09-22 Bill No. 2020-12BILL NO. 2020-12
TRANSITORY ORDINANCE NO. 19.15
AN ORDINANCE AMENDING APPENDIX D
TO THE RICHFIELD CITY CODE; ESTABLISHING A FEE SCHEDULE
FOR CERTAIN PERMITS AND APPLICATIONS
THE CITY OF RICHFIELD DOES ORDAIN:
Section 1. Background
1.01 Appendix D to the Richfield City Code consists of the schedule of fees adopted
by the City Council, including those adopted by resolution and those adopted by
Ordinance.
1.02 Minnesota Statutes, Section 462.353 requires that certain fees be adopted by
Ordinance. The City Council has previously established certain fees by
Transitory Ordinance No. 19.11. The City Council has established other fees by
resolution, which resolution is also part of Appendix D.
1.03 The City Council has determined the need to update the schedule of fees under
Transitory Ordinance No. 19.11.
Section 2. Fee Schedule Adopted
2.01 The fees set forth in the attached Exhibit A are hereby adopted by Ordinance.
2.02 The fees adopted at Section 2.01 of this Ordinance shall be amended only by
Ordinance. Any fees established by resolution, other than those adopted at
Section 2.01 of this Ordinance, may be amended from time to time by resolution
of the City Council.
Section 3. Effective date; codification.
3.01 This Ordinance is effective in accordance with Section 3.09 of the City Charter.
3.02 This Ordinance shall take effect January 1, 2021.
3.03 A copy of this Ordinance shall be included in Appendix D to the Richfield City
Code, immediately prior to the resolution establishing fees.
3.04 This Ordinance supersedes Transitory Ordinance No. 19.11.
Adopted by the City Council of the City of Richfield, Minnesota this 22nd day of
September 2020.
Maria Regan Gonzalez, Mayor
ATTEST:
Elizabeth VanHoose, City Clerk
Bill No. 2020-12
EXHIBIT A
CONSTRUCTION AND RELATED PERMIT FEES AND CHARGES
A. Investigation Fees: Work without a Permit:
Investigation. Whenever any work for which a permit is required by this code has been commenced
without first obtaining said permit, a special investigation shall be made before a permit may be
issued for such work.
Fee. An investigation fee, in addition to the permit fee, shall be collected whether or not a permit is
then or subsequently issued. The investigation fee shall be equal to the amount of the permit fee
required by this code. The minimum investigation fee shall be the same as the minimum fee set forth
in Section 2. The payment of such investigation fee shall not exempt any person from compliance
with all other provisions of this code nor from any penalty prescribed by law.
B. Permit fee refunds:
Bill No. 2020-12
....................................................................
.......... ........................................................................................................................................................................................................................................................................................
$1 to $500 (includes one inspection)
.......... ...........................................................................................................................................................
$40.00
.......... ........................................................................................................................................................................................................................................................................................
Each additional inspection
.......... ...........................................................................
$40.00
$26.25 for the first $500
plus $3.50 each
$501 to $2,000
additional $100, or
fraction thereof, to and
including $2,000 with a
minimum fee of $40.00.
$77.25 for the first
$2,000 plus $15.50 for
$2,001 to $25,000
each additional $1,000,
or fraction thereof, to
and including $25,000.
�(1) Building
400.03—
Permits
400.09
$436.50 for the first
$25,000 plus $11.25 for
$25,001 to $50,000
each additional $1,000,
or fraction thereof, to
and including $50,000.
$716.75 for the first
$50,000 plus $7.75 for
$50,001 to $100,000
each additional $1,000,
or fraction thereof, to
and including $100,000.
$1,106.25 for the first
$100,000 plus $6.25 for
$100,001 to $500,000
each additional $1,000,
or fraction thereof, to
and including $500,000.
.............................................................................................................................
$3,599.25 for the first
$500,000 plus $5.25 for
$500,001 to $1,000,000
each additional $1,000,
or fraction thereof, to
and including
$1,000,000.
