Loading...
2016-22 BILL NO. 2016-22 TRANSITORY ORDINANCE NO. 19.03 AN ORDINANCE AMENDING APPENDIX D TO THE RICHFIELD CITY CODE; ESTABLISHING A FEE SCHEDULE FOR CERTAIN PERMITS AND APPLICATIONS THE CITY OF RICHFIELD DOES ORDAIN: Section 1. Background 1.01 Appendix D to the Richfield City Code consists of the schedule of fees adopted by the City Council, including those adopted by resolution and those adopted by Ordinance. 1.02 Minnesota Statutes, Section 462.353 requires that certain fees be adopted by Ordinance. The City Council has previously established certain fees by Transitory Ordinance No. 18.86. The City Council has established other fees by resolution, which resolution is also part of Appendix D. 1.03 The City Council has determined the need to update the schedule of fees under Transitory Ordinance No. 18.86. Section 2. Fee Schedule Adopted 2.01 The fees set forth in the attached Exhibit A are hereby adopted by Ordinance. 2.02 The fees adopted at Section 2.01 of this Ordinance shall be amended only by Ordinance. Any fees established by resolution, other than those adopted at Section 2.01 of this Ordinance, may be amended from time to time by resolution of the City Council. Section 3. Effective date; codification. 3.01 This Ordinance is effective in accordance with Section 3.09 of the City Charter. 3.02 A copy of this Ordinance shall be included in Appendix D to the Richfield City Code, immediately prior to the resolution establishing fees. 3.03 This Ordinance supersedes Transitory Ordinance No. 18.86. Adopted by the City Council of the City of Richfield, Minnesota this 13th day of December, 2016. zir! 'Debbie Goettel, ayor ATTEST: -1 Elizabeth Van Hoose, City Clerk EXHIBIT A CONSTRUCTION AND RELATED PERMIT FEES AND CHARGES A. Investigation Fees: Work without a Permit: Investigation. Whenever any work for which a permit is required by this code has been commenced without first obtaining said permit, a special investigation shall be made before a permit may be issued for such work. Fee. An investigation fee, in addition to the permit fee, shall be collected whether or not a permit is then or subsequently issued. The investigation fee shall be equal to the amount of the permit fee required by this code. The minimum investigation fee shall be the same as the minimum fee set forth in Section 2. The payment of such investigation fee shall not exempt any person from compliance with all other provisions of this code nor from any penalty prescribed by law. B. Permit fee refunds: The building official may authorize refunding of not more than 80 percent of the permit fee paid when no work has been done under a permit issued in accordance with this code. The building official may authorize refunding of not more than 80 percent of the plan review fee paid when an application for a permit for which a plan review fee has been paid is withdrawn or canceled before any plan reviewing is done. The building official shall not authorize refunding of any fee paid except on written application filed by the original permitted not later than 180 days after the date of fee payment. Type of Permit or Section Description Fee License Requiring (a) Inspections outside of normal $60.00 per hour business hours (minimum charge-two hours) (b) Reinspection fees (minimum charge $60.00per hour $35.00) (c) Inspections for which no fee is $60.00 per hour specifically indicated (minimum charge- one-half hour) (d) Additional plan review required by $60.00 per hour changes, additions or revision to plans (minimum charge-two hours) (e) Fee to reissue building inspection $35.00 record card *Or the total hourly cost to the jurisdiction, whichever is the greatest.This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employee involved. (1) Building 400.03— $1 to $500(includes one inspection) $35.00 Permits 400.09 Each additional inspection $35.00 $501 to$2,000 26.25 for the first $500 plus$3-.2-5$_L.50 each additional $100, or fraction thereof,to and including $2,000 with a minimum fee of$35.00. $2,001 to $25,000 77.25 for the first $2,000 plus 15.50 for each additional $1,000, or fraction thereof, to and including$25,000. $25,001 to$50,000 436.50 for the first $25,000 plus$10.75$11.25 for each additional $1,000, or fraction thereof, to and including$50,000. $50,001 to$100,000 716.75 for the first $50,000 plus 7.75 for each additional $1,000, or fraction thereof, to and including$100,000. $100,001 to$500,000 $ ,nom 1 106.25 for the first$100,000 plus $6-88 6.25 for each additional $1,000, or fraction thereof,to and including $500,000. $500,001 to$1,000,000 $3,"� '� 3 599.25 for the first$500,000 plus $5-.G8 5.25 for each additional $1,000, or fraction thereof,to and including $1,000,000. 