said EIS has been delayed and the schedule revised; WHEREAS, one-cause of said delays has been the inclusion of an alternative known as the Neighborhood Transportation Network (NTN) Alternative being proposed by a Minneapolis neighborhood group; and WHEREAS, after study, this alternative was found to not meet safety requirements, not be buildable in accordance with roadway standards and was replaced with another alternative which incorporated several of the major aspects of the NTN Alternative; and WHEREAS, Hennepin County and the City of Minneapolis have recently requested that the NTN Alternative be put back into the EIS; and WHEREAS, such reinclusion would likely cause further delay, additional costs and potentially a decision that would result in the construction of an unsafe roadway which would provide less capacity than the current facility; and WHEREAS, such delays may also result in the interim third lane project from I494 south of the Minnesota River not being able to be undertaken in 1993 as programmed; and WHEREAS, MnDOT funding decisions have now removed the necessary manpower or consultant funds to do the design of said interim project; and WHEREAS, the timely and appropriate improvement of I35W is very important to the well being of the community and to the safety of users of the facility. NOW, THEREFORE, BE IT RESOLVED that the parties are requested to maintain their position that the NTN Alternative is not an implementable alternative. Resolution No. 7737 Page 2 BE IT FURTHER RESOLVED', that MnDOT should provide design staff or consultant funds fro prepare the necessary plans and drawings to avoid delays on the .interim third lane project south of I494; however, an accept~lable plan must be developed for making the transition back to the existing two lanes without imposing unacceptable demands on surface streets. BE IT FURTHER RESOLVE reinserted that the MnDOT, Highway Administration sho with one portion being the Crosstown Commons section, portion south of the 62 Cr 68th Street to Burnsville process of providing the s facility would bring to th that if the NTN Alternative is etropolitan Council and Federal d split the EIS into two portions ity of Minneapolis and the 62 nd the second portion being that stown Commons .section beginning at order to not unduly delay the ety and service this badly needed people of this region. Passed by the City Council'~of the City of Richfield, Minnesota, this 8th day of April, 1991,. Martin J. irsch Mayor ATTEST: ~~ ,-~ `~ ' homas P. Ferber City Clerk