10-20-86 agenda~ ~~~ .~ r . HOUSING AND REDEVELOPMENT AUTHORITY HRA LETTER N0. 33 October 20, 1986 ISSUE STATEMENT: Report on the Proposed Development Concepts for the Graham Avenue Development Site Area in the LHN. BACKGROUND• At the HRA meeting of September 29th, 1986, two development concepts were presented for the Graham Avenue Development area site. Walker Methodist presented'a concept for the construction of apartments with space for the VFW and Trestman Music and Big Wheel properties would expand their present building and renovate. Tushie-Derrick presented a mixed use concept which included housing, retail and office space. Mr. Shaller also indicated that the Shaller-Trestman concept. of renovation and expansion of their buildings presented in the Spring was still viable. Since the presentations in September, staff has identified the criteria against which proposal would be evaluated. Staff also met with Tushie-Derrick and Walker to gather more information and better understand their concepts. From previous discussions information was available on the Shaller-Trestman proposal. Attached to this letter is a listing of items to be evaluated for each proposal. ,The information available to date for each proposal is provided. If there are few or no remarks with some criteria that is because the information is not yet available. RECOMMENDATION; It is recommended that the HRA review the criteria on which each proposal is to be evaluated and determine if there are additional items which should be included. Secondly, each project should be reviewed and the relevant information recorded. If some aspects of a proposal are. of concern, please indicate those concerns to- staff. Finally, while there are a number of items to be evaluated, both the Walker and Tushie proposals have two areas which should be studied immediately, traffic and marketability. The results of an analysis of these two items could have significant influence on the selection of a proposal. Thus, it is proposed that for the November meeting, staf_f_will provide a preliminary analysis of traffic impacts from each development. The specialist would utilize information readily available and would not undertake another study from the beginning. Regarding marketability, we will retain the services of a marketing. specialist to review the Walker market study of last spring, evaluate the current conditions in the market place and report on the marketability of 150 to 250 units of rental housing for the elderly. Regarding the Tushie proposal, written evidence of tenant interest would be requested for review by staff. ~~ 1 BASIS OF RECOMMENDATION: 1. The marketability of rental housing units for the elderly should be closely evaluated because it is essential to the success of such a project. While Walker has recently indicated that they feel their market. study of last Spring is still valid staff is aware that some marketing people are of the opinion that the. elderly market for both rental and sales is almost saturated. An independent analysis of existing information would be valuable to the HRA in evaluating the Walker proposal. 2. With the Tushie proposal marketability is important also but the mixed use nature of the development and conversations with the developer seem to indicate there is a ready market. However, the intensity of this development and the. related traffic and ability of the adjoining streets to handle the traffic should be of primary concern. ALTERNATIVE RECOMMENDATION: Select a developer based on the information now available. DECISION MODE- Proceeding as indicated may make it possible to select a developer by December or January. Respectfully submitted, Jam D. Prosser Ex utive Director PROPOSAL:. TUSHIE-DERRICK (LYNDALE PARTNERS). 1. Development team: -identify members -experience-with similar projects -financial capability to be determined Developer: Lyndale Partners (Tushie/Derrick/Shaller/Trestman Architect: Tushie Montgomery and Associates Contractor: Bossardt/Christianson New partnership, members of the partnership have mixed use development experience in cooperation with local government. 