1,000,001 and up $5,o� ^� 6 242.50 for the first$1,000,000 plus $4.88 4.25 for each additional $1,000, or fraction thereof. (2) Driveway, 515.05 (no permit fee for sidewalks) $35.00 Parking Area Permits (3) Swimming 420.00 Permanent or portable pools are based on $35.00 building permit fees with a minimum of (4) Plan Review 400.03— 35%of building permit fee for one and two family dwelling detar=hed Fee 400.09 garage and basement remodels 65%of building permit fee for all other building permits, except no fee for the following: (a) Existing single family dwelling minor nonstructural alterations. (b) Single and two family dwelling repair and maintenance work. (c) Commercial and industrial repair and maintenance work not exceeding$1,000 or where plans are not required. Plan review fee Maximum 25%of permit fee based on Minnesota State Building Code for similar 1300.0160 buildings (5) Contractors Charged once each time a contractor $5.00 License applies for permit(s) Verification Fee (6) Moving- 845 Moving Permit Fee $50.00 Buildings (7) Structure 400.00— (a) Commercial Demolition cost as per $50.00 Demolition 400.09 Building Permit Schedule with a minimum of (b) Dwelling .... $50.00 One or two story $35.00 Residential -Garage and lesser structure (8) Plumbing 400.03— Residential $35.00 Permit 400.09 Minimum Fee 2%of Total Job cost with a minimum of(includes one inspection) Each additional inspection $35.00 (9) Plumbing 400.03— Commercial/Industrial/Multi-family Based $45.00 Permit 400.09 on Total Job cost 2%of Estimated Job cost with a minimum of(includes one inspection) Each additional inspection $35.00 (10) Electrical 400.03— Residential $35.00 Permit 400.09 (a) Minimum Fee which includes one inspection (b) Each additional Inspection $35.00 (c) Complete Wiring Fee: $150.00 Single Family Dwelling and each dwelling unit of a two family dwelling and includes not more than three inspections. (d) New Service-up to 200 amps $55.00 (e)Temporary Service-(for $45.00 construction) (f) Installation, addition alteration, or $8.00 repair of each circuit or feeder (g) Swimming pool or exterior hot tub $55.00 (11) Electrical 400.03— Commercial, Industrial and multiple $45.00 Permit 400.09 dwellings(more than two units) and Commercial Technology systems: Minimum Fee which includes one inspection Each additional inspection $35.00 (a) Based on total job cost $45.00 -2%of estimated job cost with a minimum of -Over$50,000- Fee/$1,000.00 plus 1%of cost over$50,000.00 (b)Traffic Signals: Per Intersection $185.00 (c) Fire Alarm: Based on %%of cost of $45.00 electrical job to customer with a minimum of (d) Carnivals,festivals and similar $110.00 events plus$35.00 for each service on generator (12) Electrical 400.03— Based on 2%of cost of electrical job to $45.00 Permit Signs 400.09 customer with a minimum of(separate electrical permit required for signs) (13) Residential 400.03— Central Systems and Additions, $35.00 Heating, 400.09 Alterations and Repairs Ventilating,Air 1%%estimated cost with a minimum of Conditioning and (Includes one inspection) Refrigeration Each additional inspection $35.00 Commercial Central Systems and Additions, $45.00 Heating, Alterations and RepairsIY2 estimated Ventilating,Air Conditioning and cost with a minimum of Refrigeration (14) Sign 415.01— (a)Temporary sign permit $35.00 Installation 415.11 (b) Permanent sign (any size) $100.00 Building permit is required for sign support structures Fees based on building permit fee schedule (15) Temporary 400 A temporary Certificate of Occupancy may $200.00 Certificate of be issued before completion of the entire Plus a letter of credit or cash Occupancy work covered by the permit, provided the escrow equal to 125%of the Chief Building Official deems that the remaining City Code building is safe to occupy requirements ZONING, LAND USE AND RELATED CHARGES Type of Permit or Section Description Fee License Requiring (1) Planned Unit 542 (a) $500 plus $5/$1,000 of project value $3,500.00 Development (construction cost) up to a maximum fee of (b) Major PUD Plan Amendment-$500 plus $3,500 $5/$1,000 of project value (construction cost) up to a maximum fee of (c) Minor PUD Plan Amendment $350.00 (2) Site Plan Review 547 (a) $500 plus $.50/$1,000 of project value $3,500.00 (construction cost)to a maximum fee of (b) Major amendment -$500 plus$.50/$1,000 $3,500 of project value (construction cost) to a maximum fee of (c) Minor amendment $350.00 (3) Variance 547 Residential $250.00 Non Residential $450.00 Variance Appeal Residential and Non Residential $150.00 (4) Conditional Use 547 (a) $500+ $.50/$1,000 of project value $3,500.00 Permit (construction cost) up to a maximum fee of (b) Major amendment-$500+ $.50/$1,000 of $3,500 project value (construction cost) up to a maximum fee of (c) Minor amendment $350.00 (5) Interim Use Permit 547 $500 plus$100/year monitoring fee up to a $1,000 maximum fee of (6) *Zoning District or....547 conn .,i $0.50/$1,000 { +., l,, X88...600.. Code Text Change (r=e stFuetie., eest) up+„a Maximum fee e (7) *Subdivision 500.01— $500.00 Approval 500.05 Subdivision Waiver 500.05- $350.00 Subd. 2 (8) Street/Easement 820/State $350.)Q$.500 Vacation Statute (9)....Appeal to Board of .547 .... $350.00 .... Adj. &Appeals (10) Special Request $350.00 to City Council (11). Zoning $50.00 Compliance Letter (12) Comprehensive $600.00 Plan Amend. (13) Plats: a;y 500 Preliminary Plat $500.00 9ufinal .... .... .... .... ...,.Final Plat .... .... .... .... .... .... 