Loading...
09-22 Bill No. 2020-12BILL NO. 2020-12 TRANSITORY ORDINANCE NO. 19.15 AN ORDINANCE AMENDING APPENDIX D TO THE RICHFIELD CITY CODE; ESTABLISHING A FEE SCHEDULE FOR CERTAIN PERMITS AND APPLICATIONS THE CITY OF RICHFIELD DOES ORDAIN: Section 1. Background 1.01 Appendix D to the Richfield City Code consists of the schedule of fees adopted by the City Council, including those adopted by resolution and those adopted by Ordinance. 1.02 Minnesota Statutes, Section 462.353 requires that certain fees be adopted by Ordinance. The City Council has previously established certain fees by Transitory Ordinance No. 19.11. The City Council has established other fees by resolution, which resolution is also part of Appendix D. 1.03 The City Council has determined the need to update the schedule of fees under Transitory Ordinance No. 19.11. Section 2. Fee Schedule Adopted 2.01 The fees set forth in the attached Exhibit A are hereby adopted by Ordinance. 2.02 The fees adopted at Section 2.01 of this Ordinance shall be amended only by Ordinance. Any fees established by resolution, other than those adopted at Section 2.01 of this Ordinance, may be amended from time to time by resolution of the City Council. Section 3. Effective date; codification. 3.01 This Ordinance is effective in accordance with Section 3.09 of the City Charter. 3.02 This Ordinance shall take effect January 1, 2021. 3.03 A copy of this Ordinance shall be included in Appendix D to the Richfield City Code, immediately prior to the resolution establishing fees. 3.04 This Ordinance supersedes Transitory Ordinance No. 19.11. Adopted by the City Council of the City of Richfield, Minnesota this 22nd day of September 2020. Maria Regan Gonzalez, Mayor ATTEST: Elizabeth VanHoose, City Clerk Bill No. 2020-12 EXHIBIT A CONSTRUCTION AND RELATED PERMIT FEES AND CHARGES A. Investigation Fees: Work without a Permit: Investigation. Whenever any work for which a permit is required by this code has been commenced without first obtaining said permit, a special investigation shall be made before a permit may be issued for such work. Fee. An investigation fee, in addition to the permit fee, shall be collected whether or not a permit is then or subsequently issued. The investigation fee shall be equal to the amount of the permit fee required by this code. The minimum investigation fee shall be the same as the minimum fee set forth in Section 2. The payment of such investigation fee shall not exempt any person from compliance with all other provisions of this code nor from any penalty prescribed by law. B. Permit fee refunds: Bill No. 2020-12 .................................................................... .......... ........................................................................................................................................................................................................................................................................................ $1 to $500 (includes one inspection) .......... ........................................................................................................................................................... $40.00 .......... ........................................................................................................................................................................................................................................................................................ Each additional inspection .......... ........................................................................... $40.00 $26.25 for the first $500 plus $3.50 each $501 to $2,000 additional $100, or fraction thereof, to and including $2,000 with a minimum fee of $40.00. $77.25 for the first $2,000 plus $15.50 for $2,001 to $25,000 each additional $1,000, or fraction thereof, to and including $25,000. �(1) Building 400.03— Permits 400.09 $436.50 for the first $25,000 plus $11.25 for $25,001 to $50,000 each additional $1,000, or fraction thereof, to and including $50,000. $716.75 for the first $50,000 plus $7.75 for $50,001 to $100,000 each additional $1,000, or fraction thereof, to and including $100,000. $1,106.25 for the first $100,000 plus $6.25 for $100,001 to $500,000 each additional $1,000, or fraction thereof, to and including $500,000. ............................................................................................................................. $3,599.25 for the first $500,000 plus $5.25 for $500,001 to $1,000,000 each additional $1,000, or fraction thereof, to and including $1,000,000. Bill No. 2020-12 $6,242.50 for the first $1,000,000 plus $4.25 for 1,000,001 and up each additional $1,000, or fraction thereof. (2) Driveway, Parking Area 515.05 (no permit fee for sidewalks) $40.00 Permits Permanent or portable pools are based on .. (3) Swimming 420.00 $40.00 building permit fees with a minimum of 35% of building permit fee for one and two family dwelling basement remodels 65% of building permit fee for all other building permits, except no fee for the following: (4) Plan Review 400.03— Fee 400.09 (a) Existing single family dwelling minor nonstructural alterations. (b) Single and two family dwelling repair and maintenance work. (c) Commercial and industrial repair and maintenance work not exceeding $1,000 or where plans are not required. Plan review fee for Maximum 25% of permit fee based on Minnesota State Building Code similar buildings 1300.0160 (5) Contractors Charged once each time a contractor applies License $5.00 for permit(s) Verification Fee (6) Moving- .. 845 Moving Permit Fee $50.00 Buildings (a) Commercial Demolition cost as per $50.00 Building Permit Schedule with a minimum of (7) Structure 400.00— ..., Demolition 400.09 (b) Dwelling $50.00 One or two story $40.00 Residential - Garage and lesser structure Bill No. 2020-12 Residential Minimum Fee 2% of Total Job cost with a $40.00 '(8) Plumbing 400.03— minimum of (includes one inspection) Permit 00.09 4 .......... ........................................................................................................................................................................................................................................................................................ Each additional inspection .......... .......................................................................................................................................................... $40.00 Commercial/industrial/Multi-family Based on Total Job cost ' $45.00 (9) Plumbing 400.03— 2% of Estimated Job cost with a minimum Permit 400.09 of(includes one inspection) Each additional inspection $40.00 Residential (a) Minimum Fee which includes one $40.00 inspection ..................... ............................................................................................................................................................................................................................................................................ (b) Each additional Inspection .......... .......................................................................................................................................................... $40.00 (c) Complete Wiring Fee: Single Family Dwelling and each dwelling unit $165.00 of a two family dwelling and includes not more than three inspections. �(10) Electrical 400.03— Permit 400.09 ..................... ............ (d) New Service - up to 200 amps $100.00 ..................... ............................................................................................................................................................................................................................................................................ (e) Temporary Service - (for construction) .......... ................................................................................. $45.00 ..................... ............................................................................................................................................................................................................................................................................ (f) Sub Panel .......... ...................................................................................................................................................... $55.00 (g) Installation, addition alteration, or $8.00 repair of each circuit or feeder ..................... ............................................................................................................................................................................................................................................................................ (h) Swimming pool or exterior hot tub .......... .......................................................................................................................................................... $55.00 Commercial, Industrial and multiple dwellings(more than two units) and �(11) Electrical $45.00 400.03— Technology systems: Minimum Fee which Permit 400.09 includes one inspection �Commercial ............... Each additional inspection $40.00 Bill No. 2020-12 (a) Based on total job cost - 2% of estimated job cost with a minimum of $45.00 - Over $50,000 - Fee/ $1,000.00 plus 1% of cost over $50,000.00 (b) Traffic Signals: Per Intersection $185.00 (c) Fire Alarm: Based on %% of cost of $45.00 electrical job to customer with a minimum of (d) Carnivals, festivals and similar events $110.00 plus $35.00 for each service on generator (12) Electrical 400.03— Based on 2% of cost of electrical job to Permit Signs 400.09 customer with a minimum of (separate electrical permit required for signs) (13) Solar Photovoltaic System Rating* 0-5,000 watts 5,001-10,000 watts 10,001-20,000 watts 20,001-30,000 watts 30,001-40,000 watts 40,001 and over Central Systems and Additions, Alterations (14) Residential and Repairs Heating, 400.03— 1%% estimated cost with a minimum of Ventilating, Air 400.09 (Includes one inspection) Conditioning and Refrigeration Each additional inspection Commercial Heating, $45.00 $60.00 $40.00 $40.00 Central Systems and Additions, Alterations $45.00 and Repairsl%% estimated cost with a Bill No. 2020-12 6 ............................................................................................................................ Ventilating, Air minimum of 'Conditioning and Refrigeration ............................................................................................................................ (a) Temporary sign permit (15) Sign 415.01— (b) Permanent sign (any size) $40.00 Installation 415.11 Building permit is required for sign support $100.00 structures fees based on building permit fee schedule ............................................................................................................................. A temporary Certificate of Occupancy may be ............. $200.00 �(16) Temporary issued before completion of the entire work Plus a letter of credit or Certificate of 400 covered by the permit, provided the Chief cash escrow equal to �Occupancy Building Official deems that the building is 125% of the remaining safe to occupy City Code requirements ZONING, LAND USE AND RELATED CHARGES �Type of Permit or Section Description Fee License Requiring (a) $1,000 plus $5/$1,000 of project value $5,000.00 (construction cost) up to a maximum fee of �(1) Planned Unit (b) Major PUD Plan Amendment - $1,000 plus ................. Development 542 $5/$1,000 of project value (construction cost) up to $5,000.00 a maximum fee of ....... ................................................................................................................................................................................................................................................................................................................................... (c) Minor PUD Plan Amendment $400.00 (a) $500 plus $5/$1,000 of project value 3500.0 $ 0 (construction cost) to a maximum fee of (b) Major amendment - $500 plus $5/$1,000 of ................. �(2) Site Plan Review 547 project value (construction cost) to a maximum fee $3,500.00 of ....... ................................................................................................................................................................................................................................................................................................................................... (c) Minor amendment $350.00 �(3) Variance 547 Residential $350.00 Bill No. 2020-12 .................................................................................. .......................................................... ..................................................................... Non Residential 1500*00 ,Variance Appeal Residential and Non Residential ................................................... ........................... 