2. Brief description of overall project and comments regarding building height, location, shadows, etc. Copy of preliminary elevation drawings are attached (A rear building elevation will be prepared as the review process continues) for "Landmark Center" a stepped 5 story mixed use development with five district uses: Office (63,200 square feet), VFW (44,600 square feet), residential (37,400 square feet), retail (34,300 square feet) and medical (18,700 square feet). Also included is 159,600 square feet of covered parking and 10,100 square feet of mechanical space. Total land area needed for the project approximates 4.8 acres with the building set back from Lyndale Avenue and Lake Shore Drive to accommodate parking to the front. There are 278 surface parking stalls and 500 parking stalls within a privately owned ramp. The first level, primarily- retail and medical uses, covers 60,000 square feet of floor area and is reduced to 16,400 square feet in the fifth level. A "shadow" analysis and the building height relationship to adjacent buildings would have to be studied further. All present use would be relocated: VFW, Cricket Photo, Big Wheel, Trestman, Lynch, Davis, LSD "common lot". - - 3. Site lines; on site, off site It has been represented by the developer that the mature tree line closely approximates the fourth level of the building. However, it is not clear how many existing trees would remain. Since the development would be built directly adjacent to the Lake Shore Drive (LSD) Condominium development, the screening, berming and planting that occurs to the north side of-the new building would be on LSD property for LSD to maintain. The rear delivery driveway and receiving area would be screened with a canopy. An intended use restriction would prevent large semi truck trailers from -~~- `~,/ servicing. Eighteen feet of green space is provided along Lyndale with the new Cricket Photo located within a corner plaza. The entire first floor of the building is accessible from the Lyndale Avenue elevation even though the grade changes significantly along Lake Shore Drive. Underground ramp parking will fill in where the grade changes. 4. Density; lot coverage, massing, number of housing units and parking spaces, square footage of uses, open space The building covers 60,000 square feet, approximately 28 percent of the total land area.- The number of levels gives it a "mid-rise" configuration in comparison to high rise development on adjacent areas. The stepped floor arrangement 60,000 square feet on first, 49,000 square feet on second, 44,600 square feet on the third, 38,300 square feet on the fourth, 16,400 square feet on the fifth, reduces the building mass to land coverage ratio. Forth eight (48) units of lower cost rental housing are proposed: 46-1 bedroom, 1-studio, 1-2 bedroom (for managers). There would be designated stalls for the residential use. Other .uses would share the parking referred to in Item ~~2 above. Amount of open space will have to be determined. 5. .Identification of development site boundary: -ability to secure site control -consensus of opinion by affected owners -resolution of site restrictions The Lyndale Partners have secured a purchase agreement from homeowners Lynch and Davis. Although Shaller, Trestman, and VFW have all made individual plans for there own buildings, they also appear receptive to being included in the new development. In a land trade with the developer, the owner of Cricket Photo would receive a new building designed for the corner. It appears that LSD is not going to support the Landmark Center development and they own a key parcel in the development area. There are restrictive covenants on the LSD parcel and other dedicated easements exist in the development area that will require further analysis. 6. Traffic Analysis: -offstreet parking, internal and external circulation (loading, access to various uses) -capacity of adjacent streets -conflicts with existing public street improvements A traffic study has to be done. The developers believe that there will not be that much additional retail space from what already exists in the area. Thus from the developers ~~ ~~~ ~ 0 ' perspective, retail traffic would not increase, and the VFW, Shaller, Trestman uses would be better managed. To accommodate the development, street and. intersection improvements are probably required. Tushie/Derrick would proceed with a traffic study if there is clear support for the project. 7. Compatibility: -adjacent uses (LSD, Lyndale Hardware, Shaller-Trestman, Cricket Photo, VFW) -redevelopment district -buffering -The proposed development has accommodated the retail uses into a strip retail center. Further discussion with owners and the relationship to LSD and Lyndale Hardware would have to be studied -Much of the development is outside the LHN redevelopment district. A new tax increment district is requested by the developer. Developers position: -Cricket Photo remains a separate building for photo studio and processing work. -VFW will be concerned if additional restaurants utilize the retail space. -LSD will have to be satisfied with the buffering and driveway uses. -Waste disposal to be handled internally -Cooking odors at the VFW should be considered in developing final plans. 