Bill No. 2020-12
$6,242.50 for the first
$1,000,000 plus $4.25 for
1,000,001 and up
each additional $1,000,
or fraction thereof.
(2) Driveway,
Parking Area
515.05
(no permit fee for sidewalks)
$40.00
Permits
Permanent or portable pools are based on
..
(3) Swimming
420.00
$40.00
building permit fees with a minimum of
35% of building permit fee for one and two family dwelling basement
remodels
65% of building permit fee for all other building permits, except no fee
for the following:
(4) Plan Review
400.03—
Fee
400.09
(a) Existing single family dwelling minor nonstructural alterations.
(b) Single and two family dwelling repair and maintenance work.
(c) Commercial and industrial repair and maintenance work not
exceeding $1,000 or where plans are not required.
Plan review fee for
Maximum 25% of permit fee based on Minnesota State Building Code
similar buildings
1300.0160
(5) Contractors
Charged once each time a contractor applies
License
$5.00
for permit(s)
Verification Fee
(6) Moving-
..
845
Moving Permit Fee
$50.00
Buildings
(a) Commercial Demolition cost as per
$50.00
Building Permit Schedule with a minimum of
(7) Structure
400.00—
...,
Demolition
400.09
(b) Dwelling
$50.00
One or two story
$40.00
Residential - Garage and lesser structure
Bill No. 2020-12
Residential
Minimum Fee 2% of Total Job cost with a
$40.00
'(8) Plumbing
400.03—
minimum of (includes one inspection)
Permit
00.09
4
.......... ........................................................................................................................................................................................................................................................................................
Each additional inspection
.......... ..........................................................................................................................................................
$40.00
Commercial/industrial/Multi-family Based on
Total Job cost
'
$45.00
(9) Plumbing
400.03—
2% of Estimated Job cost with a minimum
Permit
400.09
of(includes one inspection)
Each additional inspection
$40.00
Residential
(a) Minimum Fee which includes one
$40.00
inspection
..................... ............................................................................................................................................................................................................................................................................
(b) Each additional Inspection
.......... ..........................................................................................................................................................
$40.00
(c) Complete Wiring Fee:
Single Family Dwelling and each dwelling unit
$165.00
of a two family dwelling and includes not
more than three inspections.
�(10) Electrical
400.03—
Permit
400.09
..................... ............
(d) New Service - up to 200 amps
$100.00
..................... ............................................................................................................................................................................................................................................................................
(e) Temporary Service - (for construction)
.......... .................................................................................
$45.00
..................... ............................................................................................................................................................................................................................................................................
(f) Sub Panel
.......... ......................................................................................................................................................
$55.00
(g) Installation, addition alteration, or
$8.00
repair of each circuit or feeder
..................... ............................................................................................................................................................................................................................................................................
(h) Swimming pool or exterior hot tub
.......... ..........................................................................................................................................................
$55.00
Commercial, Industrial and multiple
dwellings(more than two units) and
�(11) Electrical
$45.00
400.03—
Technology systems: Minimum Fee which
Permit
400.09
includes one inspection
�Commercial
...............
Each additional inspection
$40.00
Bill No. 2020-12
(a) Based on total job cost
- 2% of estimated job cost with a
minimum of $45.00
- Over $50,000 - Fee/ $1,000.00
plus 1% of cost over $50,000.00
(b) Traffic Signals: Per Intersection $185.00
(c) Fire Alarm: Based on %% of cost of
$45.00
electrical job to customer with a minimum of
(d) Carnivals, festivals and similar events
$110.00
plus $35.00 for each service on generator
(12) Electrical 400.03—
Based on 2% of cost of electrical job to
Permit Signs 400.09
customer with a minimum of (separate
electrical permit required for signs)
(13) Solar
Photovoltaic
System Rating*
0-5,000 watts
5,001-10,000 watts
10,001-20,000 watts
20,001-30,000 watts
30,001-40,000 watts
40,001 and over
Central Systems and Additions, Alterations
(14) Residential
and Repairs
Heating,
400.03— 1%% estimated cost with a minimum of
Ventilating, Air
400.09 (Includes one inspection)
Conditioning and
Refrigeration Each additional inspection
Commercial
Heating,
$45.00
$60.00
$40.00
$40.00
Central Systems and Additions, Alterations $45.00
and Repairsl%% estimated cost with a
Bill No. 2020-12 6
............................................................................................................................