250 .... (14).. Sketch Plan. $250.00 .... Review (15) Extension Extension of a Land Use Approval (rezoning, site $125.00 plan approval, conditional use permit,variance, etc.) beyond its original approval period (16) Escrow 50. Administration Fee *Any additional expenses-incurred by the City in the course of processing a request will be charged to the applicant. FIRE SERVICES FEES Type of Permit or License Section Description Fee Requiring (6) Fire Extinguishing Based on Building Permit fee schedule with a $50.00 System Permit minimum of: Plan review fee: 65%of building permit fee, except no fee for the following: (a) no charge for valuation of$1,000 or less (7) Fire Alarm Systems Based on Building Permit fee schedule with a $50.00 minimum of: Plan review fee: 65%of building permit fee, except no fee for the following:;eol(a) no charge for valuation of$1,000 or less (8) Flammable or Tanks (installation or modification $150.00 Combustible Liquid or Gas Storage Tanks and Piping Installation or alteration of piping $50.00 Each unit or dispenser Underground Tank Removal $100.00/Tank MISCELLANEOUS FEES Type of Permit or License Section Description Fee Requiring (3) Antenna Commercial 425 &544 (a) CWTS antenna permit application fee $100.00 Wireless Telecommunication Service(CWTS) (b)Antenna permit fee for additional $35.00 antennas added to an existing antenna location or replacement of existing antennas at a location AFFIDAVIT OF PUBLICATION CITY OF RICHFIELD RESOLUTION NO.11296 STATE OF MINNESOTA ) RESOLUTION APPROVING COUNTY OF HENNEPIN ss SUMMARY PUBLICATION OF AN ORDINANCE AMENDING APPENDIX D Charlene Vold being duly sworn on an oath, OF THE RICHFIELD CITY states or affirms that he/she is the Publisher's CODE(FEE SCHEDULE) Designated Agent of the newspaper(s)known WHEabAS,the City has adopt- ed the above referenced amend- as: ment of the Richfield City Code; and SC Richfield WHEREAS,the verbatim text of the amendment is cumbersome, with the known office of issue being located and om let expense is publication of g the complete text is not justified. in the county of: NOW THEREFORE, BE IT RE- HENNEPIN SOLVED by the City Council of the with additional circulation in the counties of: City of Richfield that the following HENNEPIN summary is hereby approved for of- HENNEPIN publication: and has full knowledge of the facts stated SUMMARY PUBLICATION below: BILL NO.2016-22 has complied with all of AN ORDINANCE AMENDING (A)The newspaper p APPENDIX D OF THE RICHFIELD the requirements constituting qualifica- CITY CODE(FEE SCHEDULE) tion as a qualified newspaper as provided This summary of the ordinance by Minn. Stat.§331A.02. is published pursuant to Section (B)This Public Notice was printed and pub- 3.12 Thios f the ordinance Richfield mCakeity s Charter.the fol- lished in said newspaper(s) once each lowing changes to the City Code: week, for 1 successive week(s); the first Increases building permit fees insertion being on 12/22/2016 and the last 4-5%, depending on the value of the project;adds a separate$250 insertion being on 12/22/2016. fee for consideration of a Final Plat application; increases right-of-way MORTGAGE FORECLOSURE NOTICES and similar Vacation application fee Pursuant to Minnesota Stat. §580.033 to$500; and adds an Administra- relatin to the publication of mortgage five Escrow Fee oe$or g p Copies of the ordinance are foreclosure notices: The newspaper complies available for public inspection in with the conditions described in §580.033, the City Clerk's office during nor- subd. 1, clause (1) or(2). If the newspaper's mal business hours or upon re- known office of issue is located in a county quest by calling the Department of Y Community Development at (612) adjoining the county where the mortgaged 861-9760. premises or some part of the mortgaged Adopted by the City Council of premises described in the notice are located, the City of Richfield,Minnesota this a substantial portion of the newspaper's D b day of December,Mayor 2016. p Debbie Goettel,Mayor circulation is in the latter county. ATTEST:Elizabeth VanHoose City Clerk (� �y � n Published in the By: 1.t0��1��A9� �� Richfield Sun Current y. December 22,2016 Designated Agent 634125 Subscribed and sworn to or affirmed before me on 12/22/2016 by Charlene Vold. Notary Public 1=AI RIE MACPHERSON u blic-Minnesota on Expires Jan 31,2019 Rate Information: (1)Lowest classified rate paid by commercial users for comparable space: $34.45 per column inch Ad ID 634125