8. Marketability of use, need, lease up Approximately 53 percent of the project is committed. Primary tenant would be VFW -$44,600 square feet leased or owned Retail Space .(34,300 square feet) -6,000 square feet for Shaller intended -2,000 square feet for Trestman intended leaves a 26,400 square feet balance to lease ~~- Medical (18,700 square feet) -An out of state medical group- doctor and dental clinic is considering a letter of intent to lease all medical space during October, 1986. Office (63,200 square feet) -7,600 square feet for VFW intended -6,500 square feet for Tushie Montgomery intended the 50,000 square feet balance has not been "pushed" yet. The rental housing would meet Section 8/Section 202 design requirements and be very :affordable if the proposed rents of $360/month can be achieved. There is a need for this type of opportunity. 9. Summary. of estimated project costs: -net construction -architectural -parking -site -financing -profit Building Construction $10,613,000 Leasehold Improvements $ 2,008,400 Site Costs 890,000 Land $ 2,000,000 Financing Costs $ 2,589,116 Marketing $ 389,225 Contingency $ 1,059,462 Total 21,006,203 Requested City Assistance ($2,.031,886) Net Development Costs $18,974,317 (utilities, demolition, grading, soil prep, surface parking, landscape) City/HRA subsidy could take several forms: land writedown, public improvements, tax increment interest reduction. 10. Timing/phasing of project; A 15 month construction period is anticipated. Starting in Spring,. 1987 after frost is out and soil can be worked freely. The VFW, Shaller, Trestman, Cricket Photo uses would remain while the ramp parking and building foundation was initiated. ~~% 11. City and HRA role: -formation of tax increment district project boundary -zoning considerations -financial assistance -acquisition/clearance -displacement -public improvements A new district would have to be established for those portions of the development area outside the existing LHN redevelopment district. A $2,031,886 subsidy is being requested, which could take the form of land writedown, installation of public improvements, and tax increment interest reduction. Thus the HRA would be involved in site assembly. In return, 48 units of rental housing for lower income elderly is planned. No Industrial Revenue Development Bonds would be required for the development. Housing Revenue bonds for the. rental portion are to be considered. The en-tire development would be privately owned.. 12. Consistency with city zoning ordinance requirements To be determined. A Planned Unit Development (PUD) is likely that will encompass the entire site. 13. Revenue to be realized from development including land -- proceeds Tax increment. Proceeds from sale of land are not anticipated. The amount of tax increment and the bond payback period would have to be determined. For the. term of the payback period, the rental housing would remain affordable to lower income elderly. The Developers "Return on Investment" initial projections have been provided and will require further analysis as the entire financial package is evaluated. 14. Environmental review process-EAW required To be determined. 15. Demand on existing public services, public improvements To be determined. 6 16. Housing element feasibility: -management -target market (low income target?) -rents -arrangement of common spaces in mixed use concept -separation from commercial uses -amenities, services, support for residents -unit size and type Developing the housing portion according to NUD's Section 202/Section requirements, will produce the lowest practical. cost. Rents at $360/month are projected which may allow elderly with rent certificates to occupy the building. Although some parking would be shared, the housing use would be separate. The units would approximately 550 square feet, have no support services except those available in the community, and receive management from the same entity responsible for the project. The affordable housing option would remain that way for the .life of the tax increment project that is developed to encompass the housing portion of the development. 17. Employment Opportunities To be determined. 18. Public reaction ~~ j To be determined. ~.~ - - _:-_ ~ pegs ~ - s a° ~,: ~ ~ ' ~ ~ . LANDMARK CENTER e ~_ ~ ~OFt LYNDA!