Ventilating, Air
minimum of
'Conditioning and
Refrigeration
............................................................................................................................
(a) Temporary sign permit
(15) Sign
415.01—
(b) Permanent sign (any size)
$40.00
Installation
415.11
Building permit is required for sign support
$100.00
structures fees based on building permit fee
schedule
.............................................................................................................................
A temporary Certificate of Occupancy may be
.............
$200.00
�(16) Temporary
issued before completion of the entire work
Plus a letter of credit or
Certificate of
400
covered by the permit, provided the Chief
cash escrow equal to
�Occupancy
Building Official deems that the building is
125% of the remaining
safe to occupy
City Code requirements
ZONING, LAND USE AND RELATED CHARGES
�Type of Permit or
Section
Description
Fee
License
Requiring
(a) $1,000 plus $5/$1,000 of project value
$5,000.00
(construction cost) up to a maximum fee of
�(1) Planned Unit
(b) Major PUD Plan Amendment - $1,000 plus
.................
Development
542
$5/$1,000 of project value (construction cost) up to
$5,000.00
a maximum fee of
....... ...................................................................................................................................................................................................................................................................................................................................
(c) Minor PUD Plan Amendment
$400.00
(a) $500 plus $5/$1,000 of project value
3500.0
$ 0
(construction cost) to a maximum fee of
(b) Major amendment - $500 plus $5/$1,000 of
.................
�(2) Site Plan Review
547
project value (construction cost) to a maximum fee
$3,500.00
of
....... ...................................................................................................................................................................................................................................................................................................................................
(c) Minor amendment
$350.00
�(3) Variance
547
Residential
$350.00
Bill No. 2020-12
..................................................................................
..........................................................
..................................................................... Non Residential
1500*00
,Variance Appeal
Residential and Non Residential
................................................... ...........................
1350.00
(a) $500 + $5/$1,000 of project value (construction
..............................................................................
$3,500.00
cost) up to a maximum fee of
'(4) Conditional Use
547
(b) Major amendment - $500 + $5/$1,000 of project
Permit
$3,500.00
value (construction cost) up to a maximum fee of
....... ....................................................................................................................................................................................................................................................................................................................................
(c) Minor amendment
$350.00
............................................................................................................................................................
$500 plus $100/year monitoring fee up to a
........................................... ...........................
(5) Interim Use Permit
547
$1,000.00
maximum fee of
............................................................................................................................................................
�(6) *Zoning District or
547
$1,000.00
Code Text Change
........................................................................... ................................................................................
'(7) *Subdivision
500.01—
$500.00
,Approval
500.05
............................................................................................................................................................
Subdivision Waiver
500.05-
................................................................................
$350.00
Subd. 2
(8) Street/Easement
820/State
$500.00
Vacation
Statute
............................................................................................................................................................
'(9) Appeal toBoard of
547
$350.00
Adj. & Appeals
............................................................................................................................................................
�(10) Special Request
350.00
,to City Council
............................................................................................................................................................
�(11) Zoning
......................................................................
$59.99
,Compliance Letter
$65.00
............................................................................................................................................................
'(12) Comprehensive
$1,000.00
Plan Amend.
�(13) Plats*
500
Preliminary Final Plat
$775.00
Bill No. 2020-12
aWMIAUTAIMM yaa*�
Section
;Type of Permit or License
Description
Fee
Requiring
Based on Building Permit fee
schedule with a minimum of:
Plan review fee: 65% of building
(6) Fire Extinguishing System
permit fee, except no fee for the
$50.00
Permit
following:
(a) no charge for valuation of $1,000
or less
Based on Building Permit fee
schedule with a minimum of:
Plan review fee: 65% of building
(7) Fire Alarm Systems
permit fee, except no fee for the
$50.00
following:
(a) No charge for valuation of $1,000
or less
..............................................................................................................................................................................................................................................................................................................................................
