Subject: Storm Drainage Utility Capital Improvements
Council Members:
A study session has been scheduled for April 29, 1985 to
discuss the scheduling of the capital improvements included in
the Storm Drainage Utility. The staff is seeking approval of
the scheduling and public input process for the storm drainage
improvement projects.
City staff and engineers from Orr- Schelen- Mayeron &
Associates Inc.(OSM) will be at the study session to discuss
the following projects:
1. 66th /Xerxes. Update of project. Scheduled for 1986
construction.
2. 76th /Washburn. OSM to prepare final plans,
specifications and cost estimates for Fall of 1985 construction.
3. Wood Lake /69th Street conduits. OSM to prepare final
plans, specifications and cost estimates for Fall of 1985
construction.
4. Norby's Pond. OSM to prepare refined preliminary plans
and cost estimates for two alternative designs. One to enlarge
the pond and the other to install a new piped outlet to Legion
Lake. A schedule for neighborhood meetings will be defined when
the preliminary plans are presented to the city council. The
construction is scheduled for 1986.
5. Wilson Pond. OSM will prepare refined preliminary
plans and cost estimates for various alternatives. The plans
will investigate deepening and enlarging the pond. A process
for neighborhood meetings will be determined when the
preliminary plans are brought back to the council late this
year. The construction is scheduled for 1986.
-2-
The study sesion will include a visit to ponds in
neighboring communities which have side slopes similar to those
contemplated for Norby's and Wilson Ponds.
At the close of the study session, the staff recommends that
the council approve hiring OSM to prepare final
construction plans for the 76th /Washburn and Wood Lake conduit
projects and plans for Norby's and Wilson Ponds. The work
will be scheduled as outlined above.
Respectfully submitted,
Steven Devich
Acting City Manager
SD /eja
7k I- I
CITY OF RICHFIELD, MINNESOTA
Office of City Manager
Council Letter No. 162
Agenda April 29, 1985
The Honorable Mayor
and
Members of the City Council
City of Richfield
Subject: Request for Temporary Rooftop Balloon
Metro Sales, 1620 East 78th Street
Council Members:
Wiederkehr Balloons, 130 North St. Croix Trail, Lakeland,
MN, has applied for a permit to place a balloon on the roof of
Metro Sales, 1620 East 78th Street from the morning of May 2
until approximately 6:00 p.m. on May 3, 1985 to announce Metro
Sales' grand opening on those dates. The balloon (copies
attached) would be tied down to the roof, and measure
approximately 20 feet high by 9 1/2 feet wide. Operation of
the balloon would be supervised at all times it is stationed
on the roof.
City ordinance provides that oversize temporary advertising
signs of this nature must be approved by the city council.
The chief inspector and the city planner recommend denial of
this permit as the balloon is oversized and may start a
precedent for advertising signs of this nature. Although city
staff recommends denial of this permit based upon city
ordinances, the city manager recommends that the city council
evaluate this permit request giving consideration to the short
duration of this temporary sign and the potential benefit to a
new business in the community.
This item has been placed on the April 29, 1985, special
city council meeting agenda for council consideration and
action.
Re§lp�--¢tfully
Steven Devic
Acting City
JGC /eja
s bmitted ,
I
h I
Manager
lie
_r,
'7?,aise the
W thYourNe)d
Raven l +r Aids '
raise the roof...
raise people's
attention... raise
sales!
Raven's cold air
inflated 61W
cads; "' effective
promotional tools
both day and night are
as durable as they are
dynamic!
f W y '9
As Different And
Unique As Night And Day.. .
XoofAd TM
AVW /
CITY OF RICHFIELD, MINNESOTA
Office of City Manager
Council Letter No. 163
Agenda April 29, 1985
The Honorable Mayor,
and
Members of the City Council
City of Richfield
Subject: Storm Drainage Utility Capital Improvements
Council Members:
A study session has been scheduled for April 29, 1985 to
discuss the scheduling of the capital improvements included in
the Storm Drainage Utility. The staff is seeking approval of
the scheduling and public input process for the storm drainage
improvement projects.
City staff and engineers from Orr- Schelen- Mayeron &
Associates Inc.(OSM) will be at the study session to discuss
the following projects:
1. 66th /Xerxes. Update of project. Scheduled for 1986
construction.
2. 76th /Washburn. OSM to prepare final plans,
specifications and cost estimates for Fall of 1985 construction.
3. Wood Lake /69th Street conduits. OSM to prepare final
plans, specifications and cost estimates for Fall of 1985
construction.
4. Norby's Pond. OSM to prepare refined preliminary plans
and cost estimates for two alternative designs. One to enlarge
the pond and the other to install a new piped outlet to Legion
Lake. A schedule for neighborhood meetings will be defined when
the preliminary plans are presented to the city council. The
construction is scheduled for 1986.
5. Wilson Pond. OSM will prepare refined preliminary
plans and cost estimates for various alternatives. The plans
will investigate deepening and enlarging the pond. A process
for neighborhood meetings will be determined when the
preliminary plans are brought back to the council late this
year. The construction is scheduled for 1986.
-2-
Q Ow
The study sesion will include a visit to ponds in
neighboring communities which have side slopes similar to those
contemplated for Norby's and Wilson Ponds.
At the close of the study session, the staff recommends that
the council approve hiring OSM to prepare final
construction plans for the 76th /Washburn and Wood Lake conduit
projects and plans for Norby's and Wilson Ponds. The work
will be scheduled as outlined above.