_E PARTNERS Richfield fvilmesota ~ ~ ~~r ~ ~'~ , '`p~ ` y~ t ~ r ~ ~~ iF tp ~. / 4 . ~ ' ~` ~ ~ ...,f C ~ d j ~ ` ~ . / r j 1 i ~ ~ ~ . ' ~ ~ f ~ ~ S R / rJ ti ~ ~ ~ A '~ ~ r , `.~ ,r ~ ; t s. ,p # ~ ~ ~i _ 3 r . ~ ~~ ~ ' O n` ~~ , ~~ a D r n 0 O O 9 `;, m Z ,~ ~ - ~ ; ,~, , : LANDMARK CENTER FOFt LYNDALE PARTNERS ~ ~ Richfield. Minnesota `\` ~ ~ ~ ( ~ _ `1 / ~~ 1 r \ r '~ /~ i~ ,J _.1 y _S 4 ~ ,~ 0 0 0 ;~ 'l v ,` ~•~. l~ ~,, -~~~ ~. ... o ~~ f~J ~ `\~I / ~ ~ r,~i r ~ rr ~r r/ r r i r i i r r i I / ~ / / ~ r r i r r r ~ r i i r ~ i / ~ r r i ~ r ! J ; ~ ~` ~ ` ~ ~ ~~ \ ~, ~__,_, ~j~__,, i ' ;, i ,' \\`' ,.,~ , .. \ . _ ~ ~ ma `, ~ ` y 7 ~ ~ T f nom, ~ r m 'r 0 r r-! r x 'z_ ~ / / r r r / ~ ~ r ~ r ~ i i ~ r r r / r r r / r ~ r r r i c m i / / / m ~ ~ r ~ ~ r r r / ! r r r r r ~r i ~ l r r r r r r r r r r l ~ ( t 1 ( ~ j `~~ ~ ~ ~ \ ~ r ~ ~ ~ ~ ~ \ ~ ~ ~ _ r r J ~ ~-- ;~ ' ~ ` ~2_ ,f, '`` ', ?~i ~ ~ ~ ~ t ~ ~ i ~ 1• ~~. i ,.L' ~r l t # ~i - • ~ _ . LANDMARK CENTER FOR:LYNDALE PARTNERS Richfield Mimesota // ' L / OL / C//' ~ ~~ ;". _ f~ ~ ~/ ~ r n a z c a ~ m ~ 0 w (7 m z m f ---~ i ~ i. 1 ti PROPOSAL: TRESTMAN-SHAILER 1. Development team: -.identify members -experience with similar projects -financial capability Richard Shaller, property owner and owner of Big Wheel Jerry Trestman, property owner and owner of Trestman Music Bruce W. Schmitt & Associates, architect First Grand Avenue or Richfield Bank & Trust, lenders Mr. Shaller has been involved in several renovation and new .construction projects to house Big Wheel Stores 2. Brief description of overall project. Comment on building height, location, and shadows The proposal envisions the renovation of the two existing structures both of which include partial second floors. Between the two structures, a new one story commercial building would be constructed. The HRA owned property would be purchased and utilized for parking. Shadows would fall to the north and east on non-residential property. 3. Site lines; on site, off site The existing buildings would be retained and the new structure on the vacated Graham Avenue would not negatively impact site lines. 4. Density; lot coverage, massing, number of housing units and parking spaces, square footage of uses, open space Approximately 30~ of the site area would be covered with buildings. The balance would be parking and landscaping. 5. Identification of development site boundary: -ability to secure site control -consensus of opinion by affected owners -resolution of site restrictions The site includes the two parcels owned by the developers, three parcels owned by the HRA, and a public right-of-way which would be vacated (Graham Avenue). All of the property is within the existing LHN project. The two single family homes on lake Shore Drive would remain as would the VFW and Cricket Photo. f7~"_/~ 6. Traffic Analysis: -offstreet parking, internal and external circulation (loading, access to various uses) -capacity of adjacent streets -conflicts with existing public street improvements The development is proposed to have approximately 147 off- street parking spaces. Ingress. and egress would be from Circle Place and Auto Lane. Loading would be from the rear of the development. 7. .Compatibility: -adjacent uses (LSD, Lyndale Hardware, Shaller-Trestman, Cricket Photo, VFW) -redevelopment district -buffering The development would. maintain the existing low rise commercial character of this quadrant of the 66th Street and Lyndale Avenue intersection. Because of distance and low rise character, the conflict with Lake Shore Drive condominium should be minimal. It may be possible to work out a joint parking arrangement so the VFW could utilize the Trestman-Shaller parking. 8. Marketability of use, need, lease up The existing buildings are occupied. Approximately 7,500 square feet of new commercial/retail space would come on the market. 9. Summary of estimated project costs: -net construction -architectural -parking -site -financing -profit Total construction cost New Construction Remodeling Parking Lot Imp. Landscaping $385,000 125,000 120,000 35,000 Total Est. Cost $665,000 -/~ 10. Timing/phasing of project; prom plan preparation, bidding. and through project construction approximately 6 to 7 months-would pass. 11. City and HRA role: -formation of tax increment .district project boundary -financial assistance -acquisition/clearance -displacement -public improvements This project could be undertaken within the existing LHN project. The LHN Land Use Plan identifies this area for commercial use. General Commercial is the existing zoning designation. The HRA has expended approximately $250,000 to date to purchase and manage the three vacant parcels. Additional acquisition of property would not be necessary. However, an expenditure of $50,000 to $75,000 for utility relocation would be necessary.. Additional public assistance apparently would not be necessary. 