Tanks (installation or modification)
$150.00
(8) Flammable or Combustible
Liquidor Gas Storage Tanks and
q g
Installation or alteration of piping
$5 0.00
Each unit or dispenser
Bill No. 2020-12
Underground Tank Removal $100.00/Tank
MISCELLANEOUS FEES
Bill No. 2020-12 10
AFFIDAVIT OF PUBLICATION
STATE OF MTNNESOTA ) ,,COUNTY OF HENNEPIN
Diane Erickson being duly sworn on an oath,
states or affrrms that he/she is the Publisher's
Designated Agent of the newspaper(s) known
as:
SC Bloomington Richfield
with the known offrce of issue being located
in the county of:
HENNEPIN
with additional circulation in the counties of:
HENNEPIN
and has full knowledge of the facts stated
below:
(A) The newspaper has complied with all of
the requirements constituting qualifica-
tion as a qualified newspaper as provided
by Minn. Stat. $3314..02.
(B) This Public Notice was printed and pub-
lished in said newspaper(s) once each
week, for I successive week(s); the first
insertion being on 1010112020 and the last
insertion being on 1010112020.
MORTGAGE FORECLOSURE NOTICES
Pursuant to Minnesota Stat. $580.033
relating to the publication of mortgage
foreclosure notices: The newspaper complies
with the conditions described in $580.033,
subd. l, clause (l) or (2). If the newspaper's
known ollice of issue is located in a county
adjoining the county where the mortgaged
premises or some part of the mortgaged
premises described in the notice are located,
a substantial portion of the newspaper's
circulation is in the latter county.
Designated Agent
Subscribed and sworn to or aflirmed before
me on 10/01/2020 by Diane Erickson.
CITY OF RICHFIELD
RESOLUTION NO.11769
RESOLUTION APPROVING
SUMMARY PUBLICATION
OFAN ORDINANCE
AMENDING APPENDIX D
TO THE RICHFIELD CITY
CODE; ESTABLISHING
A FEE SCHEDULE FOR
CERTAIN PERMITS
ANDAPPL!CATIONS
WHEREAS, the City has adopt-
ed the above referenced amend-
ment of the Richlield City Cod6;
and
WHEREAS, the verbatim text of
the amendmont is cumbersome,
and the expense of publication of
the complete te!.t is not iustified.
NOW THEREFOBE, BE IT RE-
SOLVED by the City Council of the
City of Richfield that the following
summary is hereby approved for
official publication:
SUMMARY PUBLICANON
BILL NO.2020-12
APPENDX D TO THE RTCHFIELD
CITY CODE; ESTABLISHING A
FEE SCHEDULE FOR CERTAIN
PERMITS AND APPLICATIONS
This summary of the ordinance
is published pursuant to Section
3.12 of the Richfield City Charter.
This ordinance revises fees for
certain land use services and ap-
plications. The fee lor the prcpa-
ration of a zoning verification letter
has been raised from $50 to $65
and fees related to the processing
of preliminary and final plat appli-
cations have been combined and
raised from a total of $750 to $775.
New fees will be effective January
1,2021.
Copies of the ordinance are
available for public inspection in
the City Clerk's office during nor-
mal business hours or upon 'e-quest by calling the Department of
Community Development at (612)
861 -9760.
Adopted by the City Council of
the City of Richfield, Minnesota this
22nd day of September, 2020.
Maria Regan Gonzalez, Mayor
ATTEST: Elizabeth Van Hoose
City Clerk
Published in the
Sun Cunent
October 1, 2020
1 079567
By:
Notary Public
Rate Information:
(l) Lowest classified rate paid by commercial users
for comparable space:
$34.45 per column inch
31, 2024
MARIEEDARLEN
P licb0Ntary
M nn es0ta
Cormtston
Ad rD 1079567