1350.00 (a) $500 + $5/$1,000 of project value (construction .............................................................................. $3,500.00 cost) up to a maximum fee of '(4) Conditional Use 547 (b) Major amendment - $500 + $5/$1,000 of project Permit $3,500.00 value (construction cost) up to a maximum fee of ....... .................................................................................................................................................................................................................................................................................................................................... (c) Minor amendment $350.00 ............................................................................................................................................................ $500 plus $100/year monitoring fee up to a ........................................... ........................... (5) Interim Use Permit 547 $1,000.00 maximum fee of ............................................................................................................................................................ �(6) *Zoning District or 547 $1,000.00 Code Text Change ........................................................................... ................................................................................ '(7) *Subdivision 500.01— $500.00 ,Approval 500.05 ............................................................................................................................................................ Subdivision Waiver 500.05- ................................................................................ $350.00 Subd. 2 (8) Street/Easement 820/State $500.00 Vacation Statute ............................................................................................................................................................ '(9) Appeal toBoard of 547 $350.00 Adj. & Appeals ............................................................................................................................................................ �(10) Special Request 350.00 ,to City Council ............................................................................................................................................................ �(11) Zoning ...................................................................... $59.99 ,Compliance Letter $65.00 ............................................................................................................................................................ '(12) Comprehensive $1,000.00 Plan Amend. �(13) Plats* 500 Preliminary Final Plat $775.00 Bill No. 2020-12 aWMIAUTAIMM yaa*� Section ;Type of Permit or License Description Fee Requiring Based on Building Permit fee schedule with a minimum of: Plan review fee: 65% of building (6) Fire Extinguishing System permit fee, except no fee for the $50.00 Permit following: (a) no charge for valuation of $1,000 or less Based on Building Permit fee schedule with a minimum of: Plan review fee: 65% of building (7) Fire Alarm Systems permit fee, except no fee for the $50.00 following: (a) No charge for valuation of $1,000 or less .............................................................................................................................................................................................................................................................................................................................................. Tanks (installation or modification) $150.00 (8) Flammable or Combustible Liquidor Gas Storage Tanks and q g Installation or alteration of piping $5 0.00 Each unit or dispenser Bill No. 2020-12 Underground Tank Removal $100.00/Tank MISCELLANEOUS FEES Bill No. 2020-12 10 AFFIDAVIT OF PUBLICATION STATE OF MTNNESOTA ) ,,COUNTY OF HENNEPIN Diane Erickson being duly sworn on an oath, states or affrrms that he/she is the Publisher's Designated Agent of the newspaper(s) known as: SC Bloomington Richfield with the known offrce of issue being located in the county of: HENNEPIN with additional circulation in the counties of: HENNEPIN and has full knowledge of the facts stated below: (A) The newspaper has complied with all of the requirements constituting qualifica- tion as a qualified newspaper as provided by Minn. Stat. $3314..02. (B) This Public Notice was printed and pub- lished in said newspaper(s) once each week, for I successive week(s); the first insertion being on 1010112020 and the last insertion being on 1010112020. MORTGAGE FORECLOSURE NOTICES Pursuant to Minnesota Stat. $580.033 relating to the publication of mortgage foreclosure notices: The newspaper complies with the conditions described in $580.033, subd. l, clause (l) or (2). If the newspaper's known ollice of issue is located in a county adjoining the county where the mortgaged premises or some part of the mortgaged premises described in the notice are located, a substantial portion of the newspaper's circulation is in the latter county. Designated Agent Subscribed and sworn to or aflirmed before me on 10/01/2020 by Diane Erickson. CITY OF RICHFIELD RESOLUTION NO.11769 RESOLUTION APPROVING SUMMARY PUBLICATION OFAN ORDINANCE AMENDING APPENDIX D TO THE RICHFIELD CITY CODE; ESTABLISHING A FEE SCHEDULE FOR CERTAIN PERMITS ANDAPPL!CATIONS WHEREAS, the City has adopt- ed the above referenced amend- ment of the Richlield City Cod6; and WHEREAS, the verbatim text of the amendmont is cumbersome, and the expense of publication of the complete te!.t is not iustified. NOW THEREFOBE, BE IT RE- SOLVED by the City Council of the City of Richfield that the following summary is hereby approved for official publication: SUMMARY PUBLICANON BILL NO.2020-12 APPENDX D TO THE RTCHFIELD CITY CODE; ESTABLISHING A FEE SCHEDULE FOR CERTAIN PERMITS AND APPLICATIONS This summary of the ordinance is published pursuant to Section 3.12 of the Richfield City Charter. This ordinance revises fees for certain land use services and ap- plications. The fee lor the prcpa- ration of a zoning verification letter has been raised from $50 to $65 and fees related to the processing of preliminary and final plat appli- cations have been combined and raised from a total of $750 to $775. New fees will be effective January 1,2021. Copies of the ordinance are available for public inspection in the City Clerk's office during nor- mal business hours or upon 'e-quest by calling the Department of Community Development at (612) 861 -9760. Adopted by the City Council of the City of Richfield, Minnesota this 22nd day of September, 2020. Maria Regan Gonzalez, Mayor ATTEST: Elizabeth Van Hoose City Clerk Published in the Sun Cunent October 1, 2020 1 079567 By: Notary Public Rate Information: (l) Lowest classified rate paid by commercial users for comparable space: $34.45 per column inch 31, 2024 MARIEEDARLEN P licb0Ntary M nn es0ta Cormtston Ad rD 1079567