12. Consistency with city zoning ordinance requirements The proposal is consistant with the zoning ordinance except in the area of parking where a variance may be required. 13. Revenue to be realized from development including land proceeds and Tax increment. For commercial purposes, the three HRA owned parcels are valued at approximately $100,000. This project could result in a tax increment of approximatly $30,000 annually. If construction was initiated in 1987, the increased revenue would be generated in 1989. This revenue would be deposited in the debt service fund and be used to pay off outstanding. bonds. Without issuing more bonds. the project could pay for itself in ten to fifteen years. 14. Environmental review process-EAhI required The project is too small to warrant an environmental review. ~.~ -- ~.~ 15. Demand on existing public services, public improvements The demand on community services would not change much. However, it is likely that the existing structures and new structures would be sprinkled for fire supression. This would lessen the need for public services. 16. Housing element feasibility: Not applicable as there is no housing element. 17. Employment Opportunities Not yet determined. 18. Public reaction The Lake Shore Drive Condominium Association Board of Directors adopted a motion in support of this development on October 7, 1986. ~~ i~ PROPOSAL: WALKER METHODIST 1. Development team: -identify members -experience with similar projects -financial capability Walker Methodist would be the developer and manager. 2. Brief description of overall project. Comments on building height, location, shadows. The proposal envisions up to 250 units of elderly rental housing. The Trestman and Shaller proposal has been incorporated into the plan. The VFW would expand and renovate .their existing structures. Cricket Photo would occupy a portion of the Shaller property. A two level parking structure would be located adjacent to the Trestman, Shaller and VFW property. 3. Site lines; on site, off site The apartment tenant building would be in the line of site of some Lake Shore Drive Condominium units. Impact from other locations is yet to be determined. 4. Density; lot coverage, massing, number of housing units and parking spaces, square footage of uses, open space Of the 250 units, 45 maybe in a Section 202/8 portion of the building if HUD solicits proposals next year and if an application was submitted by Walker and selected on a competitive basis. The "L" shaped building would be stepped. The longest "leg" would be north-south. The lowest portion of the. structure would be closest to Lake Shore Drive (street). -Its highest point would be 12 stories, a second component would be 9 stories and the lowest portion 7 stories. Parking within the rental building would include 130 spaces. On the exterior would be 10 spaces. A two level parking structure located behind the apartments and the Lyndale commercial space would provide 210 spaces for the VFW and retail stores. The VFW would have an additional 51 exterior spaces and 32 spaces would be exterior to the Trestman and Shaller property. The total spaces would approximate 433. -~~ i~ 5. Identification of development site boundary: -ability to secure site control -consensus of opinion by affected owners -resolution of site restrictions The development would require the three parcels along Lake Shore Drive, portions of the Trestman and Shaller and VFW property and the three HRA owned lots. Meetings between the developer and some of the affected property owners are now underway. Portions of the site are outside the existing LHN. 6. Traffic Analysis: -offstreet parking, internal and external circulation (loading, access to various uses) -capacity of adjacent streets -conflicts with existing public street improvements There would be approximately 433 parking spaces on the site. Access would be from Lake Shore Drive and Lyndale Avenue. 7. Compatibility: -adjacent uses (LSD, Lyndale Hardware, Shaller.-Trestman, Cricket Photo, VFW) -redevelopment district -buffering The existing commercial character in this quadrant of the 66th Street and Lyndale intersection would be continued. The height and proximity to Lake Shore Drive condominiums may infringe on the view of some Lake Shore units owners. 8. Marketability of use, need, lease up The developer completed a market study last Spring which indicated a market for such a project. It would probably take 18 to 24 months to rent all the units following construction. 9. Summary of estimated project costs: -net construction -architectural -parking -site -financing -profit The housing component by. Walker may be valued up to $14 million. ~~-/, 10. Timing/phasing of project; Site assembly may take 6 to 9 months, with a 15 to 18 month construction period. 11. City and HRA role: -formation of tax increment district project boundary -financial assistance -acquisition/clearance -displacement -public improvements This project would necessitate the creation of a new TIF district as a portion of the site is outside the LHN. The developer would look to the HRA to assemble the site for the apartments. Housing Revenue Bonds would be sought to finance the rental units. The city would construct and own the parking structure.. 12. Consistency with city zoning ordinance requirements The entire development site including the commercial frontage would likely be included in a PUD. 13. Revenue to be realized from development including land proceeds Tax increment. The maximum revenue .per unit for the apartment site would be $2,500 although it may need to be reduced to keep rents low. 14. Environmental review process-EAN required To be determined. 15. Demand on existing community services, public improvements - To be determined. ~~-~~ 16. Housing element feasibility: -management -target market (low income target?) -rents -arrangement of common spaces in mixed. use concept -separation from commercial uses -amenities, services, support for residents -unit size and type Walker Management would operate the facility. The rents would be mixed and are not yet determined. Services would include security, transportation and food. 17. Employment Opportunities Not yet determined. 18. Public reaction The Lake Shore Drive Condominium Association Board of Directors adopted a motion which found this development to be unacceptable. There is also concern about the concentration of elderly in this location. . ` - -.~ ~. \\ ~\ v \_ ~ ~ ('~ ~~~ i \ ~ ~~ ~~ ~~; \ - r. ~-~ J ~ C y~ \ J~ ti ~ \ S'a'm . ~ V n. ~: g -- ---- - - 3 ~ 2 =i \ ~~ `~~ ~ ~ ~ l- .~ ~~ . ~~ ~ ~~ ~ ~ ~~ ' ``~~ ~, ~ `~ ~~ ~~ '/~ ~. y \ o r ~ ~ ~"~. ~\ ~~ ~~ ? ~ ,\ (`_. ~~ ~ ~ , 'r" \ [~ ~~ e ~ ~X• ~ 1 ~ ',Y ~ D ~ ;. °~ ~ ~~ U ~. ~: \ ~. ~. `_i { ~ _/ ~ ` ~ / V ~:;/ ~~-~ Z~ O" H ~_ O a ~ U ~ ~ - =_ Z -_ . _ - ~ - T~ w =r~ T ~~ =~ ~\ ~ ~ ~ \ 1 ~ ~ ~ ~ ,~ f `. ~ / ~ ~~ ~~ ~ ~~~ v'i~ ~~ ~; ~ `/ ~_ , ~' .,, ~' _` _ .. ~~ r ~` \ ~ ~ ~-.*'~ ~~ y7b~ 7 .~ ,~ ~~, j ~ , ~/ ` '3"~~' ~~ /~ ~',~ ~~~ ~ _ ,ice ~ ti~~ = `~1~; . \~,/ ~ t ~~. _ ~o .~ ~ ; ~ ~ ~~~: ~~~ DVS,- _ . yi ... ~Y ~ ~ ~ / ,-. ~ ~ _ _ \ ~~, -fir'°?," ~~ ~ . ~y ,~ ~.~{ N Z ~' ~ ~~ ~ ' ~ '• i ~' . (\/ ~ eat- W _~ ~ ~ ~ ~ J i. i V ~ \ \ \ 5 VJ ws / c .4 N ~`.~ ~ y ~ ~i Y~" 2 S H qi '~NA'~' c T ~ c1~ ~~;~ ~` ~ ' ~ ~ ~ ~ ~ cm .\ ~~ ~! ~~ eo `~~ g ~ a~ a~ ~, ~ ~ ~ ._ _ . N ~~~ a ~ ~~ ~h :.4' C -~ ~, ?~ ~J "; ~~A~~ ~4~ ;` r ,~ ~~ ~ ~j '= „.~. ., <" ~_ •~ ~~~ `~ /` ~' l '; ~ ~~ ~~~r < <'i ~ fi~ ~~ ~- ~_ .3 ~.~:- ~;-- ~. ~r~ ~ ~~ 0 ~ `~~ o~ ~ ~~ c~ ?~ Y M C1 {~ Q a w -_ W Vr ~ J W ?i ^ a €~_-~ J .~. < I ,~~ '~ y" <- ,~ jl ~ ~~~ /~ ,¢ ~~ ~F ~ 7 p y './ ,/, , j, `~ ,~ i ~~~ ~ % ~. ~ ,~ :~' ,,, ~ / ~ ~ , ~, ~~/ HOUSING AND REDEVELOPMENT AUTHORITY HRA Letter No. 32 October 20, 1986 ISSUE STATEMENT: Authorization to Issue Certificates of Completion for Townhouse Units at 66th Street and Rae Drive Developed by George E. Branton Construction Company. BACKGROUND: In September, 1986 the HRA approved the final plat for a portion of the site together with related amendments to-the Homeowners Association agreements. Buyers for six of the eight units constructed by George E. Branton Construction Company have now been qualified (two three bedroom units are .still on the market). The closing on the sale of the units is likely to take place in the next few weeks prior to the November HRA meeting. For a closing to take place, the HRA must authorize a Certificate of Completion. Ordinarily one Certificate of Completion is issued when an entire development is completed. However, because this development has four separate buildings and eight units, certificates must be issued for each unit as they are finished. A certificate would also be issued when the site improvements are complete. In anticipation of this situation, legal counsel prepared a "Certificate of Completion- Partial" for each-unit as they are completed. A "Certificate of Completion-Final" would be provided to the developer when everything is complete including the site work. The development is nearing completion. Interior finishing of the units is now underway. Driveway ,installation should also be completed soon. RECOMMENDATION: It is recommended that the HRA adopt the attached resolution which authorizes the Chairperson and Executive Director to execute the Certificate of Completion-Partial, as it relates to the finishing and sale of the individual dwelling units, and the Certificate of Completion-Final, provided all requirements of the development agreement have been satisfied. The Chairperson and Executive Director would also be authorized to execute second mortgage documents and other documents that may be required for closings to occur. BASIS FOR RECOMMENDATION: 1. As of this writing, except for the identification of purchasers for two units, the developer has substantially complied with the development agreement in the construction of the units and provided eight new townhomes for moderate income family ownership. ~/-/ 2. With construction completion, staff would release Certificates of Completion-Partial for individual units and a Final Certificate for the entire development given the following conditions: -Development Agreement requirements met -The City's Building Official issues a Certificate of Occupancy for the unit being sold -The neighbors retaining wall (Burkhardt-921 Rae Drive) which was pushed out of alignment during earth moving work by the developer, is reset by the developer -The neighbor's 1" to 1-1/2" caliper tree (Howard - 915 Rae Drive) which was located near the property line and inadvertently cut down during the installation of a fence, is replaced by the developer. 3. The HRA is required by the a Certificate of Completion .satisfactorily completed. development agreement to provide provided that work is ALTERNATIVE RECOMMENDATION: A refusal to issue the Certificate of Completion-Partial/Final would have to be based on non-compliance with the development agreement. At this time, there does not appear to be a basis for this finding given the conditions outlined i°n this letter. DECISION MODE• The lender, Rothschild Financial Corporation, has indicated that six of Mr. Branton's eight units have qualified buyers and that closings could occur "anytime". Four closings have been scheduled for October 31, 1986, provided the finishing details for individual units are completed. The site work, weather permitting, should be completed soon. Delaying HRA action to authorize the release of Certificates until all work has been completed (i.e., the regularly scheduled November or December, 1986 HRA meetings) may place identified buyers and Mr. Branton in an untenable position in terms of financing. Res ully submitted,, Jam D. Prosser Executive Director ~: i ~ ~ / ~~ r x HRA RESOLUTION N0. RESOLUTION AUTHORIZING THE ISSUANCE OF CERTIFICATES OF COMPLETION FOR 66TH STREET/RAE DRIVE HOUSING WHEREAS, the Housing and Redevelopment Authority (HRA) in and for the City of Richfield has considered the status of the 66th Street/Rae Drive Housing Development; and WHEREAS, it has-been determined that the developer has substantially complied with the development agreement in the construction of the eight townhouse units; and WHEREAS, all eight units are near completion; and WHEREAS, qualified buyers have been identified for six of the eight units and the lender has scheduled closings; and WHEREAS, marketing efforts should soon identify the remaining buyers; and WHEREAS, the HRA is required by the development agreement to provide Certificates of Completion and other supporting documents in advance of total project completion, to facilitate the sale of individual units and the timely completion of the entire project; and WHEREAS, the Certificates of Completion would be released given the following conditions: -Requirements of~the Development Agreement are met; -A Certificate of Occupancy is provided by the City Building Official; -The retaining wall at 921 Rae Drive is repaired; -A properly sized and located tree is provided at 915 Rae Drive NOW, THEREFORE, BE IT RESOLVED, by the Housing and Redevelopment Authority in and for the City of Richfield, Minnesota: That the Chairperson and Executive Director are authorized to execute the Certificate of Completion-Partial and Certificate of Completion-Final and other supporting documents to facilitate the closing of individual units. Passed by the Housing and Redevelopment Authority in and for the City of Richfield this 20th day of October, 1986. Thomas E. Harms, Chairperson ATTEST: Joan Helmberger, Secretary